Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Veterans Affairs was posted on June 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

523-25-003 Bulk Oxygen Corrections

Closed
36C24126Q0398Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for the comprehensive interior modernization of Building 262, with potential options for Buildings 261 and 263. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, and updating interior surfaces through repainting and the removal of vinyl wall coverings. Technical upgrades involve installing raised flooring, updating electrical distribution with simple dimming controls and new ceiling fans, replacing variable air volume systems, and correcting plumbing deficiencies. The contractor is also responsible for providing new signage and managing the movement and protection of all loose furniture. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Award will be determined using the best suited negotiate methodology, evaluating price alongside past performance and corporate relevant experience, with minimum ratings of Satisfactory and Acceptable required, respectively. The contractor must provide performance and payment bonds equal to 100 percent of the contract price and adhere to strict quality control, safety, and ADA accessibility standards. Proposals must be submitted electronically to the Contracting Officer by November 9, 2026, and must include a detailed bid schedule in Excel and technical documentation in PDF format.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project is estimated between 10 million and 25 million dollars with a performance period of 730 days after award. The comprehensive scope of work includes selective demolition, building envelope repairs, new roofing with a 20-year warranty, and exterior wall system updates. Interior improvements consist of reconfiguration, new finishes, epoxy mortar flooring, and the installation of a full NFPA-compliant fire suppression system. Infrastructure upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project requires site improvements including paving removal and replacement, drainage upgrades, and hazardous materials abatement. The contract is divided into two primary exhibit line items: ELIN 0001 for building renovation and ELIN 0002 for paving work. Award will be based on the lowest price, and bidders must propose on all line items to avoid rejection. Performance is subject to the Davis-Bacon Act and Buy American requirements. Bonding requirements are tiered, with proposals exceeding 150,000 dollars requiring bid, payment, and performance bonds. Quality control is managed through a three-phase process requiring a government-accepted QC Plan and adherence to various ASTM and NFPA standards. Administrative requirements include monthly invoicing via Wide Area Work Flow using NAVFAC Form 7300/30 and the submission of detailed monthly work-hour and safety reports.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 26 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, categorized under NAICS code 236220, focuses on basin improvements in California, specifically within the Riverside and Los Angeles project areas. The solicitation is designated as a set-aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation. The response deadline for this opportunity is November 4, 2026. A critical component of this contract is the strict adherence to Disadvantaged Business Enterprise Good Faith Effort (GFE) requirements, which are expanded from State Water Resources Control Board standards to secure project financing. To avoid being deemed non-responsive, bidders must provide proof of specific actions within their bid package, including posting solicitations in an online publication for 30 consecutive calendar days, a print newspaper posting for at least one day, and documented utilization of the Small Business Administration and Minority Business Development Agency. While outreach documentation such as call logs or emails may be submitted up to three business days after the bid closing, failure to meet the primary posting and agency utilization requirements prior to the opening date will result in disqualification.
RT CONTRACTOR CORP

POSTED

about 1 hour ago

DEADLINE

in 6 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes the construction of a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention and utility systems. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and project documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 1 hour ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that affected dormitory rooms, vanity areas, hallways, offices, and conference rooms across the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to Small Businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms. Award will be based on best value, with evaluation weights assigned to price (60 percent), quality (20 percent), past performance (10 percent), and schedule (10 percent). Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submission documents include a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, a W9, a completed vendor questionnaire, and proof of a valid Massachusetts Contractor's License. The contract is subject to the Davis-Bacon Act and specific Executive Orders regarding minimum wage and paid sick leave. Contractors must comply with OSHA safety regulations, NFPA-101 life safety codes, EPA regulations, and all applicable local and state building codes. Insurance requirements include automobile liability coverage of 200,000 dollars per person and 500,000 dollars per occurrence, with Adams and Associates, Inc. named as an additional insured. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 1 hour ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The contract pertains to project 523-25-003, Bulk Oxygen Corrections, requiring the contractor to furnish all labor, equipment, materials, supervision, selective demolition, transportation, testing, and disposal necessary to correct NFPA deficiencies in the existing bulk oxygen storage tanks at three Veterans Affairs Medical Centers: Brockton, Jamaica Plain, and West Roxbury, Massachusetts. The work must be performed in full compliance with the Contract Documents, including detailed Scope of Work, project drawings, technical specifications, wage determinations, and all applicable federal, state, and local codes. The period of performance is 275 calendar days from the issuance of the Notice to Proceed, which includes time for all required submittals and approvals prior to construction initiation. The contract is a Service-Disabled Veteran-Owned Small Business Set-Aside and utilizes a fixed-price construction contract structure governed by FAR and VAAR clauses, including warranty of construction, government property management, and payment procedures specific to VA fixed-price contracts. All materials must be delivered in manufacturer-sealed packaging with legible labeling indicating manufacturer details, product type, batch or run numbers, manufacture dates, instructions, and safety precautions, and any compromised packaging must be returned or disposed of before installation. The contractor is obligated to submit a comprehensive quality control plan for government approval prior to commencement of design or construction, and must adhere to strict inspection and acceptance protocols, including mandatory pre-final and final inspections attended by contractor personnel and the Contracting Officer’s Representative. Payment is to be requested monthly using VA Form 10-6001a or AIA G702/G703 forms, with each request requiring an updated electronic schedule and a detailed listing of all approved schedule changes. The contractor must also provide a preliminary schedule within the timeframe following the Notice to Proceed, followed by a fully developed CPM schedule within 45 days, along with a monthly updated submittal register. Safety is paramount; the contractor bears sole responsibility for jobsite safety, must comply with OSHA 29 CFR Parts 1910 and 1926, enforce EM 385-1-1 standards, ensure a designated competent person is present at all times, conduct pre-task activity hazard analyses, and provide site-specific safety orientation to all employees. Welding must conform to AWS D1.1/D1.1M and D1.3/D1.3M standards, and fire safety, electrical lockout (NFPA 70E), and equipment

General Info

Provide labor, demolition, and materials to correct Bulk Oxygen tanks at three VA Medical Centers.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

West Roxbury, MA, 02132, USA

Set-Aside

SDVOSBC

Documents

31

523-25-003 Civil Details Bulk Oxygen Corrections Drawing

PDF, High priority: read this first14 pages · specifications
High

523-25-003 VABOS Bulk O2 Corrections V2 Specifications

PDF, High priority: read this first287 pages · specifications
High

523A4-22-700 Site Civil Survey Plan - EHRM Infrastructure Upgrades

PDF, High priority: read this first1 page · specifications
High

Amendment 0001 to Solicitation 36C24126Q0398 for Bulk Oxygen Corrections

PDF, High priority: read this first2 pages · amendment
High

Amendment 0002 to Solicitation 36C24126Q0398

DOCX, High priority: read this firstamendment
High

Amendment 0003 to Solicitation 36C24126Q0398 for Bulk Oxygen Corrections

DOCX, High priority: read this firstamendment
High

Brockton VAMC B8 Proposed Location Site Plan

PDF, High priority: read this first1 page · specifications
High

Bulk Oxygen Corrections Earth Moving and Grading Notes VA Project 523-25-003

PDF, High priority: read this first29 pages · specifications
High

Notice of Activity and Use Limitation for 150 South Huntington Avenue, Boston MA

PDF, High priority: read this firstactivity-and-use-limitation
High

S02-S02 Brockton Base Offer Cost Breakdown

XLSX, High priority: read this first4 pages · base-offer-breakdown
High

S02-S02 Jamaica Plains Base Offer Cost Breakdown

XLSX, High priority: read this first4 pages · base-offer-cost-breakdown
High

S02-S02 West Roxbury Base Offer Cost Breakdown

XLSX, High priority: read this first4 pages · offer-breakdown
High

Solicitation 36C24126Q0398 Bulk Oxygen Corrections VISN 1 Construction MATOC

DOCX, High priority: read this first9 pages · rfp
High

SOW 523-25-003 Bulk Oxygen Correction Construction VA Boston Healthcare System

DOCX, High priority: read this first5 pages · sow
High

VA Boston Healthcare System Bulk Oxygen Corrections Specifications V3

PDF, High priority: read this first264 pages · specifications
High

VA Project 523-25-003 Bulk Oxygen Corrections Construction Documents Volume 2

PDF, High priority: read this first8 pages · construction-documents
High

VA Project 523-25-003 Bulk Oxygen Corrections Construction Documents Volume 3

PDF, High priority: read this first8 pages · construction-documents
High

VA Project 523-25-003 Bulk Oxygen Corrections VAMC Brockton Specifications

PDF, High priority: read this first261 pages · specifications
High

VA Project 523-25-003 Bulk Oxygen Corrections VAMC Brockton Specifications

PDF, High priority: read this first260 pages · specifications
High

VA Project 523-25-003 Bulk Oxygen Corrections VAMC Jamaica Plain Specifications V2

PDF, High priority: read this first289 pages · specifications
High

VA Project 523-25-003 VABOS Bulk Oxygen Corrections Specifications V3

PDF, High priority: read this first265 pages · specifications
High

VHA Infection Control Risk Assessment (ICRA) Template

PDF, High priority: read this first9 pages · specifications
High

VHA Infection Control Risk Assessment (ICRA) Template

PDF, High priority: read this first9 pages · specifications
High

VHA Pre-Construction Risk Assessment for Bulk Oxygen Correction 523-25-003

PDF, High priority: read this first5 pages · pcra
High

VHA Pre-Construction Risk Assessment for Bulk Oxygen Correction 523-25-003

PDF, High priority: read this first5 pages · pcra
High

VHA Pre-Construction Risk Assessment (PCRA) for Bulk Oxygen Correction

PDF, High priority: read this first7 pages · pcra
High

Wage Determination MA20260012 for Plymouth County, MA Building Construction

PDF, High priority: read this firstwage-determination
High

523-25-003 Bulk Oxygen Corrections (BK) Site Visit Sign-in

PDF, Low priorityother
Low

AUL Maps - JP

PDF, Low priorityother
Low

523-25-003+Bulk+Oxygen+Corrections_Site+Visit+Sign-in+JP+WX.pdf

PDF

S02-S02-+Wage+Determination+West+Roxbury_Jamaica+Plains.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Jun 17, 2026 to Jun 30, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 241-NETWORK Contract Office 01 (36C241)
Contacts2 people available
OfficeTOGUS, ME, 04330, USA
Office AddressTOGUS, ME, 04330, USA
Contacts
Heather Libiszewski-Gallien

Full Description

Show more

The Contractor shall provide all labor, selective demolition, equipment, material, supervision, and disposal required for project 523-25-003. This work shall include correction of NFPA deficiencies of the existing Bulk O2 storage tanks at the Veterans Affairs Medical Center, Brockton, Massachusetts, Veterans Affairs Medical Center, Jamaica Plain, Massachusetts, and Veterans Affairs Medical Center, West Roxbury, Massachusetts, in accordance with the Contract Documents. The period of performance is 275 calendar days from the issuance of the Notice to Proceed.

More opportunities from Department Of Veterans Affairs → 241-NETWORK Contract Office 01 (36C241)

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS