This Solicitation opportunity from Department Of Defense was posted on September 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
400Hz Solid-State Ground Power Unit
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Solicitation W912R1-26-Q-A038 is a firm fixed price requirement for one mobile, shore-powered solid-state Ground Power Unit (GPU) and frequency converter to support UH-60M Blackhawk aircraft maintenance and servicing. The equipment must provide clean 400 Hz AC ground electrical power and comply with MIL-STD-704F and IEEE C62.41 standards. The benchmark configuration is the Unitron PwrKart UFC-45M, and the unit must be a non-combustion, electric-only system featuring a weather-protected enclosure and flat-free solid tires. Per government clarification, a pushcart is acceptable for hangar use, and the input cable should be provided with a blank end as the government will install its own plug. This is a total small business set-aside procurement managed by the Department of Defense for the DC ARNG, with delivery required by November 30, 2026, to Joint Base Anacostia. Award will be based on price alone, provided the lowest-priced quote is technically acceptable. The contractor must provide DoD unique identification for the equipment in accordance with MIL-STD-130 and utilize the Wide Area WorkFlow (WAWF) system for all invoicing and receiving reports. All quotes must be submitted at the unclassified level via email to the primary point of contact by September 25, 2026.
General Info
Place of Performance
DC, 20373, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Q&A as of 9/23/2026:
Q1. The description calls out for model UFC-45M which is a pushcart and in the description document, paragraph 3.1, it appears you are asking for a towable cart. Please advise which is required.
A1. Yes, push cart is fine; will be used inside the hangar.
Q2. – The description of the AC input cable in paragraph 3.3 states adding an input plug matching the facility receptacle. Will the ARNG be supplying the plug? If the awardee needs to supply, the part number of the plug is required.
A2. Blank end of cord is fine; the Government will install our own plug end.
The DCNG requires a a mobile, shore-powered (electric) solid-state Ground Power Unit (GPU) / Frequency Converter. The primary purpose of this equipment is to provide clean 400 Hz AC ground electrical power to support hangar and flightline maintenance, pre-flight troubleshooting, and servicing of military aircraft (specifically UH-60M Blackhawks). See attached Purchase Description and solicitation for further details.
More opportunities from Department Of Defense → W7M1 Uspfo Activity Dc Arng
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
