This Solicitation opportunity from Florida was posted on October 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Solicitation 2026-RFP-130 is a request for proposals issued by the City of Lakeland to establish a pool of qualified contractors to provide annual inspection, testing, repair, reconditioning, and storage services for industrial rotating equipment at the McIntosh and Larsen Power Plants. The scope of work covers a wide range of critical assets, including low- and medium-voltage AC and DC electric motors, as well as circulating water and condensate pumps. Required services include clean inspection tests, troubleshooting, motor rewinding, machining, welding, dynamic field balancing, laser alignment, and vibration analysis. Contractors are responsible for the preservation and protection of equipment during transport and storage, including periodic lubrication and shaft rotation.
The selection process is points-based, with pricing accounting for 30 percent of the total score, followed by qualifications and technical capabilities at 25 percent each, service approach at 15 percent, and past performance at 5 percent. Proposers must submit their responses via the OpenGov portal by November 6, 2026. Mandatory compliance requirements include a drug-free workplace certification, a human trafficking affidavit, and various indemnification agreements. Additionally, contractors must adhere to strict OSHA safety standards for crane operations, aerial lifts, and powered industrial trucks, and those working at the McIntosh Power Plant must be on the Risk Management Plan Approved Contractor List.
General Info
Lakeland seeks contractors for rotating equipment maintenance at McIntosh and Larsen Power Plants.
HighAI Summary for 2026 RFP130: Annual Rotating Equipment Inspection, Testing, Repair, Reconditioning and Storage Services: A Request for Proposal (RFP No. 2026 RFP130) issued by the City of Lakeland, FL, released on October 9, 2026. The city is seeking qualified vendors to provide annual rotating equipment inspection, testing, repair, reconditioning, and storage services. The document outlines the submission process via the OpenGov portal, with a question deadline of October 23, 2026, and a final response deadline of November 6, 2026. It includes sections on scope of work, selection criteria, insurance, and safety requirements.
PDF
PDF, High priority: read this first42 pages · rfp
HighAI Summary for 2026-RFP-130: Annual Rotating Equipment Inspection, Testing, Repair, Reconditioning and Storage Services: Request for Proposal (RFP #2026-RFP-130) issued by the City of Lakeland on October 9, 2026. The city is soliciting sealed proposals from qualified vendors for annual rotating equipment inspection, testing, repair, reconditioning, and storage services. The deadline for questions is October 23, 2026, and the response deadline is October 30, 2026, at 3:00 pm. The document outlines the scope of work, selection criteria, insurance requirements, and submission instructions via the OpenGov portal.
PDF
PDF, High priority: read this first42 pages · rfp
HighAI Summary for 2026 RFP130: Annual Rotating Equipment Services - City of Lakeland: Request for Proposal (RFP 2026 RFP130) issued by the City of Lakeland on October 9, 2026, for annual rotating equipment inspection, testing, repair, reconditioning, and storage services. The document outlines the scope of work, submission requirements via the OpenGov portal, and a response deadline of October 30, 2026, at 3:00 pm.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for AC Motors Table Updated: Technical specification table detailing AC motor requirements, including horsepower (HP), voltage, and RPM ratings.
PDF
PDF, High priority: read this first42 pages · rfp
HighAI Summary for City of Lakeland RFP 2026 RFP130 - Rotating Equipment Services: Request for Proposal (RFP 2026 RFP130) issued by the City of Lakeland on October 9, 2026, seeking qualified vendors for annual rotating equipment inspection, testing, repair, reconditioning, and storage services. The document outlines the scope of work, submission requirements via the OpenGov portal, and a response deadline of October 30, 2026.
XLSX
XLSX, High priority: read this first3 pages · specifications
HighAI Summary for HP RPM Motor List: A technical specification list of AC motors detailing horsepower (HP), voltage, and RPM, including columns for rewind and recondition services.
DOC
DOC, High priority: read this first2 pages · contract-document
HighAI Summary for Indemnification Agreement 2026 Contractor: This document is an Indemnification Agreement for contractors working with the City of Lakeland, dated 2026. It outlines the contractor's obligation to defend, indemnify, and hold harmless the City and its representatives from liabilities arising from negligence or misconduct during contract performance. The agreement includes provisions for waiver of subrogation, release of liability upon final payment, and compliance with Florida laws. It specifies applicability by timeframe or project and requires signatures and notarization to validate the agreement.
DOCX
DOCX, High priority: read this first2 pages · specifications
HighAI Summary for Representative Rotating Equipment Inventory - McIntosh and Larsen Power Plants: This document provides a representative inventory of rotating equipment, including major circulating water and condensate pumps and a range of AC/DC electric motors, for the McIntosh and Larsen Power Plants. It serves as a technical guide for bidders to understand the scope of equipment that may be serviced under the Agreement.
PDF
PDF, Low priority1 page · contractor-audit-form
LowAI Summary for City of Lakeland Contractor Audit Form: This document is the City of Lakeland's Risk Management and Purchasing Contractor Audit Form. It is used to audit contractors on various safety and compliance items such as EMR, drug and alcohol policy, written safety plan, safety compliance program, safety records, employee training records, and onsite safety performance. The form includes fields for audit results, comments, and approval status for continued inclusion on the approved contractors list. It also requires auditor information and signature.
DOCX
DOCX, Low priority1 page · affidavit
LowAI Summary for Human Trafficking Affidavit for City of Lakeland Contract Compliance: This Human Trafficking Affidavit, compliant with Section 787.06(14) of Florida Statutes, must be completed by an officer or representative of a nongovernmental entity contracting with the City of Lakeland, Florida. The affidavit attests that the entity does not use coercion for labor or services and commits to notify the governmental entity if such practices occur in the future. It includes sections for company information, authorized signature, and notarization details. The document serves as a legal attestation under penalty of perjury to ensure ethical labor practices in contracts with the City.
DOCX
DOCX, Low priority2 pages · contract-document
LowAI Summary for Indemnification Agreement 2026 Contractor FDOT: This document is an Indemnification Agreement for contractors working with the State of Florida Department of Transportation and the City of Lakeland. It outlines the contractor's obligation to defend, indemnify, and hold harmless the State, City, and their agents from liabilities arising from negligence or misconduct during contract performance. The agreement includes provisions for waiver of subrogation, release of liability upon final payment, and compliance with Florida laws, specifically Sections 725.06 and 725.08 of the Florida Statutes. It allows the contractor to specify the applicable timeframe or project for the indemnification and requires notarized acknowledgment.
DOC
DOC, Low priority2 pages · contract-document
LowAI Summary for Indemnification Agreement 2026 Vendor: This document is an Indemnification Agreement for the year 2026 between a Vendor and the City of Lakeland. It outlines the Vendor's obligation to defend, indemnify, and hold harmless the City and its representatives against liabilities arising from the Vendor's acts related to the product or service provided. The agreement includes provisions on subrogation waiver, release of liability upon final payment, and compliance with Florida laws, specifically Sections 725.06 and 725.08 of the Florida Statutes. It allows the Vendor to specify the applicable timeframe or project(s) for the indemnification. The document requires signatures from the Vendor's authorized officer and a notary acknowledgment.
DOC
DOC, Low priority2 pages · contract-document
LowAI Summary for Indemnification Agreement for Consultant Services 2026: This document is an Indemnification Agreement for Consultant services related to contracts, purchase orders, or task authorizations with the City of Lakeland for the year 2026. It outlines the consultant's obligation to indemnify and hold harmless the City and its employees from liabilities caused by the consultant's negligence or wrongful conduct. The agreement includes provisions on subrogation waivers, release of liability upon final payment, and compliance with Florida statutes. It allows the consultant to specify the applicable timeframe or project scope for the indemnification. The document requires signatures from the consultant's authorized representative and notarization.
DOCX
DOCX, Low priority2 pages · contract-document
LowAI Summary for Indemnification Agreement for Consultant Services 2026 - City of Lakeland: This document is an indemnification agreement for consultants working with the City of Lakeland and the Florida Department of Transportation. It outlines the consultant's obligation to indemnify and hold harmless the City and its employees from liabilities arising from the consultant's negligence or wrongful acts. The agreement includes provisions on subrogation, release of liability, and compliance with Florida statutes. It specifies the timeframe or projects to which the indemnification applies and requires signatures and notarization. The document is dated for the year 2026 and is intended to govern indemnification related to contracts, purchase orders, or task authorizations with the City.
Lakeland Electric operates a variety of critical rotating equipment in support of electric power generation at the McIntosh and Larsen Power Plants. This equipment ranges from smaller auxiliary pumps and motors to large medium-voltage motors, circulating water pumps, condensate pumps, and other critical rotating equipment. The purpose of this solicitation is to establish a reliable pool of qualified Contractor(s) with the facilities, personnel, equipment, technical expertise, and specialized capabilities necessary to support the inspection, testing, repair, reconditioning, and storage of this equipment. Routine preventive maintenance of installed equipment is generally performed by City personnel; this agreement is intended to provide specialized shop and field services, diagnostic testing, repair capabilities, emergency support, and supplemental services when requested by the City. Addendum #1: PLEASE REVIEW ATTACHMENT I, AS WAS DISCUSSED IN PRE-BID MEETING 10/16/2026 Official Notice #1: PLEASE REVIEW ATTACHMENT I, AS WAS DISCUSSED IN PRE-BID MEETING 10/16/2026 : PLEASE REVIEW ATTACHMENT I, AS WAS DISCUSSED IN PRE-BID MEETING 10/16/2026 Official Notice #2: PLEASE REVIEW ATTACHMENT J AC MOTOR BUILD LIST : PLEASE REVIEW ATTACHMENT J AC MOTOR BUILD LIST Addendum #2: PLEASE REVIEW ATTACHMENT J AC MOTOR BUILD LIST Addendum #3: Please use the See What Changed link to view all the changes made by this addendum.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.