Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

COTP Series Capacitor Two-Phase Design Build

Active
89503326RWA000049Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Oregon Transmission Project (COTP) Two-Phase Design-Build 525kV Series Capacitor Bank Replacement Project is a firm-fixed-price solicitation issued by the Department of Energy’s Western Area Power Administration, Western Sierra Nevada Region, with a solicitation number of 89503326RWA000049 and a response deadline of September 1, 2026. The procurement is structured as a two-phase design-build process, beginning with a qualification phase in which offerors must submit corporate experience, technical competency, and past performance data by May 12, 2026, to be eligible for Phase II. Only the top five highest-rated offerors from Phase I will be invited to submit detailed technical and price proposals, which must include a comprehensive design-build team structure, key personnel qualifications, a critical path method schedule using Microsoft Project, a detailed pricing schedule covering specific sites—Maxwell, Tracy, Olinda North, and Olinda South—as well as a bird repellant system, and mandatory attachments including background checks, foreign national data cards, and a completed price bidding schedule. The contract is estimated at $80 million and requires full compliance with the Buy American Act, project labor agreements, wage rate requirements, and strict packaging and marking standards for all equipment shipments, including rust prevention for ferrous materials and protective wrapping for nonferrous components. Performance will be executed across four distinct facilities in California, with all engineering, procurement, fabrication, installation, testing, and commissioning activities governed by rigorous inspection and quality assurance protocols, including government access to contractor facilities for oversight during manufacturing and testing. The contractor must maintain a documented quality control program, adhere to OSHA and Department of Labor safety standards, and comply with classified information handling requirements if applicable. Invoicing must be submitted electronically through the Treasury’s Invoice Processing Platform, supported by Procore for review and tracking, and certified payrolls must be filed with specific labeling protocols. Final payment is contingent upon submission of recycled materials reports, lead paint documentation, and return of proceeds from recycling activities. The evaluation is based on a best value determination where technical and management factors are significantly more important than price, though if all Phase II proposals are deemed equal, award will go to the lowest-priced offer. The contractor must also furnish performance and payment bonds, comply with subcontractor representation rules using SAM and SBA databases, and submit all proposal materials in PDF format with Times New Roman 10-point font, single-spaced

General Info

U.S. DOE seeks design-build replacement of 525kV capacitor banks for California Oregon Transmission Project by September 1, 2026.

Agency

Department Of Energy → Western Sierra Nevada RegionView Agency

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

(16)

WAPA Form 3000-72 Foreign National Data Card

PDFform

Attachment 3 - Tariff Adjustment Terms for COTP Series Capacitor Replacement Project

PDFspecial-contract-terms

Wage Determination CA20260007 for Colusa and Shasta Counties

PDFwage-determination

DOE-M-2012 Basis for Award - Section M Evaluation Factors for RFP 89503326RWA000049

PDFevaluation-factors

Attachment 6 - Design-Build Team Template for Solicitation 89503326RWA000049

DOCXtemplate

Attachment 8 - Price Bidding Schedule COTP Series Capacitor

XLSXprice-schedule

Wage Determination CA20260018 Alameda and Surrounding Counties

PDFwage-determination

Request for Information - PLA for COTP Series Capacitor Replacement Project

DOCXrfi

Past Performance Cover Letter and Questionnaire for WAPA RFP 89503326RWA000049

DOCXpast-performance

Spec. No. 1108 Section C Project Specifications for COTP Series Capacitor Banks

PDFspecifications

Solicitation 89503326RWA000049 - COTP Series Capacitor Replacement Two-Phase Design-Build RFP Section L Addendum

PDFrfp

Attachment 4 - Mobilization and Prep Work Terms for COTP Series Capacitor Replacement Project

PDFspecial-contract-terms

Solicitation 89503326RWA000049 Two-Phase Design-Build 525kV Series Capacitor Bank Replacement Project

PDFrfp

Attachment 7 - Liquidated Damages Addendum to FAR 52.211-12

PDFspecial-terms-addendum

Attachment 9 - Contractor Background Check Instructions SOP

PDFsop

Synopsis for COTP Series Capacitor Design-Build Project

PDFpresolicitation

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Western Sierra Nevada Region
Contacts1 person available
OfficeFolsom, CA, 95630-4710, US
Organization / Agency
Department Of Energy → Western Sierra Nevada Region
View Agency Profile
Office AddressFolsom, CA, 95630-4710, US
Contacts
Jolene DaoudContracting Officer

Full Description

Show more
Amendment 3-Request for Proposals - California Oregon Transmission Project (COTP) Two-Phase Design-Build 525kV Series Capacitor Bank Replacement Project

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Federal
178th Wing Base Microgrid ConstructionThe 178th Wing Base Microgrid Construction project at Springfield-Beckley ANGB in Springfield, Ohio, is a total small business set-aside solicitation under NAICS code 237130 with an estimated value between $7 million and $9 million. The project aims to construct a basewide microgrid to ensure energy resilience for critical 24/7 operations, particularly supporting MQ-9 Reaper unmanned aircraft missions. The base scope includes the installation of two natural gas generators, microgrid controls, paralleling transfer switches, primary isolation switches, building energy meters, and a base energy management system. The solicitation includes two optional components—Option 001 for a PV solar array and Option 002 for a battery energy storage system (BESS)—both of which will be evaluated and potentially exercised at the time of award under FAR 52.217-5. All equipment interfacing with the base’s direct digital controls (DDC) infrastructure must be compatible with Honeywell Niagara 4, as specified in the brand name justification. The contract is a firm-fixed-price award to be made via sealed bidding under FAR 14, with selection based solely on price. Bids must be submitted in hard copy using Standard Form 1442, with an original signature, and electronic or facsimile submissions are prohibited. The period of performance is 450 calendar days from the Notice to Proceed, with work restricted to weekdays between 7:00 a.m. and 4:30 p.m. unless otherwise approved. Contractors must comply with all DoD security requirements, including HSPD-12 and FIPS PUB 201, and obtain necessary clearance prior to commencing work. Performance and payment bonds at 100% of the contract value are required, and all final payments are contingent upon satisfactory completion of work, submission of a properly certified invoice, and a release of claims. Invoicing must be conducted electronically via Wide Area Workflow (WAWF), with a preliminary review submitted in duplicate to the Contracting Office in Springfield, Ohio, prior to electronic submission, and payments will be made via electronic funds transfer in accordance with FAR 52.232-5 and FAR 52.232-27. The contractor is responsible for all labor, materials, equipment, permits, insurance, and supervision, and must ensure compliance with Ohio building codes, manufacturer specifications, and the Interoper
W7NU Uspfo Activity Ohang 178

POSTED

about 13 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237130
New
SLED
Request for Sealed Bids -CNIT Fiber Distribution Relocation (Cherokee County)The Cherokee Nation is inviting qualified contractors to submit sealed bids for the relocation of its fiber distribution infrastructure from the Keeler building to a new data center within the central office building in Tahlequah, Oklahoma, located in Cherokee County. The solicitation, numbered Procurement #164796, was posted on July 24, 2026, with responses due by August 19, 2026. This effort is part of an initiative to modernize and consolidate the Nation’s IT infrastructure, ensuring improved network reliability and operational efficiency. All work must be performed at the specified location in Cherokee County, Oklahoma, and contractors are expected to have the technical expertise and experience to handle sensitive telecommunications relocation projects without disrupting critical services. Pam Jumper serves as the primary point of contact for this procurement, reachable via phone at 918-453-5000 or email at pam-jumper@cherokee.org. Bidders are directed to the official Cherokee Nation bids portal for full solicitation details and submission guidelines. There is no set-aside designation specified for this opportunity, meaning it is open to all eligible contractors regardless of business size or classification. The Cherokee Nation, acting as a state, local, and tribal government entity, is seeking professional and timely execution of the fiber infrastructure move to support its long-term digital infrastructure goals.
Cherokee Nation

POSTED

about 19 hours ago

DEADLINE

in 25 days
View Details
NAICS: 237130
New
SLED
FY26-DDOT-IPMA-DC PLUG Feeder 15021- ConstructionThe District of Columbia Department of Transportation is forecasting a construction project aimed at undergrounding PEPCO’s power lines and installing new infrastructure to serve residents across the District. The project, designated as FY26-DDOT-IPMA-DC PLUG Feeder 15021, is scheduled to be posted on July 23, 2026, and represents a broader initiative to modernize the city’s utility network by relocating above-ground electrical facilities underground. This effort is intended to enhance public safety, improve urban aesthetics, and increase the resilience of the power grid against weather-related disruptions. The work will involve significant civil and electrical construction activities, including trenching, conduit installation, transformer placement, and coordination with existing underground utilities, all within publicly accessible areas serviced by PEPCO. The project falls under the jurisdiction of DDOT, with performance expected to occur throughout the District of Columbia, though specific locations have not been detailed. It is classified as a forecasted opportunity, indicating it is in the early planning stages and may be subject to changes in scope, budget, or timeline before formal solicitation. There is no current information regarding set-aside provisions, NAICS code classification, or designated point of contact, suggesting that further details will be released in subsequent updates. Stakeholders and potential contractors should monitor the official DDOT contracts portal for official solicitations, which will include requirements for qualifications, bonding, insurance, and compliance with local and federal construction regulations.
Transportation (DDOT)

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 237130
New
SLED
FY26-DDOT-IPMA-DC PLUG Feeder 467 - ConstructionThe contract pertains to the construction of underground infrastructure to relocate PEPCO’s power lines and install new facilities aimed at enhancing electrical service for residents in the District of Columbia. This initiative is part of a broader effort to modernize the city’s utility network by moving overhead lines underground, which improves safety, aesthetics, and resilience against weather-related outages. The project is slated under the Fiscal Year 2026 timeline and is managed by the District Department of Transportation, reflecting its alignment with urban infrastructure planning and public service improvement goals. The work will involve significant civil and electrical construction activities, including trenching, conduit installation, transformer placement, and connection to existing grid systems, all designed to ensure reliable power delivery to local communities. Although specific details such as funding amount, duration, or contractor eligibility criteria are not disclosed, the forecast listing indicates this is a planned procurement opportunity targeted for future bidding. The location of performance is within the District, suggesting the scope covers multiple neighborhoods served by Feeder 467, with potential impacts on traffic, pedestrian access, and local utility services during construction phases. The contract is categorized as a forecast, meaning it serves as an early notice to potential vendors and contractors, allowing them time to prepare proposals and align resources ahead of a formal solicitation. This initiative underscores the District’s commitment to upgrading critical infrastructure and promoting equitable access to modern utility services across its residential areas.
Transportation (DDOT)

POSTED

1 day ago

DEADLINE

N/A
View Details

More opportunities from Department Of Energy → Western Sierra Nevada Region

Same awarding agency

NAICS: 811310
New
Federal
Tracy Substation Transformer RefurbishmentThe U.S. Department of Energy, through its Western Sierra Nevada Region, has issued a solicitation for the refurbishment of the KT2A transformer at the Tracy Substation. The contract, identified by solicitation number 89503326QWA000410, is set for a response deadline of August 3, 2026, and is classified under NAICS code 811310, indicating it pertains to electrical equipment repair and maintenance. The solicitation is designated for small business set-aside, emphasizing support for small businesses to compete for this federal opportunity. Work will be performed at the Tracy Substation, though the precise location details are not specified in the provided data. The contracting officer for this procurement is Tyson Thomas, who can be reached via email at tthomas@wapa.gov. The contract originates from the Department of Energy’s office located in Folsom, California, with a postal code of 95630-4710. Interested parties must submit proposals through the FedConnect portal using the provided link before the stated deadline. All technical, logistical, and compliance requirements for transformer refurbishment will be detailed in the full solicitation document accessible via the FedConnect site, and bidders are expected to adhere to federal procurement standards and small business eligibility criteria.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

about 21 hours ago

DEADLINE

in 10 days
View Details
NAICS: 237130
Federal
Electrical Installation & Field ConstructionThe contract under the title Electrical Installation & Field Construction involves the onsite installation of capacitor banks as part of transmission infrastructure upgrades, to be performed during scheduled outages. Scope of work includes structural assembly of the capacitor banks, installation of buswork, grounding systems, control wiring, and seamless integration with existing transmission equipment. The work requires specialized electrical and field construction expertise to ensure safety, reliability, and compliance with grid operational standards. All tasks must be executed within tight outage windows and coordinated with utility operations to minimize disruption. The solicitation is classified as a subcontract under NAICS code 237130 for Electric Power Transmission and Distribution Construction, issued by the Department of Energy through its Western Sierra Nevada Region. The opportunity was posted on July 1, 2026, with proposals due by September 1, 2026. The place of performance and specific location details are not provided, indicating the work may occur across multiple transmission sites within the region. Bidders must demonstrate capability in high-voltage electrical construction, outage planning, and experience with utility-scale capacitor installations. The contract is not subject to any set-aside provisions and will be awarded through standard federal subcontracting procedures via the FedConnect portal.
Power and Communication Line and Related Structures Construction

POSTED

24 days ago

DEADLINE

in about 1 month
View Details
NAICS: 335312
Federal
High-Voltage Capacitor Bank Procurement & SupplyThe contract entails the supply of OEM-manufactured 525kV series capacitor banks with complete component integration, ensuring all subsystems are unified and function as a single coordinated unit under rigorous engineering standards. Each unit must be accompanied by certified insulating liquid that is verified to be non-PCB, meeting environmental and safety regulations without exception. Comprehensive factory test reports are required for every assembly, validating performance, insulation integrity, and operational reliability under rated conditions prior to shipment. These capacitor banks are critical for high-voltage transmission applications and must be produced to exacting technical specifications without compromise. The subcontract is issued under the NAICS code 335312 for electrical equipment manufacturing and is administered by the Department of Energy through its Western Sierra Nevada Region. The solicitation was posted on July 1, 2026, with a firm response deadline of September 1, 2026. The place of performance and specific delivery location are not detailed in the provided data, though the equipment will be deployed within federal transmission infrastructure managed by the Department of Energy. All submissions must demonstrate full compliance with technical, certification, and documentation requirements, and bidders are expected to have proven experience in high-voltage power capacitor systems, with an emphasis on quality control and traceability throughout the manufacturing process.
Motor and Generator Manufacturing

POSTED

24 days ago

DEADLINE

in about 1 month
View Details