This project, identified as Bid No. 27-WW-08, involves comprehensive upgrades to the Water Reclamation Facility in the City of Holly Hill, Florida. The scope of work requires the contractor to provide all labor, materials, and equipment to execute Phase 2, Parts A and B of the 3rd BTU and Resiliency Improvements. Primary technical requirements include converting a sand media filter system to a cloth media system, modifying chemical storage and feed rooms for liquid sodium bisulfite, and upgrading the sulfur dioxide and gaseous chlorine storage building with new HDPE tanks and metering pump skids. The project also entails installing buried chemical feed tubing, PVC diffusers, and necessary electrical infrastructure to integrate these systems into the existing motor control centers. Additionally, the contract includes several additive alternate bid items that may be selected. These potential additions involve installing new air blowers and canopies for sludge tanks and post aeration basins, replacing reclaimed water transfer pumps, and upgrading high service pump motors with variable frequency drives. A significant technological upgrade is also listed as an alternate, which includes replacing the plant's SCADA server and software, installing four new master control panels, and renewing fiber optic and communication cabling throughout the facility.

General Info

Water Reclamation Facility upgrades in Holly Hill, Florida, including filtration and chemical system improvements.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFlorida → City Of Holly Hill — Wastewater
Contacts2 people available
OfficeFL
Office AddressFL
Contacts
Mary Mearsheimer
Michele Moore

Interested Companies (16)

AMCON Development GroupWinter Springs, FL
Anderson Place Construction
B T Smith

See All 16 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The work of this project consists of furnishing all labor, materials, equipment, tools, transportation, services, and incidentals and performing all work necessary to construct 3RD BTU & RESILIENCY IMPROVEMENTS, PHASE 2, PARTS A & B BID NO. 27-WW-08 All above referenced work shall be complete, in place, and ready for service in accordance with the drawings and specifications prepared therefore by Mead & Hunt and entitled, 3RD BTU & RESILIENCY IMPROVEMENTS, PHASE 2, PARTS A & B The location of the project is the City of Holly Hill, Florida. Description of Work: The project involves upgrades to the City of Holly Hill’s Water Reclamation Facility (WRF). The WRF improvements involve: • Conversion of one (1) existing traveling bridge automatic backwash sand media filter system to a cloth media filtration system. • Modification of an existing storage area and chlorine feed room and installation of a new metering pump skid and related piping, valves, and electrical work for a new liquid sodium bisulfite storage and feed system. • The modification of an existing sulfur dioxide and gaseous chlorine storage building, and installation of new HDPE storage tanks, metering pump skids, a liquid chemical feed control panel, fill station control panels, and related piping, valves, and electrical work. • Installation of new buried chemical feed carrier tubing, containment pipe, chemical pull boxes to the filter influent, chlorine contact chamber, and effluent pump station wetwell. • Installation of PVC diffusers, NPW dilution water piping and motorized control valves for dispersal of dosed chemical at the chlorine contact chamber, filter influent and dechlorination chamber injection points. • Associated electrical work in electrical rooms to incorporate into MCCs and running electrical wire and conduit to equipment. The following additional improvements may be selected as Additive Alternate Bid Items: • Installation of a new air blower, piping, concrete pad, and overhead canopy for providing air to an existing sludge tank. • Installation of two (2) new air blowers, piping, concrete pad, and overhead canopy for providing air to existing post aeration basins. • Replacement of two (2) existing wetpit submersible reclaimed water transfer pumps with three (3) new submersible reclaimed water transfer pumps. • Replacement of pump motors and installation of new variable frequency drives on existing high service reclaimed water pumps. Replacement the plant’s existing SCADA server with a new server hosting a new SCADA system software for the entire plant (all existing and new processes), and process integration and programming as required to develop new monitoring control screens in the new SCADA software. Replacement of four (4) existing plant master control panels with new control panels. Replacement of existing fiber optic cables, running new communications cables and conduits from all new installed equipment and existing equipment to the plant control system/SCADA.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, solicitation number 2027-027. This opportunity is open to various small business set-asides, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified firms. Interested parties must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter, as well as 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional structural requirements include the installation of standard and doghouse manholes, drop assemblies, and a CSO regulator fit out. Site preparation tasks encompass the clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation of a Stormwater Pollution Prevention Plan. Key project deliverables and requirements include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, geotechnical instrumentation and monitoring, and the procurement of specific railroad insurance. The project also involves various abandonment tasks for existing pipes and manholes, as well as extra depth excavations. All inquiries and quotations should be directed to John Connelly at Cleary Construction.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 25 days
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, identified as solicitation SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days for substantial completion. The contract is governed by EJCDC C-700 Standard General Conditions and C-520 Agreement for Stipulated Price, with Willis Engineers serving as the Owner's representative. Award will be granted to the responsible bidder submitting the lowest responsive bid, with a requirement that the contractor self-performs at least 50 percent of the original contract amount. Bidders must provide performance and payment bonds, proof of insurance from companies rated A-VII or better by A.M. Best, and evidence of authority to do business in the state. Compliance with M/WBE participation goals is required, specifically a combined state goal of 10 percent, with mandatory submission of a Good Faith Efforts Form and Table A to be considered responsive.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 1 day
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS