Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

48-inch Steel Pipeline Installation and Realignment

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the installation and replacement of 5,742 linear feet of 48-inch diameter steel pipeline for prime contractors working on City of San Diego water infrastructure projects. The scope of work includes realigning pipeline sections to paved public roads, installing a 48-inch flange and a 54-inch reducer, and managing the transfer of water service connections to ensure a fully installed and tested pipeline system. All operations must strictly adhere to the City of San Diego Environmental Impact Report and the Mitigation Monitoring and Reporting Plan. Classified under NAICS code 237110, the project is centered in California and focuses on critical water utility infrastructure improvements.

General Info

Subcontract for installing 5,742 feet of steel pipeline for San Diego water infrastructure.

Agency

California → City of San Diego

Place of Performance

CA

Set-Aside

NONE

Documents

This scope was carved out of Otay Second Pipeline Improvements Program.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom Otay Second Pipeline Improvements Program
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Diego
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of San Diego
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs and replaces 5,742 LF of 48-inch diameter steel pipeline for prime contractors on City of San Diego water infrastructure projects. Realigns pipeline sections to paved public roads, installs a 54-inch reducer and 48-inch flange, and transfers water service connections. Work must comply with the City of San Diego Environmental Impact Report and Mitigation Monitoring and Reporting Plan. Delivers a fully installed and tested pipeline system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 16 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS