Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

4645 East Nob Hill Drive (ENV-2025-6601-CE)

Forecast
ENV-2026-6601-CEState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project at 4645 East Nob Hill Drive in Los Angeles involves the conversion of an existing crawl space into approximately 746 square feet of habitable living space and the addition of an 85 square foot covered balcony. This development will result in a total cumulative floor area of 2,962 square feet on a 6,265.4 square foot lot located within the Mount Washington-Glassell Park Specific Plan area. The project is classified as a Class 3 Categorical Exemption under CEQA Guidelines Section 15303 for single-family dwelling construction, with the City of Los Angeles Department of City Planning serving as the procuring agency. Key requirements include strict adherence to the California Building Code, the City of Los Angeles Landform Grading Manual, and specific municipal codes regarding tree protection and grading. Environmental compliance is supported by an arborist report dated June 19, 2025, and a geology and soils report approved on July 23, 2025. The project mandates the preservation of three protected trees and prohibits the removal of any street trees without prior Urban Forestry approval. Regulatory compliance measures are also required for noise control, stormwater management, pollutant discharge prevention, and fire hazard mitigation within the Very High Fire Hazard Severity Zone. The applicant is Lindsay Gibbs, with project coordination managed by Ricardo Fonseca and City Planning Associate Pablo Estrada.

General Info

Convert crawl space to 746 sq ft living area, add 85 sq ft balcony, no tree removal, comply with LA codes and environmental exemptions.

Agency

California → City of Los Angeles

Place of Performance

Los Angeles, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Los Angeles
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Los Angeles
Office AddressN/A
Contacts
Pablo EstradaCity Planning Associate
Ricardo FonsecaRepresentative

Full Description

Show more
The construction, use, and maintenance of a conversion of existing crawl space into habitable space measuring approximately 746 square feet and the addition of a covered balcony on the lower floor plan of 85 square feet. The cumulative floor area on the site will total 2,962 square feet on a 6,265.4-square-foot developed lot that is within the Mount Washington-Glassell Park Specific Plan area. There are three (3) Protected Trees, zero (0) Significant Trees, and zero (0) Trees in the Public Right of Way and zero (0) Trees are proposed for removal. The Arborist Report was prepared by Killian Vendler, Certified Arborist License #WE-14059A dated June 19, 2025 and was reviewed and stamped by Urban Forestry Division staff on July 17, 2025. This environmental analysis does not authorize the removal of any street trees without the prior approval of Urban Forestry, in compliance with LAMC Section 62.9169 and 62.170 and their applicable findings.

Similar Contracts

Same NAICS industry code

NAICS: 236118
New
SLED
6141, 6143, and 6145 Terrell Drive - Fire Rehab
Solicitation # SHARP IFB-2026-089-PS
Solicitation SHARP IFB-2026-089-PS is a private, non-governmental request for lump-sum fixed price bids for the complete fire damage rehabilitation of a single-story residential triplex located at 6141, 6143, and 6145 Terrell Drive in Citrus Heights, California. The scope of work includes selective demolition, structural repairs, complete building systems replacement, interior and exterior finishes, site work, and code-compliance upgrades, including the installation of a new residential fire sprinkler system. The project strictly maintains the existing building footprint. The performance period is 270 calendar days from the effective date or the issuance of a Notice to Proceed. The contract will be awarded to the lowest responsive bidder based on experience, capacity, and bondability. Bidders must be licensed Class B General Contractors and must ensure that electrical, fire protection, HVAC, and plumbing work is performed by contractors holding the respective C-10, C-16, C-20, and C-36 specialty licenses. Required financial securities include a bid bond of 5 percent for bids exceeding 300,000 dollars, and performance and payment bonds for 100 percent of the contract price upon award. Liquidated damages for delays are set at 100 dollars per unit per calendar day. This project is not subject to prevailing wages. The final bid submission deadline is November 17, 2026.
Real Estate and Construction Services (RECS)

POSTED

about 23 hours ago

DEADLINE

in 10 days
View Details
NAICS: 236118
New
International
BAF26028 – DLO SUPPORT FRAMEWORK
Solicitation # BAF26028
Bron Afon Community Housing, through Barcud Shared Services, is establishing an open framework scheme (BAF26028) to provide additional contractor capacity and specialist support to its Direct Labour Organisation (DLO). This framework is designed to supplement rather than replace the in-house DLO function and is divided into nine lots: General Repairs; Gas, Heating & Plumbing Repairs (including Out of Hours); Heating Installations; Roofing Repairs; Highway Works; Doors & Windows (Glazing); Drainage & Groundworks; External Garden Works; and Whole House Refurbishment. The estimated total value of the framework is 34,213,333.36 GBP excluding VAT, with a maximum operational period of 8 years. The contract will be awarded to the Most Advantageous Tender based on a weighted evaluation of 70% price and 30% quality, following a mandatory pass/fail foundation screening. Pricing is based on a Schedule of Rates with a fixed period until August 31, 2028, after which annual CPI adjustments will apply. Contractors must meet stringent requirements, including specific insurance coverages—such as 10 million GBP for Employer's Liability and 5 million GBP for Public and Product Liability—and maintain valid Cyber Essentials certification. Performance is measured against Bron Afon's Lettable Standard, requiring a rigorous inspection, snagging, and sign-off process, alongside a minimum 12-month workmanship guarantee. Submissions are due by December 7, 2026, via the Sell2Wales portal.
Barcud Shared Services

POSTED

1 day ago

DEADLINE

in 30 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS