Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on April 7, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

43--PUMP UNIT,CENTRIFUG- AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF

Awarded
N0010422QCB41Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811310
New
Kubota M8200 Clutch Replacement
Solicitation # kubota-m8200-clutch-replacement
Management and Training Corporation is soliciting lump sum fee proposals for the clutch replacement of a Kubota M8200 tractor with front wheel assist, located at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The scope of work requires a qualified contractor to provide all transportation, labor, materials, and equipment to diagnose and repair the clutch assembly and power take-off system. Key technical requirements include replacing friction discs, bearings, oil seals, and O-rings, resurfacing the flywheel, and replacing hydraulic pipes and filters as needed. The contractor must perform all work according to manufacturer specifications and provide a final summary of diagnostic findings, an itemized list of replaced parts, and warranty documentation upon completion. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. Bids must be submitted via email to Angie Mahoney by 3:00 PM CST on November 3, 2026, and must include a bid sheet, proof of insurance, a completed supplier packet with a W-9, and applicable SBA certification letters. Award decisions will be based on best value, with a focus on administrative compliance and technical qualifications. The contract is subject to various Federal Acquisition Regulations, including standards for combating trafficking in persons, Buy American restrictions, and Service Contract Labor Standards per Wage Determination 2015-4687 Revision 31 for Kentucky.
Earle C. Clements Job Corps Center

POSTED

about 1 hour ago

DEADLINE

in 5 days
NAICS: 811310
New
SLED
RFP 07-135 Roseville Electric Utility – Air Compressor Maintenance
Solicitation # 07-135
The City of Roseville is soliciting proposals under RFP 07-135 for a consultant to provide comprehensive scheduled preventive and corrective maintenance for air compressors and auxiliary systems, including Ingersoll Rand equipment. The services will be performed at the Roseville Energy Park and Sunset Energy Center in California. The selected consultant will be responsible for providing all necessary labor, technical expertise, specialized tooling, and materials. This is a prevailing wage project with an initial contract duration of five years, estimated to commence in April or May. Proposals must be submitted by December 16, 2026, via email to the City Clerk or through physical delivery in a sealed container with the required Attachment H label. The award will be based on a formal evaluation panel process considering the firm's experience and qualifications (25 points), the proposed project plan (35 points), and cost (40 points), with potential interviews for top candidates. Requirements for the successful bidder include obtaining a City of Roseville business license, providing 100% faithful performance and labor and materials bonds, and maintaining specific insurance policies. Consultants must also disclose any conflicts of interest and adhere to the Levine Act regarding political contributions.
City of Roseville

POSTED

about 7 hours ago

DEADLINE

in about 2 months
NAICS: 811310
New
SLED
Roseville Electric Utility – Gas Compressor Maintenance
Solicitation # 07-137
The City of Roseville is soliciting proposals for Gas Compressor Maintenance Services to support the Roseville Energy Park and the Roseville Energy Center and RPEAK. The selected contractor will provide all labor, supervision, technical expertise, specialized tooling, equipment, and materials necessary for both scheduled preventive and corrective maintenance on natural gas compressors, specifically Gas Packagers and Ariel models, and their associated auxiliary systems. The contract is intended to run for an initial term of five years, with services estimated to commence in April or May. This is a prevailing wage project requiring adherence to all fair employment laws, with certified payroll required for contracts exceeding 25,000 dollars. The successful proposer must provide a 100 percent Faithful Performance Bond and a 100 percent Labor and Materials Bond. Proposals are due by December 17, 2026, and must include a Proposer’s Certification, a Non-collusion Declaration, a Levine Act Disclosure Statement, and proof of active registration with the California Secretary of State. Award will be made to the responsible proposer determined to be the most advantageous to the City through a formal evaluation panel process. Invoicing is to be submitted monthly, delineated by task and personnel, with payment terms set at 30 days following receipt of satisfactory services.
City of Roseville

POSTED

about 7 hours ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

This request for quote is issued by the Navsup Weapon Systems Support Mechanicsburg for the repair of centrifugal pump units. A recent amendment increased the quantity for SLIN 0001AA from four to six units and extended the solicitation closing date. The government requires a firm-fixed-price, not-to-exceed, or estimated price for the repair, specifically noting that quotes limited only to test and evaluation will not be accepted. The award will be issued bilaterally and requires the contractor to be an authorized repair source. Key performance requirements include a Repair Turnaround Time of 143 days after receipt of assets, with price reductions applied for inexcusable delays. Contractors must adhere to MIL-STD packaging, IUID requirements, and specific cyber security provisions. The scope includes strict quality assurance standards and a defined process for handling changes in design or part numbers. All electronic submissions must be directed to the designated point of contact, as faxed offers are not accepted.

General Info

Contract Value

$176,324

NAICS

811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

Place of Performance

PA, USA

Set-Aside

NONE

Award Issued Date

Documents

2

N0010422QCB410001.pdf

PDF

N0010422QCB41.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Type Changed

Solicitation → Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support Mech
Contacts1 person available
OfficeMECHANICSBURG, PA, 17050-0788, USA
Office AddressMECHANICSBURG, PA, 17050-0788, USA
Contacts

Full Description

Show more
CONTACT INFORMATION|4|N771.3|WG3|+1 (555) 000-0000|contact@example.gov| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|N00104|TBD|TBD|SEE SCHEDULE|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS MECHANICSBURG| EQUAL OPPORTUNITY (SEP 2016)|2||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13||X|||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2022)|13|333996|1250|X|X|||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| The reason for this amendment is to increase the qty on SLIN 0001AA from 4EA to 6EA. The solicitation closing date is extended. See continuation page for details. All other terms and provisions are unchanged. A. Since the Government intends to award without discussion, any exceptions to the requirements of this solicitation should be raised prior to submission of an offer. B. Electronic submission of any quotes, representations, and any necessary certifications shall be accomplished via an email directed to contact@example.gov. Faxed offers will NOT be accepted. C. General Requirements: MIL-STD Packaging, Government Source Inspection, FOB Source, CAV Reporting, IUID, Cyber provision & clause (DFARS 252.204-7008 & 252.204-7012). Notice of NIST SP 800-171 DoD Assessment Requirements provision & clause (DFARS 252.204-7019 & 252.204-7020) - does not apply to quote less than or equal to (=/;) $10K, Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment provision & clause (FAR 52.204-24 & 52.204-25). DFARS 252.225-7974 Representation R Regarding Business Operations with the Maduro Regime. (Deviation 2020-O0005). D. This RFQ is for REPAIR. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. E. Only a firm-fixed (FFP), not-to-exceed (NTE), or estimated (EST) price for the REPAIR of the subject item(s) will be accepted. Quotes limited to test and evaluation (T&E) will NOT be accepted. The quoted price MUST be for the REPAIR of the item(s). F. Must adhere to IUID requirements of DFARS 252.211-7003 G. The ultimate awardee of the proposed contract action must be an authorized repair source. Award of the proposed contract action will not be delayed while an unauthorized source seeks to obtain authorization. H. Required RTAT: ## _143_ days after receipt of asset. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. Please note freight is handled by Navy CAV or Proxy CAV as stated in NAVSUPWSSFA24 or NAVSUPWSSFA25. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences: _____/month (contractor is to fill in #). A throughput of "0" (zero) per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. I. IMPORTANT NOTE: Reconciliation: Any asset(s) for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late. However, any delay determined to be excusable (e.g. Government Delay) will not result in a price reduction. If the contractor does not meet the required RTAT due to inexcusable contractor delay, the Contracting Officer will implement the aforementioned price reduction via a "Reconciliation Modification" at the end of the contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. In reference to the above important note, the contractor provides the following price reduction amount per unit/per month the contractor does not meet the RTAT: $___________, up to a maximum of: $__________. (contractor is to fill in amount) J. Your quote should include the following information for justification purposes: - Repair unit price__________ - Total price__________ - Repair Turnaround Time (RTAT) __________ - Price Type: Firm-fixed-Price ___ Not to Exceed (Ceiling Price) ___ Estimated ___ - New unit price__________ - New unit delivery lead time_________ - T&E fee/price (if asset is determined BR/BER): If an item is determined BR, and the contractor provides documentation that costs were incurred during evaluation and determination of BR/BER, the contracting officer will negotiate a reduced contract price, not-to exceed (NTE) $___________associated with the repair effort to reflect the BR status of the equipment. - The T&E fee (if asset is determined BR/BER) was determined based on:_______________________. - Award to CAGE:________ - Inspection & Acceptance CAGE, if not the same as Award to CAGE. - Facility/Subcontractor CAGE (where the asset should be shipped to), if not same as Award to CAGE. - Facility/Subcontractor or Packaging Facility CAGE (where the asset will be shipped from), if not the same as Award to CAGE. - Basis of quote pricing: ; Estimated costs, or ; Historical repair price - Cost breakdown, including profit rate(if feasible). - Quote expiration date (90 Days is requested). - Delivery Vehicle (if Delivery Order requested) (if your company has a current BOA/IDIQ, for example) \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the PUMP UNIT,CENTRIFUG . 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The PUMP UNIT,CENTRIFUG repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;10941 AB294-0561-00; 3.2 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 4. QUALITY ASSURANCE 4.1 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.2 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE 1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the PUMP UNIT,CENTRIFUG . 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The PUMP UNIT,CENTRIFUG repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;10941 AB294-0539-000 10941 294-0539-000-GR1; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV K, 15 JAN 2000; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 4. QUALITY ASSURANCE 4.1 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.2 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

More opportunities from Department Of Defense → Navsup Weapon Systems Support Mech

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS