6141, 6143, and 6145 Terrell Drive - Fire Rehab
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The project involves the complete fire damage rehabilitation of a single-story residential triplex located at 6141, 6143, and 6145 Terrell Drive in Citrus Heights, California. The scope of work includes selective demolition, structural repairs, complete building systems replacement, interior and exterior finishes, site work, and code-compliance upgrades. Key technical requirements include the removal of asbestos-containing construction material (ACCM) from existing stucco, the installation of a comp shingle roof with R-11 insulation, and an electrical upgrade to a 400A service. The project strictly maintains the existing building footprint with no new area added. This is a private, non-governmental solicitation issued by Sharp Investment LLC as a lump-sum fixed price contract. The project is not subject to prevailing wages. A licensed Class B General Contractor is required, and specific trade scopes must be performed by contractors holding C-10 (Electrical), C-16 (Fire Protection), C-20 (HVAC), C-36 (Plumbing), C-22 (Asbestos), and C-39 (Roofing) licenses. The performance period is 270 calendar days, with liquidated damages set at $100 per unit for each day of delay. Bidders must provide a bid bond of 5% for bids exceeding $300,000 and the successful awardee must furnish 100% Performance and Payment Bonds within ten calendar days of award. There is no set-aside status for this solicitation.
General Info
Place of Performance
Set-Aside
Documents
20Read all 20 documents
Due in 4 daysEvery page of every file, in your free workspace.
Read the documentsAI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownPotential competitors
1 company- JRG PRECISION CONSTRUCTION, LLC 100%
Review awarded contracts behind each match to see who has relevant experience.
Explore potential competitorsSolicitation requirements
872 mandatory926 requirements in 11 areas
- Technical660 · 635 must188
Vegetation Clearance
- Submission122 · 114 must001
Bid Bond Submission
6141_ 6143_ and 6145 Terrell Drive - Fire Rehab.pdf - Compliance54 · 44 must134
Right of Way Permits
- 923 more requirements, each with its source quote
Read every requirement with its source and proposal context.
Read all 926 requirementsEverything you need to bid on this one
Open the full contract in your free workspace.
- 20 solicitation documentsRead every page
- AI contract breakdown13 sections, Uniform Contract Format
- Buyer contactEmail and phone
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
The notice title changed.
The notice description changed.
Response deadline changed from Nov 10, 2026 to Nov 17, 2026. The notice description changed.
The notice description changed.
The notice description changed.
Response deadline changed from Nov 17, 2026 to Dec 1, 2026. The notice description changed.
Submission deadline
Organization & Contact Information
Interested Companies (59)
See All 59 Interested Companies
Get full access to view all interested companies, their contact details, and full contractor profiles.
Full Description
Addendum #1: This Addendum No. 1 clarifies mandatory California Contractors State License Board (CSLB) specialty licensing requirements for the subject solicitation. Bidders must acknowledge receipt of this addendum on the Bid Form or via OpenGov. MANDATORY SPECIALTY LICENSE REQUIREMENTS Pursuant to CSLB guidelines, the following trade scopes must be executed by contractors holding the specific specialty license listed: C-10 – Electrical C-16 – Fire Protection C-20 – HVAC (Warm-Air Heating, Ventilating & AC) C-36 – Plumbing Class B General Contractors performing as prime contractors must hold these specific C-licenses or subcontract the work to properly licensed C-specialty subcontractors. ALL OTHER TERMS, CONDITIONS, AND DEADLINES REMAIN UNCHANGED.
Official Notice #1: First Pre-Bid Sign in Sheet : Attachments: terrell_pre_bid_#1_sign_in_sheet.pdf
Addendum #2: Project name updated to reflect corrected address location.
Official Notice #2: Second Pre-Bid Sign in sheet: Attachments: Pre_Bid_#2_sign-in_sheet.pdf
Addendum #3: Notice is hereby given to all prospective bidders that the solicitation documents for the subject project are modified as follows: Addendum Inquiry / Question Due Date: Extended to Friday, November 6, 2026 Bid Submission Due Date: Extended to Tuesday, November 17, 2026 All other terms, conditions, specifications, and scope of work remain unchanged. Bidders must acknowledge receipt of this addendum as part of their submittal package.
Addendum #4: Notice is hereby given to all prospective bidders that the solicitation documents for the subject project are modified as follows: Agency Addendum / Inquiry Response Deadline: Extended to Monday, November 9, 2026. All other terms, conditions, specifications, and scope of work remain unchanged. Bidders must acknowledge receipt of this addendum as part of their submittal package. Please use the See What Changed link to view all the changes made by this addendum.
Addendum #5: This Addendum issues official Questions and Answers regarding Solicitation SHARP IFB-2026-089-PS. Exhibits A through G are attached hereto as supporting documentation for the responses. Both the Questions and Answers and Exhibits A through G are also available for download on the solicitation Attachments page. All other terms, conditions, and specifications remain unchanged. Please use the See What Changed link to view all the changes made by this addendum. Attachments: Q_&_A's_with_Exhibits_A_through_H.pdf
Addendum #6: CORRECTION – REPLACEMENT OF ADDENDUM #5 This corrected Addendum replaces Addendum #5 in its entirety. Please disregard the previously issued Addendum #5 and refer to this corrected version. This Addendum issues official Questions and Answers regarding Solicitation SHARP IFB-2026-089-PS. Exhibits A through G are attached hereto as supporting documentation for the responses. Both the Questions and Answers and Exhibits A through G are also available for download on the solicitation Attachments page. All other terms, conditions, and specifications remain unchanged. Attachments: Q_&_A's_with_Exhibits_A_through_H_-_CORRECTED.pdf
Addendum #7: Notice is hereby given to all prospective bidders that the solicitation documents for the subject project are modified as follows: 1. Contract Term & Procurement Schedule Revisions Contract Term: Extended by an additional 30 working days . Agency Addendum / Inquiry Response Deadline: Extended to Tuesday, November 17, 2026 . Bid Submission Due Date: Extended to Tuesday, December 1, 2026 . 2. Licensing & Specialty Contractor Requirements Stucco Removal (ACCM): Existing stucco siding is classified as Asbestos-Containing Construction Material (ACCM) and must be completely removed. The general contractor must either possess a C-22 specialty license or subcontract the removal and disposal work to a licensed C-22 contractor. Roofing Work: All roofing scopes must be performed by a contractor holding a C-39 Roofing license . General contractors who do not possess this license are strictly prohibited from self-performing roofing work. Fire Protection: The required C-16 Fire Protection license covers, but is not limited to, the installation and testing of the project's fire sprinkler system. 3. Architectural & Material Specifications (Detail 1/A502) Skylight Shaft Sheathing: Sheathing on the vertical walls of the skylight shaft must be cementitious soffit board matching the entire ceiling of the covered front courtyard area. Specified Material: James Hardie HZ10 Primed Cedarmill Fiber Cement Soffit Panel. Ventilation & Details: Use vented Hardie soffit panels at the perimeter of the courtyard (finish to match the remainder of the courtyard ceiling). Additionally, at least one eyebrow roof vent must be positioned over the covered front courtyard area. 4. Window & Sliding Glass Door Schedule Revisions Reference Note: The complete window layout is provided as Exhibit I in the project attachments. Schedule Revisions: The following revisions apply to the window schedule, inclusive of sliding glass doors organized by room number: Room Number Specified Windows & Doors Room 101 One (1) 5'-0"W x 4'-0"H window (front-facing); One (1) 6068 sliding glass door (courtyard-facing) Room 103 One (1) 5'-0"W x 4'-0"H window (front-facing); One (1) 3'-0" x 2'-0" window (south-facing) Room 105 One (1) 2'-0"W x 3'-0"H window Room 110 One (1) 5'-0"W x 4'-0"H window Room 111 One (1) 3'-0"W x 3'-0"H window Room 122 One (1) 6'-0"W x 4'-0"H window Room 124 One (1) 6068 sliding glass door Room 128 One (1) 5'-0"W x 4'-0"H window Room 130 One (1) 5'-0"W x 4'-0"H window Room 142 One (1) 6'-0"W x 4'-0"H window Room 144 One (1) 6068 sliding glass door Room 148 One (1) 5'-0"W x 4'-0"H window Room 150 One (1) 5'-0"W x 4'-0"H window Room 152 One (1) 6'-0"W x 4'-0"H window; Three (3) 1'-2" x 1'-2" windows Please use the See What Changed link to view all the changes made by this addendum. Attachments: Exhibit_I_-_6141-43-45_Terrell_Drive_-_Updated_window_sizes_-_6-16-26.pdf
Addendum #8: Please use the See What Changed link to view all the changes made by this addendum.
Similar Contracts
Same NAICS industry code
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
