Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of The Interior was posted on May 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

43--A3 WELL BOOSTER

Closed
140G0126Q0149Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333914
New
Federal
LOP Fire Protection and Unwatering Pump System
Solicitation # W9127N26QA155
Solicitation W9127N26QA155 is a total small business set-aside for the procurement of a fire protection and unwatering pump system for the Lookout Point Powerhouse in Lane County, Oregon. Issued by the Department of Defense W071 Endist Portland, this firm-fixed-price requirement is necessitated by a deep reservoir drawdown that would otherwise disable critical service water and fire protection systems. The scope of work includes the delivery of a 650 GPM vertical pump/motor assembly, a 0.25 HP jockey pump system, a fire pump controller panel, overload protection, and various piping and fitting components. All equipment must meet AWWA E103 and HI 9.1-9.5 standards, with a delivery deadline of March 1, 2027, shipped FOB destination to Lowell, Oregon. The government will award a single purchase order based on an evaluation of technical compliance, past performance, and price, utilizing the HUBZone price evaluation preference. Offerors must be registered in the System for Award Management under NAICS code 333914 and submit a complete quote package via email to the designated point of contact. The solicitation underwent two amendments, with the final response deadline extended to September 11, 2026. Key contractual requirements include compliance with MIL-STD-129 for marking, DFARS cybersecurity and telecommunications regulations, and specific pump acceptance criteria according to HI ANSI/HI 14.6 grade 2B.
W071 Endist Portland

POSTED

1 day ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The USGS Columbia Environmental Research Center is seeking a contractor to remove and replace an existing centrifugal pump with two redundant inverter-duty centrifugal pumps capable of delivering 200 gallons per minute at a head between 120 and 200 feet, along with installing a properly sized Variable Frequency Drive (VFD) equipped with a bypass function and BACnet communication capability. The project also includes replacing all associated piping to ensure redundancy, installing a digital flow meter and digital pressure gauges on both suction and discharge lines with BACnet functionality, and ensuring all electrical work complies with current National and Local Electrical Code standards. The new pumps must be level, easily accessible for maintenance, and the entire system must be commissioned to support current operational needs while allowing for future growth. Work is to be performed at the USGS facility located at 4200 New Haven Road, Columbia, Missouri, and must be completed within 30 calendar days after issuance of the Notice to Proceed. This acquisition is structured as a 100% Small Business Set-Aside under NAICS Code 333914 with a size standard of 750 employees, meaning only small business concerns may submit proposals. All vendors must be registered in SAM.gov to be eligible for award, and proposals must be submitted electronically via email to dayna_parkin@ios.doi.gov—faxed submissions are not accepted. A mandatory site visit is scheduled for May 21, 2025, and attendance requires advance registration with the designated contacts. The solicitation closed on June 3, 2026, with award anticipated on June 5, 2026. The contract requires the submission of a lump sum price on page 3 of the proposal, including a detailed breakdown of material, labor, overhead, profit, and bond costs. A bid bond is required with the quote, and upon award, the contractor must provide Performance and Payment Bonds using SF25-23a and SF25A-16d forms within 14 days, along with proof of liability insurance and a listing of all subcontractors. Invoicing must be submitted electronically through the Treasury’s Invoice Processing Platform (IPP), with payments governed by the Prompt Payment Act, and final invoice submittal must include the DI-137 Release of Claims form. All work must comply with applicable federal, state, and local regulations, including indoor air quality during construction standards, and must be performed by

General Info

Replace centrifugal pump with two VFD pumps; ensure compliance, 30-day completion, performance-based award.

Agency

Department Of The Interior → Ofc Of Acqusition Grants-NationalView Agency

Contract Value

$106,011

NAICS

333914 - Measuring, Dispensing, and Other Pumping Equipment ManufacturingView NAICS

Place of Performance

VA

Set-Aside

SBA

Awardee

GFS SUPPLY & SERVICES COMPANY, INC.View Profile

Award Issued Date

Documents

(12)

Solicitation 140G0126Q0149 - Construction IFB for Pump Replacement

PDFifb

B08 Statement of Work for Administration Building Well Water Pump Upgrade

DOCXsow

B08_Attachment_8_Image_of_centrifugal_pump.jpg

JPG

Standard Form 1413 Statement and Acknowledgment of Subcontractor

PDFstatement-and-acknowledgment

Amendment 0002 to Solicitation 140G0126Q0149 - Closing Date Extension

PDFamendment

Payment Bond Standard Form 25A

PDFpayment-bond

Release of Claims Form DI-137

PDFrelease-of-claims

Solicitation 140G0125Q0186 Past Performance Questionnaire

PDFpast-performance

Wage Determination M020260084 for Building Construction in Boone and Howard Counties, MO

PDFwage-determination

Amendment 0001 to Solicitation 1400126Q0149

PDFamendment

Performance Bond Standard Form 25 (SF25-23a)

PDFperformance-bond

B08_Attachment_7_Payroll_WH-347.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Amendment 1

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Ofc Of Acqusition Grants-National
Contacts1 person available
OfficeRESTON, VA, 20192, USA
Organization / Agency
Department Of The Interior → Ofc Of Acqusition Grants-National
View Agency Profile
Office AddressRESTON, VA, 20192, USA

Full Description

Show more
The USGS Columbia Environmental Research Center has a requirement for the removal and replacing the existing centrifugal pump and install an appropriately sized VFD (Variable Frequency Drive) and support controls. The removal of the existing centrifugal pump and installing the appropriately sized VFD includes, but not limited to the following:

- All circuits shall be installed to the existing Local and National Electrical Code Standard.

- Remove the current pump and replace with two (2) redundant inverter- duty centrifugal pumps that meet current needs and support future growth.
- Remove the current motor starter and replace with a properly sized VFD and accurately sized circuit protection.
- New pump(s) shall be capable of a minimum of 120 feet of head up to maximum of 200 feet of head.
- New pump(s) shall be capable of flowing 200 gallons per minute of water.
- The VFD shall have a bypass function.
- The VFD shall have BACnet capabilities.
- Install a digital flow meter with BACnet capabilities.
- Install digital pressure gauges with BACnet capabilities on the suction and discharge piping.
- Remove and replace the current piping to allow redundancy.
- New piping shall have a bypass installed.
- Pumps shall sit level and be easily accessed for maintenance/replacement.

- Work will take place in the following county in Missouri: Boone.

- Period of Performance is 30 days after notice to proceed is issued.

- Request for Quotes (RFQ) 140G0126Q0149 will close May 29, 2025, at 10:00 am pacific standard time.

- A site visit will be held on Thursday May 21, 2025, at 9:00 a.m. central time CONTRACTORS ARE STRONGLY ENCOURAGED TO ATTEND THE SITE VISIT. For site visit information please refer to FAR Clauses 52.236-27 and 52.236-27A*1. If you are planning to attend, please email either Dayna Parkin or Michael Prince at dayna_parkin@ios.doi.gov or mprince@usgs.gov to provide you're the names who are going, and emails along with phone numbers no later than 24 hours before the site visit starts.

- The NAICS Code is 333914. The size standard is 750. This acquisition will be 100% Small Business Set Aside.

- The anticipated award date of the contract is June 05, 2026. A vendor must be registered at https://www.sam.gov/portal to be eligible for award. All responsible sources may submit a proposal which shall be considered by the agency. Quotes may be emailed to dparkin@usgs.gov. Faxed Quotes will not be accepted.

- Amendment 0001 has been implemented to remove is to remove FAR Clause 52.228-13 Alternative Payment Protections. (JUL 2000) and adding Attachment 9 Performance Bond SF25-23a.

- Amendment 0002 has been implemented to extend the closing date from: May 29, 2026, at 10:00 am pacific time to: Wednesday, June 3, 2026 at 12:00 PM pacific time.

More opportunities from Department Of The Interior → Ofc Of Acqusition Grants-National

Same awarding agency

NAICS: 334516
New
Federal
Vibracoring System
Solicitation # 140G0126Q0293
The USGS Geological Survey Florence Bascom Geoscience Center (FBGC) is soliciting quotes under solicitation 140G0126Q0293 for the purchase of a lightweight vibra-coring system to evaluate sub-bottom stratigraphy in coastal areas, rivers, and lakes. The required system must weigh between 100 and 200 lbs, provide at least 3000 lb/ft of adjustable impact force, and exceed 1000 vibrations per minute. Technical specifications include compatibility with 3 and 4-inch core barrels, the ability to collect cores longer than 5 meters, and flexibility to switch between DC-AC or 120-220v power supplies. The procurement also includes the acquisition of a power transformer and 250 meters of cable, with all items to be delivered to Reston, VA, within 60 days after receipt of order. This is a total small business set-aside under NAICS code 334516, with a size standard of 1,000 employees. The contract will be awarded to the responsible offeror providing the lowest priced quotation that receives an acceptable technical compliance rating. Vendors must be registered in the System for Award Management (SAM) and comply with the Buy American Act. Quotes are due by September 16, 2026, with an anticipated award date of September 17, 2026. Payment will be processed electronically through the Invoice Processing Platform (IPP), and invoices must be submitted within 90 calendar days following the expiration of the period of performance.
Analytical Laboratory Instrument Manufacturing

POSTED

1 day ago

DEADLINE

in 4 days
View Details
NAICS: 334516
New
Federal
USGS PARR REACTOR
Solicitation # 140G0126Q0296
The U.S. Geological Survey Geology, Energy and Minerals Science Center is seeking quotations for a brand name Parr 300 mL titanium alloy high pressure high temperature reactor and associated accessories. The procurement includes a Series 4760 pressure vessel system with a 1200 psi maximum allowable working pressure, a benchtop stand, a 4838 temperature controller, gas filling hoses, and SpecView datalogging software. Due to existing laboratory infrastructure and software compatibility, the requirement is restricted to Parr Instrument Company, though competition is sought among authorized resellers. The contract is a total small business set-aside under NAICS code 334516, utilizing a firm-fixed price structure and the lowest priced technically acceptable award basis. Deliverables must be delivered to Reston, Virginia, within 60 days of the purchase order receipt. The acquisition includes strict compliance requirements, including Section 508 accessibility standards for the SpecView software, which requires the submission of an Accessibility Conformance Report. Additionally, the contractor must adhere to FISMA IT security guidelines, including NIST and DOI System Development Life Cycle standards. Quotations are due by 1:00 PM Eastern Daylight Time on September 18, 2026, and the anticipated award date is September 30, 2026. All successful vendors must be registered in the System for Award Management and submit payment requests electronically via the Invoice Processing Platform.
Analytical Laboratory Instrument Manufacturing

POSTED

1 day ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS