49 Wrangler Road 36-inch Corrugated Metal Pipe Repair Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Ventura County Watershed Protection District is undertaking the repair of a deteriorated 36-inch corrugated metal pipe at 49 Wrangler Road in Simi Valley, California, to address structural failure caused by corrosion and erosion damage observed after the 2023/2024 storm season. The pipe, which conveys residential stormwater runoff from Wrangler Road to Bus Canyon Drain in Challenger Park, requires rehabilitation within a 15-foot-wide right-of-way easement on private property. Approximately 145 feet of the pipe, from the central manhole cover to a downstream concrete collar, will be restored using a cement-sand slurry fill and cured-in-place pipe lining, while the final 21 feet from the collar to the headwall will be completely replaced with 36-inch Class I Reinforced Concrete Pipe. The existing concrete headwall will be demolished and replaced with a new 6-foot-high, 25-foot-long, 4-foot-wide trapezoidal structure constructed of grouted 1-ton rock riprap, resulting in a minor footprint increase of 88 square feet. Eroded areas will be cleared of debris and oversized rocks, then backfilled with 70 cubic yards of imported earthen material sourced from the Runkle Stockpile and compacted to 90% relative density. All work is confined to the easement and occurs outside the bed or bank of Bus Canyon Creek. Access to the site will be via Wrangler Road and the Bridle Path Homeowners Association trail, with no mature trees scheduled for removal. Biological surveys will be conducted before and during construction to protect nesting birds and other sensitive resources, and all activities must comply with Best Management Practices outlined in the 2008 Final Program Environmental Impact Report, as well as applicable state and local environmental permits. The project is set to begin June 9, 2025, and conclude on July 7, 2025, with a 20-day work window. The agency does not provide contract value, pricing, federal acquisition regulation clauses, or formal invoicing or payment instructions, as this is a locally administered civil works project governed by environmental compliance and public agency procedures rather than federal procurement rules. The project is exempt from small business set-asides, and the offeror is a public agency, eliminating the need for standard federal representations or socioeconomic certifications.

General Info

Repair 145 feet of corroded pipe and replace 21 feet with concrete, restore headwall, backfill with earthen material, comply with environmental permits.

Agency

California → Ventura County Watershed Protection District

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

49 Wrangler Road, Simi Valley, CA, 93065

Set-Aside

NONE

Documents

(1)

Ventura County 49 Wrangler Road CMP Repair Environmental Document Filing Fee Receipt

PDFfish

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Ventura County Watershed Protection District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Ventura County Watershed Protection District
Office AddressN/A
Contacts
Jeff PalmerAssistant Director

Full Description

Show more
Watershed Protection (WP) is proposing to repair a 36-inch Corrugated Metal Pipe (CMP) to correct facility and erosion damage within its 15-foot-wide right of way easement on private property. A sinkhole and erosion damage observed following the 2023/2024 storm season resulted from corrosion leading to structural failure of the CMP, which carries residential street runoff from Wrangler Road to Bus Canyon Drain in Challenger Park in Simi Valley. Approximately 145-feet of the 36-inch CMP from the existing manhole cover in the central area of the property to the downstream concrete collar located 20-feet upstream of the headwall will be repaired by filling damaged sections with a cement sand slurry mixture and then lining it with a cured-in-place pipe (CIPP). The eroded areas would be cleared of all debris and oversized rocks (greater and 3-inch diameter), backfilled with 70-cubic yards of imported earthen fill material from Runkle Stockpile, and recompacted to 90% relative density. The 21-feet of CMP from the concrete collar to the headwall will be removed and replaced with 36-inch Class I Reinforced Concrete Pipe (RCP). The existing concrete headwall will be removed and replaced with grouted 1-ton rock riprap around the 36-inch Class I RCP. This new trapezoidal headwall will be 6-feet high from its footing apparent at ground surface, 25-feet in length at its top elevation, and approximately 4-feet wide, which is a minor increase of about 88 square feet. All work areas are outside of the bed and bank of the Bus Canyon Creek channel that traverses the park. Access to the work area will be from Wrangler Road via the property owner’s driveway and Bridle Path Homeowner’s Association (BPHA) trail. Biological surveys will be performed before and periodically during work to identify and avoid sensitive biological resources, including nesting birds. No mature trees will be removed. A Final Program Environmental Impact Report (EIR) on Environmental Protection Measures for the Ongoing Routine Operations and Maintenance Program was prepared in May 2008 (State Clearinghouse No. 2002091107). All applicable Best Management Practices described in the EIR and subsequent regulatory permits will be used for the proposed project

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Sanibel Bridge Fender System Repairs
Solicitation # B260308JAK
Lee County, Florida, is inviting qualified contractors to submit sealed bids for the repair, rehabilitation, replacement, and restoration of the Sanibel Bridge fender system and associated marine components, including timber and composite fenders, prestressed concrete piles, pile head repairs, catwalks, navigation lighting, clearance gauges, handrails, and related structural elements. The scope of work must be fully understood and addressed according to the official specifications available exclusively on the County’s procurement portal at https://leegov.ionwave.net, and bidders are responsible for verifying all documents, addenda, and updates posted there, as submissions based on incomplete or incorrect information from other sources will not be accepted. All bids must be submitted electronically via Ion Wave or hand-delivered in a sealed envelope clearly labeled with the solicitation number B260308JAK, project title, bidder name, and contact details to the Procurement Management Division at 2115 Second Street, 1st Floor, Fort Myers, FL 33901 no later than September 9, 2026, at 7:30 PM, with electronic submissions strongly recommended to avoid technical failures. Bidders are required to complete and sign the Bid Invitation, accurately fill out all attributes and bid lines, and include all requested attachments, ensuring files are uncorrupted and fully accessible. Submissions that are incomplete, unreadable, or improperly formatted may be disqualified. All bids will be publicly opened at the same office on the deadline date and time, and selection will be based on compliance with the solicitation’s technical requirements and overall responsiveness. Questions about the solicitation must be submitted electronically through the official portal’s questions tab, and bidders are cautioned that the County bears no responsibility for internet outages or system failures, urging early submission to ensure timely receipt. The point of contact for inquiries is Jason Koza at jkoza@leegov.com or 239-533-8898, and the official posting site remains https://leegov.ionwave.net for all solicitation-related information.
Lee County

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract involves the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing comprehensive civil, structural, mechanical, electrical, instrumentation, and process system upgrades to address per- and polyfluoroalkyl substances in the water supply. The project aims to enhance the plants' capacity to effectively remove these contaminants in compliance with evolving regulatory standards and public health priorities, requiring integrated engineering solutions across multiple disciplines. All work must be performed in California, with specific attention to local infrastructure constraints and environmental considerations. The solicitation, issued by Pyramid Building & Engineering, Inc. under number lacsd-surface-water-pfas-removal-project-no-251-ca, is open for responses until September 3, 2026, and is designated for Disadvantaged Business Enterprises as defined by the Department of Transportation. It is classified under NAICS code 237310 for water and wastewater treatment construction and seeks qualified contractors with expertise in complex treatment system implementations. Primary communication and inquiries should be directed to John Garrison at estimating@pyramidbuilding.net or 760-949-9005, with all proposals expected to meet the required standards for DBE participation and technical delivery under the terms of the solicitation.
Pyramid Building & Engineering, Inc.

POSTED

about 13 hours ago

DEADLINE

in 26 days
View Details
NAICS: 237310
New
SLED
4th Street Mobility Improvements Project and Downtown Bus Stop Improvements Project, Specification No. PW 23-59
Solicitation # PW 23-59
The City of Oxnard is soliciting sealed bids for the 4th Street Mobility Improvements Project and Downtown Bus Stop Improvements Project under Specification No. PW 23-59, with bids due by 2:00 PM on September 9, 2026. The project encompasses a comprehensive range of infrastructure enhancements along 4th Street from C Street to Oxnard Boulevard, including new concrete sidewalks, curb and gutter, road and driveway reconstruction, electrical conduit and pull boxes for street lighting, traffic signals, bus shelters, street furniture, bike lanes, landscaping, and an irrigation system, with striping improvements extending to Meta Street and the intersection with 6th Street. Additionally, approximately fifty downtown bus stops will be upgraded. Work will involve demolition of existing pavement, curbs, gutters, and sidewalks; removal and replacement of street lighting and trees; excavation and reconstruction of roadways; installation of storm drains and concrete structures; adjustment of utility covers to finished grade; placement of asphalt concrete; and final traffic striping. All work must comply with the 2018 edition of the Standard Specifications for Public Works Construction and all amendments through the 2021 edition, collectively referred to as the Greenbook. Bidders must obtain all contract documents exclusively through the City’s electronic bidding portal at Planet Bids, as the Public Purchase platform is not used for this solicitation. Questions regarding the project should not be posted on any public forum. The project is administered by the City of Oxnard’s Public Works Projects Department, and inquiries can be directed to pw-publicprojects@oxnard.org or (805) 385-8280. Bid submissions are required to be sealed and delivered by the stated deadline, and the work is to be performed entirely within the City of Oxnard, California. No set-aside designation is specified, and all prospective contractors are expected to meet the full scope of construction requirements as detailed in the contract documents.
City of Oxnard

POSTED

about 16 hours ago

DEADLINE

in about 1 month
View Details