Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

36th Avenue Road Rehabilitation Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Clearlake, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Full Description

Show more
The project is limited to the installation of 510 linear feet of dual 8- gauge 38”x57” corrugated metal pipe arched culverts and the realigning of Molesworth Creek to convey flow beneath 36th Avenue, between Eureka Ave and Phillips Ave. The culvers will receive end treatments including headwalls and 1,200 square feet of rock slope protection placed within the channel of Molesworth Creek. Following the installation of the culverts they will be covered with approximately 12 inches of engineered materials, road prism, or stabilized with rock slope protection. Disturbed areas will be revegetated where appropriate. The culvert installation is part of a larger project to rehabilitate 36th Avenue which includes grading, importing 500 cubic yards of fill material to raise low points, compaction, placement of aggregate base rock, and application of asphalt. Asphalt shoulders, driveway tie-ins, and transitions to existing roadway segments will also be completed during this project. The project may include realignment of water distribution lines and sewer lateral installation. All materials will be staged on site. The project will not involve the diversion or impoundment of Molesworth creek. The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement EPIMS Notification No. LAK-59831-R2, pursuant to Fish and Game Code section 1602 et. seq, to the project Applicant, City of Clearlake

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting quotes for the North Hollywood Central Remediation Well Collector Line project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, covering site preparation, construction, and finishing services. Key activities include land surveying, site photography, subsurface investigation, tunneling, boring, jacking, micro tunneling, and the installation of utilities and cathodic protection. Additionally, the project requires asphalt paving, concrete drilling, saw cutting, welding services, landscaping, and the provision of materials such as ready mix and precast concrete. Environmental and safety requirements include storm water pollution prevention (SWPPP) and traffic control. This opportunity is set aside for Small Business (SB), SBA certified Women-Owned Small Business (WOSB), and Disadvantaged Business Enterprise (DBE) – Dept of Transportation. To be considered responsive, bidders must possess a valid California Contractor’s license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with Kiewit reimbursing the bond premiums. Bidders must also demonstrate an ability to foster and maintain labor harmony on the project. Interested firms should contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of December 16, 2026.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237310
New
International
Buckinghamshire Highways Works Open Framework
Solicitation # BC/0002075
The Buckinghamshire Highways Works Open Framework, solicitation BC/0002075, is a procurement by Buckinghamshire Council to establish an Open Framework Scheme for highway-related construction, capital-funded maintenance, and improvement schemes. The framework is designed to enhance the operation and serviceability of highway assets and is divided into seven discrete lots, with the intention of appointing a maximum of four suppliers per lot. The total estimated value of the contract ranges from £126,030,000 excluding VAT to £151,236,000 including VAT, with a maximum total duration of eight years from the commencement of the initial framework agreement, estimated to end by April 1, 2035. The procurement process is conducted in two stages, beginning with a Pre-Qualification Stage (PSQ) that evaluates financial standing, health and safety policies, and data protection. Bidders must meet specific insurance requirements, including £20m for both Employer’s and Public Liability Insurance and £5m for Professional Indemnity Insurance. Award decisions are based on the most advantageous tender, weighted 60% on price and 40% on quality. Quality assessments focus on technical capability, service delivery, the NEC4 delivery model, innovation, social value, and sustainability. Performance will be monitored through five core Key Performance Indicators (KPIs) and additional call-off KPIs. There is no set-aside status for this solicitation.
Buckinghamshire Council

POSTED

about 18 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
Curtiss Park Trail State Project No. 128-158
Solicitation # E26-01
The Town of Simsbury is soliciting bids for the Curtiss Park Trail project, State Project No. 128-158, which involves the construction of approximately 3,000 linear feet of bituminous concrete multi-use trail. The trail will run along the north side of Tariffville Road, crossing the Farmington River via an existing sidewalk on the Tariffville Road bridge, and extending to Curtiss and Pattison Parks. The scope includes the construction of a boardwalk section within and adjacent to wetlands in the Farmington River riparian corridor. This project is funded through the Transportation Alternatives Program and is administered by the Connecticut Department of Transportation. The contract will be awarded to the lowest responsive and responsible bidder who is properly licensed, adequately staffed, and experienced in the required work. Bidders must provide a CTDOT contractor prequalification certificate and submit a physical bid package including a non-collusion affidavit, bid security, and a hold harmless and indemnification agreement. Key technical requirements include adherence to CTDOT Standard Specifications and Connecticut Guidelines for Soil Erosion and Sediment Control. Revised bid quantities include 1,172 cubic yards of earth excavation and 1,710 tons for the disposal of controlled materials. There is no set-aside status for this solicitation, and the DBE participation goal is zero percent. Bids are due by November 24, 2026, at 2:00 PM.
DAS Procurement

POSTED

about 21 hours ago

DEADLINE

in 2 days
View Details

More opportunities from California → City of Clearlake

Same awarding agency

NAICS: 541330
SLED
Draft EIR - Clearlake Airport Redevelopment Project
Solicitation # 2024070264
The Clearlake Airport Redevelopment Project is a conceptual master plan led by the City of Clearlake to transform a 54-acre former airport site into a mixed-use destination. The development is organized into three distinct Planned Development Zone Districts: Zone District 1 focuses on mixed-use multifamily housing and hotels; Zone District 2 serves as the primary commercial and wellness hub featuring healthcare facilities, medical offices, and a public market; and Zone District 3 is dedicated to heavy commercial use, including retail and drive-through restaurants. The project aims to attract jobs and commerce, establish a new city brand at the South Gateway, and maintain visibility along State Route 53 through the implementation of walkable retail, public spaces, and water-efficient landscaping. The scope of work includes the installation of comprehensive utility infrastructure, parking and transit facilities, and streetscape improvements. As part of the California Environmental Quality Act process, a Draft Environmental Impact Report was issued on June 17, 2026, identifying potential impacts on air quality, noise, and biological resources, with a public review period extending to August 3, 2026. Key regulatory requirements include strict adherence to Cal-OSHA asbestos abatement standards, compliance with the California Building Code Chapter 7A for fire hazard zones, and the protection of confidential archaeological data. Project execution will involve several discretionary actions, including zoning map amendments, planned development approvals, and the issuance of grading and building permits.
Engineering Services

POSTED

5 months ago

DEADLINE

N/A
View Details

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS