Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Specialized Heat Exchanger Maintenance (Preventive & Corrective)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

This scope was carved out of 07-134.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFP 07-134 Roseville Electric Utility – Heat Exchange Maintenance

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Roseville
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs scheduled preventive and corrective maintenance on facility heat exchangers for prime contractors on City of Roseville Electric Utility projects. Executes maintenance on Alfa Laval and Tranter plate and frame and CPK shell and tube systems. Uses specialized tooling for disassembly, cleaning, and reassembly. Requires DIR registration and adherence to prevailing wage laws. Delivers fully operational heat exchange systems and maintenance logs.

Similar Contracts

Same NAICS industry code

NAICS: 811310
New
Kubota M8200 Clutch Replacement
Solicitation # kubota-m8200-clutch-replacement
Management and Training Corporation is soliciting lump sum fee proposals for the clutch replacement of a Kubota M8200 tractor with front wheel assist, located at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The scope of work requires a qualified contractor to provide all transportation, labor, materials, and equipment to diagnose and repair the clutch assembly and power take-off system. Key technical requirements include replacing friction discs, bearings, oil seals, and O-rings, resurfacing the flywheel, and replacing hydraulic pipes and filters as needed. The contractor must perform all work according to manufacturer specifications and provide a final summary of diagnostic findings, an itemized list of replaced parts, and warranty documentation upon completion. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. Bids must be submitted via email to Angie Mahoney by 3:00 PM CST on November 3, 2026, and must include a bid sheet, proof of insurance, a completed supplier packet with a W-9, and applicable SBA certification letters. Award decisions will be based on best value, with a focus on administrative compliance and technical qualifications. The contract is subject to various Federal Acquisition Regulations, including standards for combating trafficking in persons, Buy American restrictions, and Service Contract Labor Standards per Wage Determination 2015-4687 Revision 31 for Kentucky.
Earle C. Clements Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in 5 days
View Details
NAICS: 811310
New
SLED
RFP 07-135 Roseville Electric Utility – Air Compressor Maintenance
Solicitation # 07-135
The City of Roseville is soliciting proposals under RFP 07-135 for a consultant to provide comprehensive scheduled preventive and corrective maintenance for air compressors and auxiliary systems, including Ingersoll Rand equipment. The services will be performed at the Roseville Energy Park and Sunset Energy Center in California. The selected consultant will be responsible for providing all necessary labor, technical expertise, specialized tooling, and materials. This is a prevailing wage project with an initial contract duration of five years, estimated to commence in April or May. Proposals must be submitted by December 16, 2026, via email to the City Clerk or through physical delivery in a sealed container with the required Attachment H label. The award will be based on a formal evaluation panel process considering the firm's experience and qualifications (25 points), the proposed project plan (35 points), and cost (40 points), with potential interviews for top candidates. Requirements for the successful bidder include obtaining a City of Roseville business license, providing 100% faithful performance and labor and materials bonds, and maintaining specific insurance policies. Consultants must also disclose any conflicts of interest and adhere to the Levine Act regarding political contributions.
City of Roseville

POSTED

about 6 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 811310
New
SLED
Roseville Electric Utility – Gas Compressor Maintenance
Solicitation # 07-137
The City of Roseville is soliciting proposals for Gas Compressor Maintenance Services to support the Roseville Energy Park and the Roseville Energy Center and RPEAK. The selected contractor will provide all labor, supervision, technical expertise, specialized tooling, equipment, and materials necessary for both scheduled preventive and corrective maintenance on natural gas compressors, specifically Gas Packagers and Ariel models, and their associated auxiliary systems. The contract is intended to run for an initial term of five years, with services estimated to commence in April or May. This is a prevailing wage project requiring adherence to all fair employment laws, with certified payroll required for contracts exceeding 25,000 dollars. The successful proposer must provide a 100 percent Faithful Performance Bond and a 100 percent Labor and Materials Bond. Proposals are due by December 17, 2026, and must include a Proposer’s Certification, a Non-collusion Declaration, a Levine Act Disclosure Statement, and proof of active registration with the California Secretary of State. Award will be made to the responsible proposer determined to be the most advantageous to the City through a formal evaluation panel process. Invoicing is to be submitted monthly, delineated by task and personnel, with payment terms set at 30 days following receipt of satisfactory services.
City of Roseville

POSTED

about 6 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 811310
New
SLED
RFP 07-136 Roseville Electric Utility – Vapor Compressor Maintenance
Solicitation # 07-136
The City of Roseville is soliciting proposals for Vapor Compressor Maintenance services to support its power plant sites, specifically the Roseville Energy Park and the Sunset Energy Center. The selected contractor will provide all labor, supervision, technical expertise, specialized tooling, equipment, and materials necessary to perform both scheduled preventive and corrective maintenance on vapor compressors and associated auxiliary systems, including American Compressor units. The initial contract term is five years, with services estimated to commence in April or May. This is a prevailing wage project requiring adherence to all fair employment laws and registration with the Department of Industrial Relations. Proposals are due by December 17, 2026, and will be evaluated based on the firm's experience and qualifications (25 points), the proposed project plan (35 points), and the proposed cost (40 points). The successful bidder must execute a City-prepared contract and provide a 100% Faithful Performance Bond and a 100% Labor and Materials Bond. Submission requirements include a sealed physical package with a specific label or an electronic PDF submission via email, provided the file size does not exceed 25 megabytes. The contractor must also certify the absence of conflicts of interest and provide proof of a City of Roseville Business License.
City of Roseville

POSTED

about 7 hours ago

DEADLINE

in about 2 months
View Details

More opportunities from California → City of Roseville

Same awarding agency

NAICS: 238210
New
SLED
Roseville Electric Utility - Electrical Maintenance
Solicitation # 07-133
The City of Roseville is soliciting proposals for Electrical Maintenance Services to support its power plant sites, specifically the Roseville Energy Park and the Roseville Sunset Energy Center. The selected contractor will provide qualified personnel, supervision, tools, and technical support to inspect, maintain, test, troubleshoot, repair, and replace electrical equipment. This is a prevailing wage project requiring adherence to California general safety orders and the provision of all necessary personal protective equipment. The initial contract term is five years, with a not-to-exceed amount and provisions for price renegotiation based on market fluctuations or catastrophic circumstances. The award will be based on a formal evaluation process weighing the proposed cost at 40 percent, the project plan and understanding at 35 percent, and the experience and qualifications of the firm and staff at 25 percent. Successful proposers must provide a 100 percent Faithful Performance Bond and a 100 percent Labor and Materials Bond. Key submission requirements include proof of registration with the California Secretary of State, DIR registration, and various certifications including the Levine Act Disclosure and a Non-collusion Declaration. Proposals are due by December 16, 2026, and must be submitted to the City Clerk via email or physical delivery in a sealed container.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

about 6 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 238220
New
SLED
RFP 07-134 Roseville Electric Utility – Heat Exchange Maintenance
Solicitation # 07-134
The City of Roseville is soliciting proposals for heat exchange maintenance services for the Roseville Electric Utility, specifically covering equipment such as Alfa Laval, Tranter, and CPK shell and tube exchangers. The work will be performed at the Roseville Energy Park and Sunset Energy Center, with services estimated to commence in April or May. This is a competitive negotiation process where the award will be granted to the responsible proposer deemed most advantageous based on a formal evaluation of their experience and qualifications, project plan, and proposed cost. The resulting contract will span five years and requires the successful contractor to provide 100% Faithful Performance and Labor and Materials bonds. This is a prevailing wage project, and for contracts exceeding $25,000.00, certified payroll must be submitted with monthly invoices. Proposers must be registered with the California Secretary of State and the Department of Industrial Relations. Submission requirements are strict, requiring a sealed proposal by December 16, 2026, including several mandatory certifications and disclosures such as the Proposer's Certification, Levine Act Disclosure, and Non-collusion Declaration. Proposals may be submitted physically to the City Clerk or electronically via email, provided they adhere to a 25MB file size limit and do not use compressed formats.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 6 hours ago

DEADLINE

in about 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS