Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from General Services Administration was posted on June 14, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

47PJ0023R0069 - DBB - NSF Ice Core Facility - Solicitation

Closed
47PJ0023R0069Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 15 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 15 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 15 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 15 hours ago

DEADLINE

in 10 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Lakewood, CO, 80225, USA

Set-Aside

NONE

Documents

17

47PJ0023R0069 Amendment 0001

PDF, High priority: read this firstamendment
High

47PJ0023R0069 Amendment 0002

PDF, High priority: read this firstamendment
High

47PJ0023R0069 - Ice Core Facility Construction

PDF, High priority: read this firstrfp
High

47PJ0023R0069 - NSF Ice Core Facility Amendment 0002

PDF, High priority: read this firstamendment
High

47PJ0023R0069 - NSF Ice Core Facility DBB Solicitation Amendment 0001

PDF, High priority: read this firstamendment
High

Attachment B - NSF Ice Core Facility Pricing Form

XLSX, High priority: read this firstspecifications
High

CO20230023 - Colorado Building Construction Wage Determination

PDF, High priority: read this firstwage-determination
High

47PJ0023R0069 - Attachment E: CUI Building Information Request

DOCX, Low prioritysupporting-documents
Low

47PJ0023R0069 - Offeror Representations and Certifications

DOCX, Low priorityreps-and-certs
Low

Attachment A - Past Performance Questionnaire

DOCX, Low prioritypast-performance
Low

Attachment C - Model Subcontracting Plan Template

DOCX, Low prioritysupporting-documents
Low

Attachment D - Authorized Negotiators

DOCX, Low prioritysupporting-document
Low

GSA 527 Contractor's Qualifications and Financial Information

PDF, Low priority6 pages · past-performance
Low

GSA Affiliated Custom Accounts (GACA) Instructions

PPTX, Low priority10 pages · other
Low

GSA Affiliated Custom Accounts (GACA) Memo

PDF, Low priorityspecial-notice
Low

Ice Core Storage Facility - Questions and Answers

PDF, Low priorityq-and-a
Low

NSF ICE Core Facility Site Visit Sign-in Sheet

PDF, Low priorityindustry-day
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

6 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R8 Acquisition Management Division
Contacts2 people available
OfficeLAKEWOOD, CO, 80225, USA
Office AddressLAKEWOOD, CO, 80225, USA

Full Description

Show more
June 13, 2023, Amendment 0002 - The purpose of amendment 0002 is to include the Questions and Answers received through June 9, 2023, Include Clause 52.204-27 in the agreement, the SF1442 has been revised to allot for more time for Government acceptance after offers are received, include addendums to G-503 - Standard Partition Types & G-504 - Standard Floor/Ceiling Assemblies (located in the Appendix CUI required), and provide the Site-Visit sign in sheet. May 25, 2023, Amendment 0001: The purpose of amendment 0001 to solicitation No.47PJ0023R0069 is to adjust some of the language in the definition for - A Cold Storage Project as well as adjust additional language in subfactor 1a. See attached The National Science Foundation - Ice Core Facility (NSF-ICF) provides long term storage, processing, and examination of ice cores from the United States (U.S.) Arctic and Antarctic ice drilling operations. Due to the nature of how the ice cores were collected as well as the time frame in which they were collected, these ice cores are irreplaceable. Proper storage of these ice cores requires temperatures far below typical refrigeration systems to maintain their integrity for ongoing research. This project will deliver a new NSF-ICF freezer space, contained within Building 810 located at the Denver Federal Center. This project is intended to replace the existing NSF-ICF that was built in 1993 due to the aging equipment and needs for improved space use. This acquisition is for the Design-Bid-Build (D-B-B) contract for the new construction of an Ice Core Facility in Building 810 at the Denver Federal Center in Lakewood, CO. Design services were procured in accordance with FAR Part 36.6. The Ice Core Facility is composed of five primary functional programmatic elements: 1) Refrigerated Warehouse Spaces, 2) Refrigeration Equipment Space, 3) Shop/Storage Spaces, 4) Office and Support Spaces, and 5) Loading/Shipping Spaces. The project site is currently projected to be 19,058 sq. ft. contained within Building 810. Construction will be in accordance with the GSA 2021 PBS P-100 baseline.

More opportunities from General Services Administration → Pbs R8 Acquisition Management Division

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS