Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Award Notice opportunity from Department Of Veterans Affairs was posted on March 28, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z2DA--Repair 23H Fire Damage

Awarded
Federal
Submission Closed
Solicitation #
36C24525B0003

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
DB Major M&R Sector Lake MIchigan, INTERNAL
Solicitation # 70ZS0127RCLEV00018
Solicitation 70ZS0127RCLEV00018 is a firm fixed-price task order for a Design-Build Major Maintenance and Repair (M&R) project at the U.S. Coast Guard Sector Lake Michigan in Milwaukee, Wisconsin. The project is estimated between $5 million and $10 million, with a projected period of performance of 350 calendar days. The scope of work includes base requirements for remodeling the Sector Command Center, building envelope repairs, and HVAC reconfiguration, with optional work items for roof and boiler replacement at the Station/UPH Building. Technical requirements encompass architectural remodels, electrical power and lighting updates, mechanical demolition and installation, and strict adherence to fire protection and physical security standards. Proposals are due by December 17, 2026, and must be submitted via email to the Contract Specialist. Award will be granted to the lowest total priced responsive offeror. The contractor must comply with the Buy American Act, Trade Agreement Act, and Wage Determination WI20260001. Key requirements include providing performance and payment bonds within 10 business days of award and ensuring personnel handling classified information hold valid security clearances. All work must adhere to the U.S. Army Corps of Engineers Safety and Health Requirements Manual and International Building and Mechanical Codes. There is no set-aside status specified for this solicitation.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center (FLETC) in Glynco, Georgia, is a comprehensive interior modernization effort. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully renovating restrooms with new plumbing fixtures and partitions, and updating doors and life-safety components. Technical upgrades involve installing new raised flooring and electrical distribution to support classroom training, replacing variable air volume (VAV) systems using Automated Logic Corporation components, upgrading lighting controls, and correcting plumbing deficiencies. The project also requires repainting interior surfaces and installing fire-rated smoke doors. This solicitation is a Total Small Business Set-Aside. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the notice to proceed. Proposals are evaluated based on three factors of equal importance: Past Performance, Corporate Relevant Experience, and Price. The contract is a firm-fixed-price arrangement and is subject to the Davis-Bacon Act and ADA accessibility guidelines. Key deliverables include as-built markup drawings and operation and maintenance manuals. The proposal deadline is December 2, 2026, and electronic submission is required.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 5 days
NAICS: 236220
New
SLED
DB Repair Fire Sprinkler Deficiencies, B290, PSNS
Solicitation # N4425527RB007
This Design-Build contract, designated as an 8(a) Multiple Award Construction Contract, involves repairing fire sprinkler deficiencies at Building 290 and the adjoining covered loading dock platform, Building 719, at the Puget Sound Naval Shipyard in Bremerton, Washington. The contractor is responsible for producing final design documentation per FC 1-300-09N Navy and Marine Corps Design Procedures and providing all necessary materials and labor for a complete system. Key technical requirements include addressing a Risk Assessment Code Level 4 (RAC-4) deficiency by extending sprinklers to the loading dock platform, securing and monitoring sprinkler control valves in basement elevator pits, and installing missing backflow preventers on the north and south 6-inch diameter wet pipe sprinkler system risers. The project is a Firm Fixed-Price contract with an estimated value between $1 million and $5 million and a period of performance of 440 days from the award of the task order. Award decisions will be based on price and MACC past performance. The contractor must adhere to strict safety and security standards, including CMMC Level 1 certification and compliance with governmental safety requirements. Deliverables include shop drawings, O&M manuals, and record drawings. Proposals are submitted via the PIEE portal, with the final deadline extended to December 16, 2026.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 5 days
NAICS: 236220
New
Federal
Roof Replacement Mandatory Site Visit: 12/03/2026 @ 11 AM
Solicitation # 26-144
Solicitation 26-144 is for a full roof replacement of the 1963 LBJ building at the Atterbury Job Corps Center in Indiana, operated by Adams & Associates for the U.S. Department of Labor. The project is necessitated by persistent leaks and storm damage. This is a single lump sum contract with a mandatory site visit scheduled for December 3, 2026, at 11:00 AM, and a proposal deadline of December 14, 2026. The contract is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Award will be based on best value using a 100-point system weighted by price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). The selected contractor must provide a sequenced construction schedule within 10 days of the Notice to Proceed and start work within 14 days. Deliverables include a one-year workmanship guarantee and a two-year manufacturer's product warranty. All work must comply with EPA, OSHA, and Indiana state and local building codes. Required submission documents include a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, and certification of compliance with Davis-Bacon Act wage rates. Payment terms are Net 30.
Atterbury Job Corps – Adams & Associates

POSTED

about 4 hours ago

DEADLINE

in 16 days
NAICS: 236220
New
Federal
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
This project involves the construction of the P084 Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The scope includes a 12,920 SF laboratory and office facility and an optional 17,978 SF laboratory facility. Both structures will feature steel framing, shallow foundations, standing-seam roofs, and a combination of masonry and metal panel exteriors. The project also encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, and an underground stormwater retention system, as well as the demolition of Building 1272T. The solicitation is open to Small Business (SB), Small Disadvantaged Business (SDB), Women-Owned Small Business (WOSB), HUBZone Small Business (HUBZone SB), Veteran Owned Small Business (VOSB), and Service-Disabled Veteran-Owned Small Business (SDVOSB) entities. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested for various trades, including demolition, concrete, structural steel, mechanical, electrical, and plumbing. Interested parties should contact Rahul Maheshwari to receive bid documents via Building Connected.
J&J CONTRACTORS, INC.

POSTED

about 4 hours ago

DEADLINE

in 2 days
NAICS: 236220
New
Federal
Site Visit (required) Replacement of existing damaged fire rated doors and frames-
Solicitation # 26-141
Solicitation 26-141 is for the removal and replacement of two damaged fire-rated doors and frames at the Atterbury Job Corps Center cafeteria in Indiana. The project requires the installation of new fire-rated doors while reusing existing push bars and closure systems. All work must comply with local, state, and federal building codes, as well as EPA and OSHA regulations. The contractor must provide a sequenced construction schedule, a timeline for substantial completion, and a one-year guarantee of workmanship. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Proposals must be submitted as a single lump sum contract with a detailed cost breakdown for labor, materials, and equipment. Award will be based on best value, with evaluation factors including price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). A mandatory bid conference is scheduled for December 1, 2026, with a response deadline of December 11, 2026. Requirements for submission include a valid Indiana Contractor's License, a 90-day bid guarantee, and certification of compliance with Davis-Bacon Act wage rates. The Atterbury Job Corps Center is tax-exempt, and payment terms are Net 30.
Atterbury Job Corps – Adams & Associates

POSTED

about 4 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

This contract involves comprehensive repair and restoration work following a fire incident at Building 23H at the Perry Point VA Medical Center. The scope includes replacing damaged ceiling tiles, flooring, drywall, and wall base, covering approximately 1,610 square feet of gypsum wall, 1,640 square feet of acoustical ceiling tiles, and various flooring materials, along with painting and wall patching. The contractor is responsible for coordinating the removal and reinstallation of existing fixtures, installing a new HVAC diffuser, and rebuilding a fire-rated shaft wall system around the generator exhaust pipe. Additionally, the project requires asbestos abatement, specifically removing residual black mastic from tile flooring, with strict adherence to hazardous waste disposal regulations and air monitoring protocols. Fire safety measures include sealing penetrations with fire-rated materials and infill of pipe penetrations, all performed under appropriate permits and safety standards. The work must be executed within a 90-day period, with strict compliance to OSHA and VA safety regulations, infection control protocols, and environmental controls, including dust and fume management. The contractor must provide qualified supervision, ensure security and safety of the work environment, and coordinate closely with VA personnel. All work must meet or exceed existing standards, with a focus on quality, safety, and environmental responsibility. The contract emphasizes timely completion, proper documentation of hazardous waste disposal, and a one-year warranty on all new work. The project is managed by the VA's Network Contract Office 5 in Linthicum, Maryland, with a response deadline set for February 25, 2025.

General Info

Contract for fire damage repairs in Linthicum, MD, due by March 5, 2025.

Contract Value

$102,686.27

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

MD, USA

Set-Aside

SDVOSBC

Award Issued Date

Potential End Date

August 31, 2025

Documents

1
DOCX, Low priority3 pages · award
Low

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • DB Major M&R Sector Lake MIchigan, INTERNALOpen now, due in 20 days
  • Building 262 Renovations FLETC GlyncoOpen now, due in 5 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

4 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline time changed from 12:00 PM UTC to 5:00 PM UTC on Jan 28, 2025. The notice description changed.

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Feb 25, 2025 to Mar 5, 2025. The notice description changed.

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 245-NETWORK Contract Office 5 (36C245)
Contacts1 person available
OfficeLINTHICUM, MD, 21090, USA

Full Description

Show more
SCOPE OF WORK PROJECT DATA: VA Project Title: Building 23H Fire Damage Repairs VA Project No: 512A5-25-003 VA Facility: Perry Point VA Medical Center Perry, Point, MD Period of Performance: 90 calendar days from contract Notice to Proceed Project Background: On the evening of October 23, 2024, a fire occurred located on the roof of Building 23H. The fire was extinguished with no major damages to 23H. There was minor damages and wetted areas from the use of fire hoses. A remediation contractor was engaged to remove all wetted ceiling tiles, wetted carpet, wetted drywall, wetted wall base, and wetted insulation from the project site. A separate contract is now being contemplated to complete the repair/restoration work required to return the damaged building areas to active service use. Work Scope: Work Item 1: The contractor shall provide all supervision, labor, materials, and equipment to replace the acoustical ceiling tiles, flooring, gypsum board walls, and wall base that were previously removed as part of the fire damage cleanup. Attachment 1 contains a detailed breakdown of the projected repair area included in each room for ceiling tiles, flooring, drywall, paint, and wall base. Approximate total areas for repairs under project to be included in bid: 1610 SF of new gypsum board wall installed on existing metal studs/hat channel. 1640 SF of acoustical ceiling tile (including minor repairs to existing suspension grid) 578 LF of rubber wall base 1184 SF of carpet tile and mastic 250 SF of luxury vinyl plank flooring and mastic 6685 SF of wall patching/skim coat and painting. 4th Floor office suite to be fully repainted after wall repairs. Coordinate color selections with COR. Contractor shall include the removal and reinstallation of existing wall paintings, door tags, TV mounts, bulletin boards, and other signage/artwork as required to repair and repaint walls. VA to provide temporary storage location. Contractor to provide and install a new grid-supported HVAC supply diffuser (2x2) with manual damper and flexible ductwork in room 409 to replace one removed during demolition phase. Coordinate with existing duct size. Contractor shall remove and replace all electrical receptacle and switch cover plates within the work area that were damaged during the water damage remediation phase. Replacement cover plates shall be type 302 stainless steel matching the type and color removed. Oversize plates are not acceptable. Contractor shall remove and rebuild the existing 2HR rated UL shaft-wall system (UL U415 System B) around the existing generator exhaust pipe (including 1 Type X gypsum liner panel, 2½ CH metal studs, and 2 layers of 5/8 Type X gypsum board). Contractor shall include all accessories required for the complete installation of all finish systems, including but not limited to stainless-steel flooring transition strips, light-gage or wood furring/blocking, and ACT suspension grid accessories/pieces for repairs. All joints between gypsum board and other materials shall be fully caulked prior to painting. Work areas are currently isolated from the rest of the hospital with temporary partitions (hard wall or plastic sheeting). Contractor shall provide for any supplemental infection control barriers and ICRA preventative measures required by the work. Level 3 Infection Control Risk Assessment (ICRA) Controls (including negative pressure exhaust) will be required during all drywall and flooring work to control dust and fumes. Work Item 2: The contractor shall engage the services of a Maryland State licensed abatement contractor to remove approximately 1300 SF of residual black mastic from previously removed tile flooring on the 4th floor upper level (rooms 406-410 and 4th floor corridor). Existing mastic is non-friable and has been previously scarified by mechanical means, but a residual base layer remains that must be removed by chemical means. VA will provide their own VPIH consultant to conduct background air monitoring and clearance testing for internal purposes. Contractor shall provide their own separate CIH in accordance with OSHA to conduct continuous air monitoring and final TEM clearance after removal of material. Contractor shall provide legal disposal of all asbestos waste per COMAR 26-11-21-08 Asbestos Waste Disposal. Records of hazardous waste disposal (such as manifests, hazardous waste profiles, LDRs) MUST be provided by approved waste transporter and signed by an approved VAMHCS Manifest signer from the VAMHCS Safety Department ONLY. All records provided to COR and VAMHCS GEMS Coordinator at Sign up to see this detail 10-day NESHAPS notification to MDE and the EPA for demolition or renovation (40 CFR § 61.145, Figure 3, Notification of Demolition and Renovation), Provide completed copy to VAMHCS Projects COR. Prepare and submit asbestos abatement plan to VAMHCS Projects COR for approval before proceeding with work. Work Item 3: The contractor shall seal existing penetrations within the work area between floors with the appropriate fire-rated material and/or fire caulking. This scope specifically shall include: Installation of a UL-listed 2hr fireproofing assembly around an existing generator exhaust pipe penetration through the concrete floor at the 2nd, 3rd, and 4th floor levels (located in the corner of room 1G-108, 227, 323, and 409). Approximate floor penetration is roughly 18 x18 with a 12-14 diameter insulated pipe passing though. Basis of Design UL Firestop Assembly shall be C-AJ-5210 . Infill/Fireproofing around all existing radiator steam pipe penetrations within the work area. Approximate 4 diameter hole with ½-2 diameter pipe. Basis of Design UL Firestop Assembly shall be C-AJ-1551 . Contractor shall include infill of (2) penetrations at each radiator (located below windows within work area) in proposal. Safety and Environmental Precautions: The Contractor shall comply with all applicable Federal, State, and local legal requirements regarding workers health and safety. The requirements include but are not limited to, those found in Federal and State Occupational Safety and Health Act (OSHA) statutes and regulations, such as applicable provisions of Title 29, Code of Federal Regulations (CFR) Parts 1910 and 1926. Contractor is solely responsible for determining the legal requirements that apply to activities and shall ensure safe and healthful working conditions for its employees. OSHA and VA CONSTRUCTION SAFETY STANDARDS shall be enforced. Contractor Supervisor must have 30-hour OSHA Construction Safety course. All contractor employees must have 10-hour OSHA Construction Safety course. Follow all ICRA guidelines for dust control during all construction and demolition work. A construction dust Risk Assessment will be conducted by the Medical Center s Infection Control Nurse. Bi-weekly inspections of barriers and work areas will be conducted by Infection Control Nurse, Safety Manager, and COR to enforce implementation of risk assessment. Contractor shall assume the responsibility to guard against causing of fires and/or explosions and to protect Government Property. The Contractor shall perform the work in a manner consistent with the area security and fire safety regulations especially with regards to exits and exit way access. Utility shutdowns shall not compromise security, communication, or fire safety for occupants. The work is in a professional environment, employees must conduct themselves accordingly. Employees shall not use abusive language, carry firearms, or bring alcoholic beverages on site. Employee's dress code shall consist of normal work uniform. Shirts must be worn at all times. No flammable liquids shall be stored or used in the medical center. The Contractor shall receive from the station fire department a permit for all cutting, welding, and soldering. All permits shall be prominently displayed during all construction. Permits must be opened at the start of each activity and closed at the end of each workday. In order to provide for control of all environmentally hazardous materials arising from demolition and/or construction activities, the Contractor shall comply with all applicable environmentally hazardous material control and all applicable provisions of the Corps of Engineers Manual EM 385-1-1, General Safety Requirements as well as the specific requirements stated elsewhere in the Contract Documents. Disposal and/or recycling of all demolished building materials and construction waste per applicable regulations shall be included. Construction Requirements: The Contractor shall have the skills, availability, capacity, and all other required resources required to complete the job on time without delay. All work shall comply with local, state, and federal rules and regulations, and VA technical standards. If not specified, all work shall meet or exceed the specifications of currently installed work. Provide daily on-site project management to coordinate all building trades and provide liaison for construction and VA Project Engineering. Superintendent and Site Safety and Health Officer shall be designated and shall be always present at the project site. All employees of contractor shall comply with VA Security management program and obtain permission of the VA police, be identified by project and employer, and be restricted from unauthorized access. VA issued ID Badges shall be worn by all workers while within the campus boundaries. Contractor shall make all necessary arrangements to obtain the required security investigation for badging prior to commencement of on-site work. VA issued ID Badges shall be always worn by all workers. All equipment and materials shall be approved prior to being brought on job site. Buy American-Construction Materials clause applies to all construction material purchases. Normal work hours are Monday through Friday 7:00 a.m. to 4:30 p.m. Contractor shall make prior arrangements to work earlier or later with Project Manager. VA shall not grant access to sub-contractors; it is the responsibility of the contractor. Unless noted otherwise, all new surface repair work shall match the existing adjacent work to the maximum extent practicable. Contractor shall provide general clean up to construction area daily to the satisfaction of the COR. Warranty on new work shall extend for a period of no less than 1 year from date of final acceptance of project completion per FAR. Attached References: The references noted below supplement this scope of work Attachment 1: 23H Repair Area Estimation Attachment 2: 23H Floor Plans Attachment 3: 512A5-25-003 Combined Specifications -----END OF SCOPE OF WORK-----

More opportunities from Department Of Veterans Affairs → 245-NETWORK Contract Office 5 (36C245)

Same awarding agency

NAICS: 611692
New
Federal
Rehabilitative Driving Services | Request for Quote | Indefinite Delivery Requirements Contract
Solicitation # 36C24527Q0066
The Department of Veterans Affairs is soliciting quotes for an Indefinite Delivery Requirements Contract (IDRC) to provide Driver Rehabilitation Services for the Clarksburg Veterans Affairs Medical Center in West Virginia. This Total Small Business Set-Aside procurement aims to provide professional evaluation and instruction for disabled veterans, including those with paraplegia, tetraplegia, hemiplegia, amputation, and neurological disorders, to ensure the safe and competent use of adaptive equipment and mastery of driving skills in accordance with State DMV regulations. The contract spans a five-year pricing period from February 1, 2027, to January 31, 2032, with services delivered at the medical center or the veteran's residence. Award will be based on the lowest price technically acceptable (LPTA) criteria. Technical acceptability is contingent upon personnel holding at least a Baccalaureate degree in a related rehabilitation therapy field, the provision of specific adaptive equipment, and the ability to meet strict scheduling timelines, including scheduling veterans within seven calendar days of referral and completing training within fourteen calendar days of initial contact. The contractor must comply with VA information security and custodial requirements, execute a Business Associate Agreement, and manage records according to NARA/36 CFR standards. Invoices are to be submitted monthly in arrears via the FSC e-Invoice system.
Automobile Driving Schools

POSTED

4 days ago

DEADLINE

in 20 days
View Details
NAICS: 325120
New
Federal
6835--Clarksburg Medical Gas Cylinders
Solicitation # 36C24527Q0065
Solicitation 36C24527Q0065 is a request for medical gas and cylinder rental services for the Louis A Johnson VAMC in Clarksburg, West Virginia. This procurement is a total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The scope of work includes the supply of various medical gases, such as oxygen, nitrous oxide, and nitrogen, as well as lung diffusion mixtures. All gases must conform to United States Pharmacopeia and National Formulary specifications, and manufacturers must be FDA registered and comply with Current Good Manufacturing Practice regulations. Key requirements include the ability to deliver liquid oxygen within 24 hours or the next business day, adherence to CGA color coding and valve standards, and compliance with DOT retesting regulations. The government will award the contract to the responsible quoter who is determined technically acceptable and offers the lowest evaluated price. Technical acceptability is evaluated on a pass/fail basis, focusing on the vendor's ability to meet the statement of work, provide necessary licenses and certifications, and maintain required insurance. Quotations must be submitted via email to Ryan Singletary by December 11, 2026, at 12:00 PM EST. Submissions must include a signed SF 1449 and SF 30, and must be formatted in 12-point font without promotional materials. Payment will be processed electronically through the VA's Electronic Invoice Presentment and Payment System.
Industrial Gas Manufacturing

POSTED

4 days ago

DEADLINE

in 14 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS