Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on August 28, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

48--NEEDLE VALVE,DIVE R

Closed
N0010424QFF04Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332919
New
DIBBS
COUPLING, ACTUATOR-H
Solicitation # SPE7M1-27-T-0245
Solicitation SPE7M1-27-T-0245, issued by the DLA Weapons Support Maritime Supply Chain, is a request for quotations for nine actuator-handwheel valve couplings, identified by NSN 4820-01-257-1546. This critical application item is associated with Triumph Controls, LLC part numbers 57367-4 and QRS4. The procurement falls under NAICS code 332919, with delivery required within 69 days after order, specifying an original required delivery date of March 22, 2026, and a need ship date of May 26, 2026. Shipping is FOB Origin, with inspection and acceptance occurring at the destination, specifically the DLA Distribution DDSP New Cumberland facility in Pennsylvania. The contract mandates strict adherence to DLA packaging and marking standards, including MIL-STD-2073-1E and MIL-STD-129, with specific requirements for the preservation of technical literature and hardware via Method IC-1. Environmental and safety constraints prohibit the intentional addition of mercury or mercury-containing compounds to the hardware. Administratively, the contractor must utilize the Wide Area WorkFlow system for invoicing and payment requests. Compliance with various Federal Acquisition Regulation and Defense Federal Acquisition Regulation Supplement clauses is required, including the Buy American and Balance of Payments Program, NIST SP 800-171 cybersecurity assessment requirements, and safeguarding of covered defense information.
DLA WEAPONS SUPPORT MARITIME SUPPLY CHAIN

POSTED

1 day ago

DEADLINE

in 2 days

AI Contract Overview

Show more

This contract involves the procurement of twelve units of NSN 1H-4820-015054186-L1, TDP VER 001, to be delivered to Portsmouth Naval Shipyard in Kittery, Maine. The acquisition is exclusively set aside for small business concerns, as indicated by the FAR clause 52.219-6, with the specific type of small business set-aside to be determined in the solicitation, potentially including HUBZone, Service-Disabled Veteran-Owned, Women-Owned Small Business, or Minority Institution set-asides, depending on the final solicitation clauses. Interested vendors can access relevant military and federal specifications, standards, and other standardized documents through the DoD Single Stock Point or ASSIST-Online, with instructions provided for obtaining these documents either online or via mail or phone if internet access is unavailable. The solicitation, posted on August 28, 2025, is a presolicitation notice under the total small business set-aside category, with responses due by October 24, 2025. The contracting activity is the Naval Supply Systems Command Weapon Systems Support in Mechanicsburg, Pennsylvania, with Scott Youngblood serving as the primary point of contact. The contract aims to support the Department of Defense’s operational requirements, emphasizing small business participation in the procurement process. Additional details and updates can be accessed through the provided link on SAM.gov.

General Info

Navy seeks 12 needle valves, set aside for small businesses, solicitation open until October 2025.

Contract Value

$19,300

NAICS

332919 - Other Metal Valve and Pipe Fitting Manufacturing

Place of Performance

PA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

7 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Sep 11, 2024 to Jul 14, 2025. The notice description changed.

Notice updated

The notice description changed. The point of contact changed.

Type Changed

Solicitation → Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Jul 14, 2025 to Oct 24, 2025. The notice description changed.

Notice updated

The notice description changed.

Type Changed

Solicitation → Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support Mech
Contacts1 person available
OfficeMECHANICSBURG, PA, 17050-0788, USA
Office AddressMECHANICSBURG, PA, 17050-0788, USA

Full Description

Show more
CONTACT INFORMATION|4|N743.30|WVE|717-605-2379|scott.r.youngblood2.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specification sections C and E. | INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| GENERAL INFORMATION-FOB-DESTINATION|1|A| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report- Certifications Combo- Receiving Report & Invoice- Material |N/A|TBD|N00104 |TBD|N39040 |N50286 |TBD|133.2|N/A|N/A|N39040 |N/A|N/A|SEE DD F ORM 1423 |PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL | NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|365 days after acceptances of material|365 days after acceptances of material||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024)|13|332919|750|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| This Amendment is issued to update POC and extend closing date. \ DD1423 Data Item A001 may be waived if already on file at NAVSUP WSS Mechanicsburg. Any contract awarded as a result of this solicitation will be "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). NAVSUP WSS Mechanicsburg will be considering past performance in the evaluation of offers in accordance with FAR 13.106(a)(2) and DFARS 252.213-7000. If drawings are included in the solicitation, access needs to be requested on the individual solicitation page on Contracts Opportunities on the Government's SAM website. After requesting access, send an email to the Primary POC listed on the solicitation. Final delivery of material (365 days) Please quote actual delivery days \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.2.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=7067173 |53711| A| |D|0000.A | A|49998|0048541 DRAWING DATA=7067173 |53711| A| |D|0001 | A|49998|0082337 DRAWING DATA=7067173 |53711| A| |D|0002.1 | A|49998|0078327 DRAWING DATA=7067173 |53711| A| |D|0002.2 | A|49998|0037043 DRAWING DATA=7067173 |53711| A| |D|0003 | A|49998|0009917 DRAWING DATA=7067173 |53711| A| |D|0004 | A|49998|0016153 DRAWING DATA=7067173 |53711| A| |D|0005 | A|49998|0032058 DRAWING DATA=7067173 |53711| A| |D|0006.1 | A|49998|0060842 DRAWING DATA=7067173 |53711| A| |D|0006.10 | A|49998|0042399 DRAWING DATA=7067173 |53711| A| |D|0006.2 | A|49998|0058091 DRAWING DATA=7067173 |53711| A| |D|0006.3 | A|49998|0060233 DRAWING DATA=7067173 |53711| A| |D|0006.4 | A|49998|0055423 DRAWING DATA=7067173 |53711| A| |D|0006.5 | A|49998|0059182 DRAWING DATA=7067173 |53711| A| |D|0006.6 | A|49998|0057952 DRAWING DATA=7067173 |53711| A| |D|0006.7 | A|49998|0049544 DRAWING DATA=7067173 |53711| A| |D|0006.8 | A|49998|0062156 DRAWING DATA=7067173 |53711| A| |D|0006.9 | A|49998|0036407 DRAWING DATA=7067173 |53711| A| |D|0007.1 | A|49998|0026749 DRAWING DATA=7067173 |53711| A| |D|0007.10 | A|49998|0035582 DRAWING DATA=7067173 |53711| A| |D|0007.11 | A|49998|0042313 DRAWING DATA=7067173 |53711| A| |D|0007.12 | A|49998|0035500 DRAWING DATA=7067173 |53711| A| |D|0007.13 | A|49998|0038201 DRAWING DATA=7067173 |53711| A| |D|0007.14 | A|49998|0037294 DRAWING DATA=7067173 |53711| A| |D|0007.15 | A|49998|0039326 DRAWING DATA=7067173 |53711| A| |D|0007.16 | A|49998|0037697 DRAWING DATA=7067173 |53711| A| |D|0007.17 | A|49998|0034858 DRAWING DATA=7067173 |53711| A| |D|0007.2 | A|49998|0035117 DRAWING DATA=7067173 |53711| A| |D|0007.3 | A|49998|0039309 DRAWING DATA=7067173 |53711| A| |D|0007.4 | A|49998|0044738 DRAWING DATA=7067173 |53711| A| |D|0007.5 | A|49998|0038804 DRAWING DATA=7067173 |53711| A| |D|0007.6 | A|49998|0038150 DRAWING DATA=7067173 |53711| A| |D|0007.7 | A|49998|0038755 DRAWING DATA=7067173 |53711| A| |D|0007.8 | A|49998|0039887 DRAWING DATA=7067173 |53711| A| |D|0007.9 | A|49998|0038653 DRAWING DATA=7067173 |53711| A| |D|0008.1 | A|49998|0033222 DRAWING DATA=7067173 |53711| A| |D|0008.2 | A|49998|0064496 DRAWING DATA=7067173 |53711| A| |D|0008.3 | A|49998|0064758 DRAWING DATA=7067173 |53711| A| |D|0008.4 | A|49998|0038089 DRAWING DATA=7067173 |53711| A| |D|0008.5 | A|49998|0013892 DRAWING DATA=7067173 |53711| A| |D|0008.6 | A|49998|0011002 DRAWING DATA=7067173 |53711| A| |D|0009 | A|49998|0195386 DRAWING DATA=7067173 |53711| A| |D|0010 | A|49998|0127145 DRAWING DATA=7067173 |53711| A| |D|0011 | A|49998|0206713 DRAWING DATA=7067173 |53711| A| |D|0012 | A|49998|0195674 DRAWING DATA=7067173 |53711| A| |D|0013 | A|49998|0196125 DRAWING DATA=7067173 |53711| A| |D|0014 | A|49998|0083159 DRAWING DATA=7067173 |53711| A| |D|0015 | A|49998|0072669 DRAWING DATA=7067173 |53711| A| |D|0016 | A|49998|0068319 DRAWING DATA=7067173 |53711| A| |D|0017 | A|49998|0194115 DRAWING DATA=7067173 |53711| A| |D|0018 | A|49998|0167443 DRAWING DATA=7067173 |53711| A| |D|0019 | A|49998|0142446 DRAWING DATA=7067173 |53711| A| |D|0020 | A|49998|0136549 DRAWING DATA=7067173 |53711| A| |D|0021 | A|49998|0190828 DRAWING DATA=7067173 |53711| A| |D|0022 | A|49998|0111691 DRAWING DATA=7067173 |53711| A| |D|0023 | A|49998|0147230 DRAWING DATA=7067173 |53711| A| |D|0024 | A|49998|0116266 DRAWING DATA=7067173 |53711| A| |D|0025 | A|49998|0197043 DRAWING DATA=7067173 |53711| A| |D|0026 | A|49998|0060716 DRAWING DATA=7067173 |53711| A| |D|0027 | A|49998|0216157 DRAWING DATA=7067173 |53711| A| |D|0028 | A|49998|0190775 DRAWING DATA=7067173 |53711| A| |D|0029 | A|49998|0118818 DRAWING DATA=7067173 |53711| A| |D|0030 | A|49998|0109763 DRAWING DATA=7067173 |53711| A| |D|0031 | A|49998|0095824 DRAWING DATA=7067173 |53711| A| |D|0032 | A|49998|0086423 DRAWING DATA=7067173 |53711| A| |D|0033 | A|49998|0062088 DRAWING DATA=7067173 |53711| A| |D|0034 | A|49998|0145131 DRAWING DATA=7067173 |53711| A| |D|0035 | A|49998|0081866 DRAWING DATA=7067173 |53711| A| |D|0036 | A|49998|0073338 DRAWING DATA=7067173 |53711| A| |D|0037 | A|49998|0064263 DRAWING DATA=7067173 |53711| A| |D|0038 | A|49998|0141811 DRAWING DATA=7067173 |53711| A| |D|0039 | A|49998|0074339 DRAWING DATA=7067173 |53711| A| |D|0040 | A|49998|0086557 DRAWING DATA=7067173 |53711| A| |D|0041 | A|49998|0090581 DRAWING DATA=7067173 |53711| A| |D|0042 | A|49998|0087917 DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-A564 | | | |190501|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-DTL-1222 | | |J |001208|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|1 | | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | 3. REQUIREMENTS 3.1 ;The Needle Valve must be made in accordance with NAVSEA drawing 7067173 part number 95, except as amplified or modified herein.; 3.2 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Needle Valve; Material - ;ASTM-A564, Type 630, Condition H1100; 3.3 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.3.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.3.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222. 3.3.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.4 O-ring grooves and mating sealing surfaces must be inspected per the contractually invoked drawings or specifications. When the drawings or specifications do not provide specific defect criteria or state that no defects are allowed, the General Acceptance Criteria (GAC) standard must be used for inspecting O-ring grooves and mating sealing surfaces only. Repairs to sealing surfaces and O-ring grooves with unacceptable defects may be accomplished within the limits of the size and tolerances provided in the applicable drawing. Repairs thatwould exceed these limits require approval (including final dimensions). The data that is red lined (crossed out) is excluded from the GAC for this contract and is not to be used for acceptance or rejection criteria. The GAC document is identified as Contract Support Library Reference Number CSD008 at https://register.nslc.navy.mil/ 3.5 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.5.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.5.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.5.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.6 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. 3.7 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.8 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.8.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.9 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-4 3.9.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.9.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.9.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.9.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.9.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption. 3.10 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected. 3.10.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.10.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.11 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.11.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document. 3.11.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract. 3.11.3 The prime contractor must ensure that the purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the purchased product on the end item represented by this contract. 3.11.4 The prime contractor must evaluate the requirements of the contractand select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be established. Records of this effort must be available for review by the government. 3.11.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier. 3.12 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.12.1 Visual examination upon receipt to detect damage during transit. 3.12.2 Inspection for completeness and proper type. 3.12.3 Verification of material quality received. 3.12.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.12.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.12.6 Identification and protection from improper use or disposition. 3.12.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.12.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.12.9 Material returned to the contractor must be handled as GFM. 3.13 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3, Section C of this contract/purchase order. 3.13.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that implement the material control requirements stated herein and elsewhere in this Contract/Purchase Order. 3.14 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number, as applicable, which must also be marked on the material. This traceability marking on the material must provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once in every eight hours of operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.14.1 Material Marking for Traceability and Identification - The following are the minimum marking requirements. Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order. In addition to the marking requirements on applicable drawings and/or specifications, marking for traceability is required. All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing. 3.14.2 Traceability markings for items with precision machined or plated surfaces, or material with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and the tag securely affixed to the material. 3.14.3 Marking must be legible and must be located so as to not affect the form, fit, and function of the material. ; ; 3.15 See CDRL DI-MISC-81020 (Chemical and Mechanical) - Material Certification - In addition to the certification data requirements specified in DI-MISC-81020, the following material certification requirements apply: 3.15.1 Quantitative chemical and mechanical analysis of material traceable to traceability markings is required. Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as applicable, of the material supplied. 3.15.2 Re-identification and re-certification of material is required when the material is subjected to a process which alters it's properties. If the starting material or raw stock is processed in a manner that will not affect its chemical composition or mechanical properties, the original certifications for the chemical composition and mechanical properties, as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties is required if a process is used during fabrication that alters the original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of the material must be re-determined and documented to reflect the altered condition. The altered material must be uniquely re-identified. The properties thus determined and documented, are required for final certification and must conform to the material specification or the contract/purchase order requirements. When only the mechanical properties are altered, the original certification forchemical composition must be overstamped and annotated with the unique traceability marking used with the altered material and at a minimum contain the information below. TRACEABILITY MARKING ________________________________________________ (marking on finished item) IS FABRICATED FROM RAW MATERIAL IDENTIFIED TO HEAT/LOT NUMBER ______________ AND HEAT TREAT NUMBER ____________________ (when applicable) _________________________________________ DATE _____________________ (name and signature of auth. co. rep.) 3.15.3 Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract requirements. Transcription of certification data is prohibited. 3.15.4 Statements on material certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.15.5 If material is received without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.16 Material Handling - The written material control process must include the following: 3.16.1 All raw materials must have traceability markings (except as specified below). 3.16.2 Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability. 3.16.3 When traceability markings will be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of heats/lots or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.16.4 Brazing or weld filler metals for strength welds forming or integral with pressure containing components or assemblies requiring traceability must be verified to be the correct material, and type or grade, as applicable, prior to consumption. At a minimum, material verification must consist of inspection of material test reports for conformance to specified requirements. Control of welding and brazing filler metals must be maintained to the point of consumption to assure use of the correct type and grade. Markings and traceability requirements do not apply to brazing and weld filler metals after consumption. It is the responsibility of the prime contractor to ensure conformance with the above requirements on welds performed by their subcontractors. 3.16.5 Purchase orders for raw material must specify that the material be traceable to material certification test reports by traceability markings on the material and identified on the test reports. The certification data requirements contained in DI-MISC-81020 must be invoked by the prime contractor on all subcontractors supplying Level I material. 3.16.6 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.17 Receiving inspection - 3.17.1 Products and services produced by sub-tier suppliers for incorporation in the contract end item must be subject to inspection or audit at the time of receipt by the prime prior to further processing within the prime contractor's plant or shipment to another location. 3.17.2 Receiving Inspection must include as a minimum - Verification that the traceability marking on the material agrees with that on the certification test reports. Verification that certification test reports are legible and complete. Verification that the contents of the certification test reports are in compliance with...

More opportunities from Department Of Defense → Navsup Weapon Systems Support Mech

Same awarding agency

NAICS: 332999
New
Federal
Request for Information: Additive Manufacturing
Solicitation # N0010427RZ058
The Naval Supply Systems Command Weapon Systems Support is conducting market research through Request for Information N0010427RZ058 to identify qualified sources capable of designing, producing, and delivering piece part components or entire assemblies using additive manufacturing methods. The government is specifically interested in vendors who can produce items such as valves, actuators, and manifolds, as identified in the candidate NIIN list. While contractors may use additive manufacturing or traditional wrought and cast processes, any additive manufactured components must be fully interchangeable with their traditional equivalents and strictly adhere to the baselines established in Project Peculiar Document PPD 802-8436658. All end items must meet mandated quality assurance requirements, including non-destructive testing and specific dimensional tolerances detailed in the technical data packages. This notice is for information gathering only and does not constitute a solicitation or a binding contract. The government is seeking detailed information on vendor facilities, equipment, and certifications such as ISO 9001 and AS9100, as well as past performance with similar military or commercial hardware. Additionally, the agency is requesting industry feedback on objective evaluation criteria for future competitive awards and the structuring of performance-based incentives within Firm-Fixed-Price contracts. Interested vendors must submit their administrative details and capability statements in PDF format to the designated point of contact by October 22, 2026.
All Other Miscellaneous Fabricated Metal Product Manufacturing

POSTED

about 6 hours ago

DEADLINE

in 13 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS