Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on September 5, 2003. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

51 -- Electronic Stencil Machine

Closed
F1EMCC32310100Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

56 CONS/LGCA14100 W. EAGLE ST. 85309, AZ

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4887 56 Cons Cc
Contacts2 people available
OfficeLUKE AFB, AZ, 85309-1217, USA
Office AddressLUKE AFB, AZ, 85309-1217, USA
Contacts
Alex P SkarlatosContract Specialist
Bernard K ClemensSmall Business Advisor

Full Description

Show more
This is a request for quote. Funds are currently not available, but may become available on or before 30 Sep 2003. The US Government reserves the right to award for more or less than the quantity estimated based on availability of funds. Delivery shall be FOB destination. Required delivery: 30 days ARO. Item requested: SC-3 ELECTRONIC STENCIL MACHINE W/CRADLE, 1 EA; AND 60 DEGREE TUNGSTEN CARBIDE SCISSORS, 5 EA(OR EQUAL). CHARACTERISTICS: CUT CHARACTERS 1/8 INCH AND UP. UNIQUE KNIFE SAVING TECHNOLOGY, EXTRAWIDE 29 INCH BED, EASY TO USE KEYPAD, CUTS .010 STENCIL BOARD, HEAVY DUTY POLYESTER, MAGNETIC VINYL, .008 WHITE POLYETHYLENE FIL (ULTRA CUT). STENCIL-CAD STANDARD 5.0 SOFTWARE PROVIDES HUNDREDS OF FONTS, INTERNATIONAL SHIPPING SYMBOLS, MILITARY GOVERNMENT AND CYRILLIC FONTS AND SEQUENTIAL NUMBERING. IMPORTS FILES FROM MANY WINDOWS BASED PROGRAMS INCLUDING COREL DRAW. Basis of award: Award will be made to the lowest-price Offeror, best demonstrating their ability to satisfy the technical capabilities of the items specified. Offerors of any equal must provide descriptive literature to this office for evaluation. To be eligible to compete, contractors must be CCR registered. Registration can be established on the internet at www.ccr.gov.

More opportunities from Department Of Defense → FA4887 56 Cons Cc

Same awarding agency

NAICS: 335921
New
Federal
56 CS FOC to Flightline and Wx Equipment, Luke AFB
Solicitation # F3YCFA6173AC01
This firm-fixed-price contract requires a certified telecommunications contractor to engineer, furnish, install, and test new 12-strand single-mode fiber optic cable at Luke Air Force Base, Arizona. The project involves connecting several critical facilities, including Radar Approach Control, the Air Traffic Control Tower, Base Operations, the Command Post, and various flightline and meteorological equipment such as Localizers, Glide Slopes, and TACAN. Installation will utilize a combination of existing manhole/handhole duct systems and direct burial. The contractor is responsible for providing all new, rust-proof, and corrosion-resistant materials, tools, and labor, as no government-furnished equipment will be provided. The procurement is a 100% set-aside for Women-Owned Small Businesses under NAICS 335921. Award will be granted to the responsible vendor with the lowest priced, technically acceptable quote, based on evaluations of design, quality control plans, and performance history via the Supplier Performance Risk System. The period of performance is not to exceed 180 calendar days, with a requested delivery date of July 1, 2027. Contractors must comply with strict base access security protocols, environmental regulations regarding hazardous materials and lead-based paint, and technical standards including TIA 526-7 for fiber optic testing. All payment requests must be processed electronically through the Wide Area WorkFlow system.
Fiber Optic Cable Manufacturing

POSTED

1 day ago

DEADLINE

in 20 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS