The contract titled 484-27 Despatch LBB 2-18 Ovens pertains to asphalt-related work and is solicited under number SRC0000040919 by the Ohio Department of Transportation. The solicitation was posted on July 30, 2026, with a response deadline of August 18, 2026, at 5:00 PM Eastern Time. The work is designated for performance in the state of Ohio, though specific city or zip details are not provided. This solicitation is categorized under SLED, indicating it is intended for state, local, or educational government entities. No set-aside type or NAICS code is specified, suggesting the procurement may be open to all qualifying contractors without preferential sizing or classification. The official interface for submitting responses and gathering further details is accessible via the Ohio Buys portal.
General Info
Agency
NAICS
Place of Performance
OH, USASet-Aside
Documents
(2)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Full Description
OhioBuys training materials can be located at this site: https://procure.ohio.gov/bidders-and-suppliers/resources/Bidder+and+Supplier+Training/02_OB+training
Asphalts
Inquiries Inquiry 93807 | - What is being placed in the oven? - What are the dimensions and weight of each part being placed in the oven? - Please describe how the oven will be loaded and unloaded (manually, robot, etc.)? - What is the maximum processing temperature required? - Are flammable solvents generated during the process cycle? If so, please identify the solvents and volume of each batch. - Are other fumes generated during the process that require exhaust? - Will temperature uniformity certification be required? - What type of controls are required (Protocol3 is standard, PLC option available)? - Is a temperature recorder required? - Is a stand required (if applicable)? - Will oven controls need to interface or interlock with other upstream or downstream equipment? - What voltage input is available? - Please describe any other special requirements. - What is the application of the oven? - What is the ship-to address? (necessary information for freight estimate? | Answer: - What is being placed in the oven? Asphalt mixtures, aggregates and asphalt binder- What are the dimensions and weight of each part being placed in the oven? From pans with asphalt mix and 12” x 14” boxes weighing roughly 20,000 grams each (12” x 14”) each ( as many as the rack will hold), Multiple Gyratory molds at 14,000 grams each 10” each. the shelves must be able to hold up to 200 lbs per shelf as stated in Despatch’s spec sheet since we can be putting multiple asphalt items in the oven- Please describe how the oven will be loaded and unloaded (manually, robot, etc.)? Manually- What is the maximum processing temperature required? 400F- Are flammable solvents generated during the process cycle? If so, please identify the solvents and volume of each batch. For reheating the samples there will not be any solvents used in the oven.- Are other fumes generated during the process that require exhaust? No- Will temperature uniformity certification be required? What is stated in the Despatch spec sheet- What type of controls are required (Protocol3 is standard, PLC option available)? Standard- Is a temperature recorder required? No- Is a stand required (if applicable)? No- Will oven controls need to interface or interlock with other upstream or downstream equipment? No- What voltage input is available? 240 - Please describe any other special requirements. None except what is in the requirements for bid- What is the application of the oven? Asphalt testing- What is the ship-to address? (necessary information for freight estimate? Ohio Department of Transportation, Office of Materials Management, 1600 West Broad Street, Columbus, Ohio 43223, | Answered: 8/6/2026
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS