Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

43--PUMP,CENTRIFUGAL - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF

Open
N0010426QTC47Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Solicitation N0010426QTC47, issued by NAVSUP Weapon Systems Support Mech, is a fixed-price request for quotations for the teardown, evaluation, and repair of centrifugal pump units, specifically NIIN 004511267 and NIIN 014918644. The scope requires that repaired units meet all operational and functional requirements as defined by the specified Cage Codes and reference numbers, achieving an operable condition capable of performing as a new unit. All work must adhere to contractor standard practices and approved technical procedures, with physical identification following MIL-STD-130 and packaging complying with MIL-STD-2073 and MIL-P-16789. Specialized requirements include oxygen cleaning per MIL-STD-1330 and strict palletization standards under MIL-STD-147. The government will make a single award based on the most advantageous offer, prioritizing past performance over price. Evaluation includes risk assessments via the Supplier Performance Risk System regarding item, price, and supplier risk. Contractors are subject to a mandatory Repair Turnaround Time, with failure to meet this requirement resulting in per-unit monthly price reductions. Quality assurance is managed through Government Source Inspection at the point of origin, and all payment requests must be processed electronically via the Wide Area Workflow system. The response deadline for this solicitation is November 16, 2026.

General Info

Fixed-price contract for repair of centrifugal pump units due November 16, 2026.

NAICS

333914 - Measuring, Dispensing, and Other Pumping Equipment Manufacturing

Place of Performance

PA, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstrfq
High

Read the document

Due in 29 days

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 29 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 1 solicitation documentRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseSolicitation
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Response deadline changed from Nov 16, 2026 to Dec 16, 2026. The notice description changed.

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support Mech
Contacts1 person available
OfficeMECHANICSBURG, PA, 17050-0788, USA

Full Description

Show more
CONTACT INFORMATION|4|N771.4|WG3|Sign up to see this detail|Sign up to see this detail| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|ISO9002| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBO INVOICE AND RECEIVING||TBD|N00104|TBD|TBD|SEE SCHEDULE|SEE SCHEDULE|SEE SCHEDULE||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS MECHANICSBURG| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|ALISON HARPER AT Sign up to see this detail| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(JUL 2026))|2||| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEV 2026-O0015)(JUL 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|X|X|X|||X|X||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| Amendment to update clauses and extend solicitation closing. This solicitation is issued pursuant to Emergency Acquisition Flexibilities (EAF). Accelerated and incremental delivery is encouraged and accepted before the delivery date(s) listed in the schedule. All freight is FOB Origin. This RFQ is for repair. The resultant award of this solicitation will be issued bilaterally, requiring the contractors written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. The Government is seeking a Repair Turnaround Time (RTAT) of: 239 Days Government Source Inspection (GSI) is required. Please note freight is handled by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work. Your quote should include the following information: QUOTE AMOUNT AND RTAT Unit Price:__________ Total Price:__________ Repair Turnaround Time (RTAT): _______ days If your company is not quoting the Government's Required Repair Turnaround Time (RTAT) or earlier, provide your company's capacity constraints? _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractors facility as reflected in the Acction Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE) ___ TESTING AND EVALUATION IF BEYOND REPAIR T&E fee/price (if asset is determined BR/BER): __________ AWARDEE INFO & PERFORMANCE LOCATION Awardee CAGE: __________ Inspection & Acceptance CAGE, if not same as "awardee CAGE": __________ Facility/Subcontractor CAGE (where the asset should be shipped), if not same as "awardee CAGE":__________ IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW New unit price:__________ New unit delivery lead-time:__________ IMPORTANT NOTE: Any asset for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late - any delay determined to be excusable (e.g. Government Delay) will not result in a price reduction. If a price reduction is required due to unexcusable contractor delay, the Contracting Officer will implement the price reduction via a "reconciliation modification" at the end of the contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. In reference to the above important note, the contractor provides the following price reduction amount per unit per month the contractor does not meet the RTAT: $__________, up to a maximum of: $_________. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the PUMP UNIT,CENTRIFUG . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The PUMP UNIT,CENTRIFUG repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;83130 NA1049-2 4BJ65 NA1049-2 (AUTH.DISTR.FOR 83130); 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 4.4 Inspection/Testing Repaired Items - The Contractor shall perform all inspection and testing requirements as specified in the original manufacturer's specifications and drawings. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVSUP-WSS Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding Officer NAVSUP-WSS Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch 700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS. 6.2 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings. There are 7 (seven) seperate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A... approved for public release; distribution is unlimited. B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only. F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161. 1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the PUMP,CENTRIFUGAL . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The PUMP,CENTRIFUGAL repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;83130 RJP-95 83130 RJP-95/POSITION3 4BJ65 RJP-95/POSITION3 (AUTH.DISTRIB.FOR 83130) 4BJ65 NA1943-2 ; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 4.4 Inspection/Testing Repaired Items - The Contractor shall perform all inspection and testing requirements as specified in the original manufacturer's specifications and drawings. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings. There are 7 (seven) seperate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A... approved for public release; distribution is unlimited. B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only. F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161. 6.2 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVSUP-WSS Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding Officer NAVSUP-WSS Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch 700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS.

Similar Contracts

Same NAICS industry code

NAICS: 333914
New
SLED
Purchase and Delivery of Intelligent Auto-Flusher
Solicitation # RFB 27-023
The City of Clermont is soliciting bids under RFB 27-023 for the purchase and delivery of one new Intelligent Auto-Flusher for its Public Services Department. The required equipment is a Kupferle Eclipse 9700i-Solar Intelligent Automatic Flushing Station or an approved equivalent, designed to maintain free chlorine residual levels. Key technical specifications include a free chlorine sensor with a measurement range of 0.00 to 5.00 ppm or greater and a standard 2.5-inch National Standard Thread fire hydrant outlet. The unit must be new, fully assembled, and delivered F.O.B. Destination within 30 consecutive calendar days of the purchase order issuance. The contract will be awarded to the lowest responsive and responsible bidder who meets all technical requirements. Bids must be submitted electronically via the City's OpenGov Portal by December 10, 2026, and must remain valid for 90 days. The agreement includes several compliance mandates, including adherence to the Davis-Bacon and Copeland Acts, Florida drug-free workplace and E-Verify statutes, and Florida Executive Order 22-216 regarding cybersecurity. Additionally, the contractor is required to provide performance and labor and material payment bonds. The City reserves the right to inspect equipment upon delivery, with a requirement that any deficiencies be corrected within 10 business days at no additional cost.
Public Services - Environmental Svcs.

POSTED

about 23 hours ago

DEADLINE

in 22 days
View Details
NAICS: 333914
New
DIBBS
PUMP, ROTARY
Solicitation # SPE7M1-27-T-2743
Solicitation SPE7M1-27-T-2743, issued by the DLA Weapons Support Maritime Supply Chain, is for the procurement of 85 rotary pumps (NSN 4320-01-673-1390). The contract requires a delivery period of 244 days after receipt of order and specifies that inspection and acceptance will occur at the origin. The procurement includes a First Article Test (FAT) requirement, necessitating the testing of two units and providing written notice to the Contracting Officer and Quality Assurance Representative at least 14 days prior to shipment. Technical compliance is governed by specific source-controlled drawings and the DLA Master List of Technical and Quality Requirements, with a mandate that the manufacturer's inspection system complies with ISO 9001:2015 or an equivalent standard. The contract imposes strict cybersecurity and export control mandates, requiring Cybersecurity Maturity Model Certification (CMMC) Level 2 and adherence to DFARS 252.204-7012 for safeguarding covered defense information. Technical data is subject to ITAR or EAR export controls, limiting distribution to certified contractors. Packaging must adhere to ASTM D3951 and MIL-STD-129, with specific requirements for hazardous materials and radioactive substances. Financial administration is handled via the Wide Area WorkFlow (WAWF) system. While the solicitation is listed as a total small business set-aside in some metadata, other sections indicate it is not a small business set-aside; offerors are prohibited from using additive manufacturing processes unless specifically authorized.
DLA WEAPONS SUPPORT MARITIME SUPPLY CHAIN

POSTED

1 day ago

DEADLINE

in 12 days
View Details

More opportunities from Department Of Defense → Navsup Weapon Systems Support Mech

Same awarding agency

NAICS: 332919
New
Federal
VALVE,REGULATING,FL
Solicitation # N0010426QNC91
This contract pertains to the repair and refurbishment of a regulating valve critical to a shipboard system, designated as SPECIAL EMPHASIS material due to its direct impact on safety, reliability, and operational integrity of naval vessels. The work requires strict adherence to referenced military and commercial specifications including ASTM-A581, ASTM-A582, SAE AMS 5643, MIL-STD-2035, MIL-STD-792, and multiple NAVSEA and S9074 series standards for welding, brazing, material certification, and nondestructive testing. All components must be refurbished to comply with specific drawings including V3D10233 and WI-S1E10035, with traceability maintained from raw material through final assembly using approved markings, heat lot codes, and validated certifications. The contract mandates that all materials be traceable to chemical and mechanical test reports, and any processed or repaired components must undergo re-certification if their properties are altered. The contractor must submit comprehensive documentation including Welding Procedure Specifications, Procedure Qualification Records, Consumed Weld Metal Certificates, and Final Certificates of Compliance through the Wide Area WorkFlow system, with final acceptance required prior to shipment. The contractor must operate under a quality system certified to ISO-9001 with supporting calibration controls per ISO-10012 or ANSI-Z540.3, and is subject to Government Quality Assurance at source by DCMA personnel. All subcontractors must be vetted for capability, and their work must conform to the same rigorous standards. For repair work, the vendor has 180 days from receipt of the carcass to perform a teardown and evaluation and submit a Firm-Fixed Price quote that includes all labor, materials, and handling costs. A mandatory Repair Turn Around Time of 365 days applies, with price reductions imposed for failure to meet deadlines and potential termination for default. No mercury may be present in components, and marking of materials is strictly controlled to avoid improper identification. All waivers and deviations—classified as Critical, Major, or Minor—require prior written approval by the Contracting Officer and must be submitted via ECDS. Certifications must be complete, unqualified, and directly linked to physical markings on each part; missing, incomplete, or ambiguous documentation results in rejection. The contract operates under Emergency Acquisition Flexibilities, is rated under DPAS, and requires bilateral acceptance before execution. All documentation must be submitted electronically via WAWF with designated
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332919
New
Federal
PARTS KIT,BALL VALV
Solicitation # N0010426QYAGR
This solicitation, issued by NAVSUP Weapon Systems Support Mech, is a total small business set-aside for the manufacture, teardown, evaluation, and repair of ball valve parts kits (NSN 4820-01-345-5706). The requirement is pursued under Emergency Acquisition Flexibilities and will be awarded as a bilateral fixed-price contract. The government is seeking a single award based on the most advantageous offer, with past performance weighted as more important than price. The evaluation will specifically consider the lowest aggregate total price, including a government option to order an additional quantity of up to 100 percent for 365 days after receipt of order. Key technical requirements include strict adherence to MIL-STD-130 for physical identification and a total prohibition of metallic mercury contamination. The contractor must maintain a quality system compliant with MIL-I-45208 or ISO 9001/9002. Deliverables must be packaged and marked according to MIL-STD-2073-1 and MIL-STD-129, with a required delivery turnaround time of 120 days. Failure to meet the established Repair Turn Around Time will result in unit price reductions. Offerors must provide estimated repair pricing, teardown and evaluation rates, and throughput constraints in their quotes, which are due by October 19, 2026. Payment will be processed electronically via the Wide Area Workflow system.
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

about 7 hours ago

DEADLINE

in 2 months
View Details
NAICS: 334511
New
Federal
13--CASE,AFTERBODY TORP
Solicitation # N0010427RNA34
This contract, issued by Navsup Weapon Systems Support for the Department of the Navy, covers the manufacture of the CASE, AFTERBODY TORP (NSN 1355-01-561-0821). The primary requirement is the production of one unit that must adhere to the design, manufacture, and performance specifications detailed in drawing 6934935 (cage 53711). Key technical mandates include strict compliance with MIL-STD-129 for marking, mandatory serialization coordinated through [email hidden], and a total prohibition of metallic mercury to prevent contamination of submarine and surface ship systems. Configuration control is governed by MIL-STD-973, and the contractor must maintain a quality system compliant with ISO 9001. The procurement is a small business set-aside, with the government intending to make a single award based on a combination of price and past performance, the latter of which is weighted as the more important factor. Evaluation of past performance utilizes the DoD Supplier Performance Risk System (SPRS) to assign color ratings. Logistics are handled as FOB Destination, with inspection and acceptance occurring at the contractor's plant. Packaging and preservation must follow MIL-STD-2073-1 and MIL-STD-129, and all payment requests and receiving reports must be processed electronically via Wide Area Workflow (WAWF). The solicitation requires proposals to be submitted by December 14, 2026.
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

POSTED

about 7 hours ago

DEADLINE

in 26 days
View Details
NAICS: 336412
New
Federal
VALVE,PRESS REDUCIN
Solicitation # N0010426QNE10
Solicitation N00104-26-Q-NE10 is for the procurement of pressure reducing valves (NSN 2915-01-098-2807) for use in crucial shipboard systems. Due to the high risk associated with material failure, these items are designated as Special Emphasis material (Level I), requiring strict quality assurance, comprehensive certification, and adherence to rigorous technical specifications. The current requirement is for four units, with delivery to the Portsmouth Naval Shipyard in Kittery, Maine, on an FOB Destination basis. The contractor must ensure all materials undergo quantitative chemical and mechanical analysis, non-destructive testing, and oxygen cleaning per MIL-STD-1330. Strict inspection standards apply, including a zero-defect lot acceptance policy and mandatory traceability via heat-lot or heat-treat numbers. All final documentation, including the Special Emphasis Certificate of Compliance and certification test reports, must be submitted via Wide Area Workflow (WAWF) for review and acceptance by the Portsmouth Naval Shipyard prior to shipment. Award will be made to a single responsible offeror based on a determination of the most advantageous offer, with past performance weighted as more important than price. Offerors who are not the Original End Manufacturer must provide a signed letter of authorization and the OEM's CAGE code. The contract incorporates various FAR and DFARS clauses, including Buy American requirements, cybersecurity safeguards, and specific security prohibitions.
Aircraft Engine and Engine Parts Manufacturing

POSTED

about 7 hours ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS