50 N. Gay Street EV Charging Station Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Lassen Municipal Utility District is forecasting a project to install, operate, and maintain a mix of Direct Current Fast Charging and Level 2 electric vehicle stations at 50 N. Gay Street in Susanville, California. The scope of work involves installing electric vehicle supply equipment, constructing concrete pads for transformers and switchgear, and performing utility trenching to connect the infrastructure to the local electric distribution system. To support the installation, the project includes localized pavement modifications, updated parking lot striping, and the implementation of mulch buffers to manage internal traffic flow. A key environmental requirement of the project is the onsite relocation and preservation of two mature trees to ensure no vegetation is destroyed or permanently removed. No new lighting will be added to the site. This initiative aims to expand public and utility EV fleet infrastructure in Uptown Susanville, providing essential charging access for the general public, local drivers, and transient electric vehicle users.
General Info
Agency
NAICS
Place of Performance
N. Gay Street and Main St, Susanville, CA, 96130Set-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
