Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on January 6, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

51--PNEUMATIC BAG,LIFTI

Closed
N0038323QP054Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333998
New
International
Selective Laser Sintering (SLS) 3D Printer
Solicitation # W6399-27-SS20/A
The Department of National Defence is seeking the acquisition of one Selective Laser Sintering (SLS) 3D printer, with options to procure up to two additional units, for high-performance manufacturing, prototyping, and tooling. The equipment must be new, off-the-shelf hardware capable of processing engineering-grade thermoplastics such as Polyamide 11, Polyamide 12, Polypropylene, and TPU, with a minimum build volume of 150 x 150 x 300 mm. The requirement includes software licenses for at least three years that can function without an internet connection and must meet North American power standards of 120V at 60Hz. All units and associated consumables must be delivered and installed at Canadian Forces Base Petawawa, Ontario, no later than March 31, 2027, under Delivered Duty Paid (DDP) Incoterms 2020. This is a fixed-price defence contract governed by the Defence Production Act. Award will be based on the lowest evaluated price among offers that meet all mandatory technical criteria specified in the solicitation. Proposals must include an offer submission form, an offeror declaration form, and a financial proposal inclusive of all customs duties and taxes. The contractor is required to adhere to environmentally preferable packaging standards, ensuring materials are reusable, returnable, or recyclable. Additionally, the contractor must certify that the work is not produced using forced labour, as the government maintains the right to terminate the contract for defaults related to human trafficking or forced labour violations.
Department of National Defence

POSTED

1 day ago

DEADLINE

in 13 days
NAICS: 333998
New
International
Six-column Mobile Lift System
Solicitation # W6897-27-0514
The Department of National Defence is soliciting offers for the supply, delivery, installation, commissioning, and virtual training of a new six-column mobile vehicle lift system for CFB Suffield in Alberta. The system must be current production equipment capable of lifting vehicles weighing at least 103,000 to 108,000 lbs. Key technical requirements include CSA or cUL certification, compatibility with standard Canadian electrical power systems, and the inclusion of rechargeable batteries and charging accessories. Essential safety features must include emergency stop controls on each column, automatic mechanical locking devices, overload protection, a safety stop system for obstructions, and emergency lowering capabilities during power failure. This fixed-price contract is open to Canadian suppliers and those from applicable trading partners, with an award based on the lowest evaluated price among compliant offers. Deliverables must be shipped Delivered Duty Paid to Building 163 at CFB Suffield, with a requested delivery date of January 2027. The successful contractor must provide virtual training via platforms such as Microsoft Teams, Zoom, or Cisco Webex within five business days of delivery. Additionally, the procurement mandates environmentally preferable packaging that is reusable, returnable, or recyclable. Compliance is strictly monitored, including prohibitions against forced labour and human trafficking in the supply chain.
Department of National Defence

POSTED

1 day ago

DEADLINE

in 7 days
NAICS: 333998
New
International
High Resolution, Lithographic 3D Printing System for Metals, Ceramics and Polymers
Solicitation # 25-58227 B
The National Research Council Canada (NRC) is seeking a high resolution, lithographic 3D printing system for metals, ceramics, and polymers to support research activities at the Advanced Materials Research Facility in Mississauga, Ontario. The required system must utilize slurry feedstock and be capable of printing individual or multi-material configurations, supporting at least two distinct materials within a single layer or between layers. Key technical specifications include a minimum build volume of 70 x 40 x 150 mm and an integrated, automated, programmable material-change cleaning system. All electrical equipment must be certified under the Canadian Electrical Code, Part 1. The system must be delivered and installed on-site within five months of the contract award. This open tender, solicitation number 25-58227 B, is subject to various international trade agreements and the NRC Integrity Regime. The contract will be awarded to the responsive bidder offering the lowest evaluated price, provided they meet all mandatory technical criteria. Proposals must be submitted electronically as two separate attachments, a Technical Offer and a Financial Offer, to the NRC Bid Receiving Unit by October 13, 2026, at 2:00 PM EDT. Bidders must adhere to strict submission guidelines, including a 10MB email limit and a prohibition on zip files. Payment will be made as a fixed lump sum in CAD upon successful inspection and acceptance by Canada.
National Research Council of Canada

POSTED

1 day ago

DEADLINE

in 9 days

General Info

NAICS

333998 - All Other Miscellaneous General Purpose Machinery Manufacturing

Place of Performance

PA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support
Contacts1 person available
OfficePHILADELPHIA, PA, 19111-5098, USA
Office AddressPHILADELPHIA, PA, 19111-5098, USA

Full Description

Show more
CONTACT INFORMATION|4|TBD|TBD|TBD|TBD| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|x||||||||||||x|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT COMBO TYPE|Source/source|TBD|NOO383|TBD|TBD|See Schedule|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 Months|60 days after discovery of defect||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3|||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|332216|750|||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| THIS SOLICITATION IS FOR THE FURNISHING OF : NSN: 1RW 5120 002632962 SX PN: 48C7171 QUANTITY: 10 EA PLEASE SUBMIT QUOTE VIA EMAIL TO BRANDON.J.HEALY.MIL@US.NAVY.MIL BY THE DUE DATE SPECIFIED ON PAGE 1, BLOCK 10. THIS CONTRACT IS SET ASIDE FOR SMALL BUSINESS THESE ITEMS REQUIRE GOVERNMENT SOURCE APPROVAL PRIOR TO AWARD. IF YOU ARE NOT AN APPROVED SOURCE, YOU MUST SUBMIT, TOGETHER WITH YOUR PROPOSAL, THE INFORMATION DETAILED IN THE NAVSUP WSS SOURCE APPROVAL BROCHURE WHICH CAN BE OBTAINED ONLINE AT https://www.navsup.navy.mil/public/navsup/wss/business_opps/ UNDER "COMMODITIES." OFFERS RECEIVED WHICH FAIL TO PROVIDE ALL DATA REQUIRED BY THE SOURCE APPROVAL BROCHURE WILL NOT BE CONSIDERED FOR AWARD UNDER THIS SOLICITATION. PLEASE NOTE, IF EVALUATION OF A SOURCE APPROVAL REQUEST SUBMITTED HEREUNDER CANNOT BE PROCESSED IN TIME AND / OR APPROVAL REQUIREMENTS PRECLUDE THE ABILITY TO OBTAIN SUBJECT ITEMS IN TIME TO MEET GOVERNMENT REQUIREMENTS, AWARD OF REQUIREMENT MAY BE CONTINUED BASED ON FLEET SUPPORT NEEDS. 1. SCOPE 1.1 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAVAIR; drawing number ( ;TBD; ) ;48C7171; , Revision ;Latest; and all details and specifications referenced therein. 1.2 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE 4.1 The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below 4.1.1 Dimensional test (special) ;Nominal tolerances; 4.1.2 Requirements of: ;Applicable drawings; 4.1.3 Form ;Applies; 4.1.4 Fit ;Applies; 4.1.5 Function ;Applies; 4.1.6 Compliance with drawing ( ;48C7171; ) ;N/A; , Revision ;N/A; and specifications referenced therein. 4.2 In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements 4.3 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection 4.4 The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing. 4.4.1 The QAR shall be present to witness all First Article Testing. 4.4.2 The following additional personnel shall witness the First Article Testing: ; ; 4.5 Disposition of FAT samples 4.5.1 ; ; Sample(s) may be destroyed during testing. 4.5.2 ;Applies; Unless otherwise provided for in the contract, sample(s) shall remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s) have inspection approval of the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment. 4.6 Test Sample Coating Instructions 4.6.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required. 4.7 Notice to Government of Testing at the contractors facility. 4.7.1 FAR 52.209-3 applies (A) The contractor shall present ;One; ; unit(s) of the following CAGE( ;TBD; ; ), Part Number ;48C7171; ; , Revision ;N/A; ; as specified in this contract. At least fourteen (14) calendar days before the beginning of the First Article testing, the contractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests. (B) The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;PCO; ; The contractor shall mark the report "First Article Test Report" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements. (C) Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional approval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for disapproval. (D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First Article or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified in paragraph B above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests. (E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract. (F) Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for acceptance. (G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay. (H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be allocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair of the First Article during any First Article test. (I) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article. (J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on Form DD1222 (2 copies) which shall be forwarded with the test report. Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test report. 4.8 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate) (A) Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that: (I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and (II) the production location to be used for this requirement is the same as used for the previous production run. Additionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that: (I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer, and (II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause. (NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.) (B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and one that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First Article Approval Requirements (C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the government notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule he offers to the government. Offeror's Proposed Alternate Delivery Schedule (Based on waiver of First Article Approval Requirements) Within Days: Item No. _____________ Quantity:_______ After Date of Contract:_________ 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

More opportunities from Department Of Defense → Navsup Weapon Systems Support

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS