Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Substation Engineering & Design Services

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Substation Engineering and Design Services with the Department of Energy's Western Sierra Nevada Region involves providing full engineering design for integrating new series capacitor banks for prime contractors on WAPA substation projects. The scope of work includes calculating loading requirements for existing platforms and foundations, performing seismic and wind load analysis, and creating detailed integration drawings. The selected provider must hold a Professional Engineer license and ensure all work complies with Section CC Table A seismic requirements. The final deliverables consist of a comprehensive engineering design package and structural feasibility reports. The response deadline for this opportunity is September 30, 2026.

General Info

Substation engineering design for WAPA capacitor banks; PE license required; deadline September 30, 2026.

Agency

Department Of Energy → Western Sierra Nevada RegionView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

This scope was carved out of Spec. No. 1108.

The full solicitation package (16 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

COTP Series Capacitor Two-Phase Design Build

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Western Sierra Nevada Region
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Energy → Western Sierra Nevada Region
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs full engineering design for the integration of new series capacitor banks for prime contractors on WAPA substation projects. Calculates loading requirements for existing platforms and foundations, performs seismic and wind load analysis, and creates integration drawings. Requires Professional Engineer (PE) license and compliance with Section CC Table A seismic requirements. Delivers final engineering design package and structural feasibility reports.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is soliciting sub-quotes for the Scattergood GS Units 1&2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as utility locating, geotechnical and geophysical investigations, BIM/3D modeling, and environmental assessment and permitting support. The solicitation specifically encourages participation from certified Disadvantaged Business Enterprises, including MBE, WBE, and OBE firms. Interested parties must contact Kiewit to receive an Invitation to Bid through the Building Connected electronic system, with a final bid deadline of September 11, 2026. To be considered responsive, bidders must hold a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, though Kiewit will reimburse the associated bond premiums. Additionally, Kiewit emphasizes the importance of labor harmony, as they are signatories to several collective bargaining agreements. Detailed plans and specifications are available for review at Kiewit's Costa Mesa, California office, and further inquiries regarding the project schedule or requirements should be directed to Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 7 hours ago

DEADLINE

in 20 days
View Details

More opportunities from Department Of Energy → Western Sierra Nevada Region

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS