4300 Stevens Creek Boulevard Mixed-Use Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Stevens Creek Promenade Project, specifically the Chick-fil-A component, involves a Planned Development Permit for the construction of an approximately 5,245-square-foot restaurant at 4300-4360 Stevens Creek Boulevard in San Jose, California. The project scope includes the development of an outdoor dining area, a trash enclosure, and a surface parking lot on an approximately 0.76-acre site. Key site preparation activities involve the demolition of an existing 10,400-square-foot commercial building and the removal of 12 trees, with 22 replacement trees planned. This specific restaurant development is part of a larger, more extensive mixed-use project on a 10-acre site that includes residential buildings, a hotel, an office building, and a parking garage. Environmental compliance is a central component of the project, with recent updates to air quality, noise, and vibration assessments confirming that the restaurant addition will not result in significant new environmental impacts. The project must adhere to the City of San Jose's 2030 Greenhouse Gas Reduction Strategy, CALGreen, and Title 24 standards, utilizing high-performance mechanical and electrical systems to ensure energy efficiency. Construction is scheduled to take place between April 3, 2026, and September 24, 2026, with specific phases including demolition, site preparation, grading, and building construction. To mitigate local impacts, construction hours are restricted to 7:00 a.m. to 5:00 p.m. on weekdays, and noise suppression techniques must be employed to maintain compliance with municipal codes.

General Info

Chick-fil-A restaurant construction at Stevens Creek Promenade, San Jose, from April to September 2026.

Agency

California → City of San Jose

Place of Performance

San Jose, CA, 95129

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Jose
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of San Jose
Office AddressN/A
Contacts
Perry HaririManaging Partner

Full Description

Show more
The project consists of a Planned Development Permit to allow the construction of an approximately 5,245-square-foot restaurant (proposed Chick-fil-A), with an outdoor dining area, trash enclosure, and surface parking lot, the removal of 12 trees (eight ordinance-size, four non-ordinance-size, and 22 replacement trees) and the demolition of an approximately 10,400-square-foot commercial building on an approximately 0.76-gross-acre site.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
South Operation Center (SOC) Digester Demolition
Solicitation # 26-114
Solicitation 26-114 is an Invitation For Bid issued by the City of Naperville for the South Operation Center (SOC) Digester Demolition. The project involves the demolition and removal of an abandoned digester located at 1800 S. Washington Street, including the filling of the excavation, site restoration, ancillary landscaping, and the installation of security fencing. The scope also requires the identification, handling, and legal off-site disposal of special waste, such as contaminated soil and construction debris, with specific requirements for the packaging and transportation of asbestos-containing materials. The contract will be awarded to the lowest responsible bidder based on criteria including technical capacity, integrity, past performance, and financial resources. The work must be completed by December 31, 2027, with construction operations limited to Monday through Friday from 7:00 a.m. to 4:00 p.m. A contingency allowance of $25,000 is provided for unforeseen work, while failure to achieve final completion is subject to liquidated damages of $250 per calendar day. The contractor is required to provide performance and payment bonds equal to the contract price and must comply with the State of Illinois Prevailing Wage Act and 2010 ADA Standards. Bids must be submitted electronically by December 11, 2026, and include a bid deposit equal to 10% of the total bid. All work must adhere to standards set by IDOT, the City of Naperville, ISPE, FHWA, AASHTO, ANSI, NEMA, and CFR 29 Part 1910.
Public Utilities (Water) | DPU-W

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS