This Solicitation opportunity from Department Of Defense was posted on October 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
BOLT, MACHINE
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Solicitation SPE4A6-27-T-3828 is a request for quotations issued by the DLA Weapons Support ASC Commodities Division for the procurement of machine bolts under NSN 5306010965596. This is a combined procurement consisting of 263 units for delivery within 801 days, along with specific requirements for production lot testing. The effort is set aside exclusively for Service-Disabled Veteran-Owned Small Businesses certified by the Small Business Administration. Quotes must be submitted electronically via DIBBS by October 21, 2026. The items are designated as Army Identified Critical Safety Items, necessitating strict adherence to quality standards, including compliance with SAE AS9100 or equivalent systems. The contract requires First Article Testing, with reports due within 90 days of the contract date, and mandates a zero-non-conformance acceptance standard. Packaging and marking must comply with MIL-STD-2073-1E and MIL-STD-129. Additionally, the contractor must utilize the Wide Area WorkFlow system for invoicing and adhere to domestic sourcing regulations, including the Buy American Act and the Berry Amendment. Inspection and acceptance will occur at the point of origin.
General Info
Place of Performance
Set-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownSolicitation requirements
16 mandatory22 requirements in 8 areas
- Technical5 · 4 must007
First Article Testing Performance
- Submission4 · 4 must001
Dealer Certification Documentation
Contract notice - Management4 · 2 must012
First Article Shipping Notice
- 19 more requirements, each with its source quote
Read every requirement with its source and proposal context.
Read all 22 requirementsThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Supply of Blind Rivets (NSN 5320-01-644-1175)Open now, due in 8 days
- Socket Head Cap Screw Manufacturing and SupplyOpen now, due in 8 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Combined Synopsis
Deadline has passed
Organization & Contact Information
Full Description
‘OTHER EQUIVALENT' AND PROVIDE DETAILS OF CURRENT DEALER/DISTRIBUTOR
CERTIFICATION AND/OR ACCREDITATION.
Fast Pay does not apply to this solicitation
FIRST ARTICLE APPROVAL – CONTRACTOR TESTING REQUIRED (FAR 52.209-3 and ALT I)
THE CONTRACTOR SHALL TEST 1 UNIT(S) OF LOT/ITEM 5306 / 10965596 AS SPECIFIED IN THIS CONTRACT. PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER AND THE QAR AT LEAST FOURTEEN (14) CALENDAR DAYS PRIOR TO SHIPMENT TO GOVERNMENT FOR FAT, TO ACCOMODATE IN-PROCESS VERIFICATION AND/OR FINAL INSPECTION BY THE QAR. THE CONTRACTOR SHALL SUBMIT THE FIRST ARTICLE TEST REPORT WITHIN 90 CALENDAR DAYS FROM THE DATE OF THIS CONTRACT. NOTIFICATION AND SUBMITTAL ADDRESSES ARE IAW PROCUREMENT NOTE H03. WITHIN 60 CALENDAR DAYS AFTER THE GOVERNMENT RECEIVES THE TEST REPORT, THE CONTRACTING OFFICER SHALL NOTIFY THE CONTRACTOR, IN WRITING, OF THE CONDITIONAL APPROVAL, APPROVAL, OR DISAPPROVAL OF THE FIRST ARTICLE. SEE PROCUREMENT NOTE H03: SUPPLEMENTAL FIRST ARTICLE TESTTING REQUIREMENTS (SEP 2016) FOR ADDITIONAL FAT REQUIREMENTS.
DISPOSITION OF FAT UNITS IAW PARAGRAPH (e) OF FAR 52.209-3 OR 52.209-4.
SPE4A6-27-T-3828
SECTION A
Procurement Note E04: Production Lot Testing – Government (MAY 2020)
(1) The purpose of production lot testing (PLT) is to validate quality conformance of products. PLT is to be completed on the production lot(s) after First Article approval, when a first article is required. The contractor shall price the PLT CLIN to cover the cost of the approved samples that are consumed, destroyed or otherwise rendered unusable during testing.
(2) The contractor shall provide written notice to the contracting officer and the QAR at least fourteen (14) calendar days (or as otherwise specified in the contract) prior to the date when the contractor will present the production lot to the QAR for selection of PLT samples.
(3) The QAR will select 1 samples, at random from the production lot(s) produced. If the quantity stated in the previous sentence equals "ZZ", the contractor should use the appropriate sample size identified within the Technical Data Package or applicable Sample Plan provided by the Government. The contractor will seek approval of the sample size with the QAR.
(4) The contractor shall ship the PLT samples by traceable means to:
RTTC REDSTONE W31P0W REDSTONE ARSENAL REDSTONE TECHNICAL TEST CENTER ATTN: CHARLES EAKES BLDG 4500
REDSTONE ARSENAL AL 35898
Shipment shall be marked “Production lot samples – do not post to stock”, contract and lot number. A copy of the DD250/IRAPT Receiving Report shall be placed on the exterior of the shipping container in accordance with MIL STD 129. Include the following interior documentation: DD Form 1222 and DD250/IRAPT receiving report signed by the QAR, copy of contract/order, copies of test reports showing actual results and tolerances specified in the technical data package, material and process certifications, process operations and inspection method sheets, copies of drawings used to manufacture the PLT sample (proper marking to assert proprietary or other rights to restrict public disclosure is the contractor’s responsibility), documents required under contract deliverables requirements list, a prepaid shipping label or document with the information required to return the PLT samples to the contractor at no cost to the Government.
(5) At time of shipment, copies of the signed DD Form 1222, DD250/IRAPT Receiving Report, transportation tracking information and information for return of the PLT samples shall be provided to the contracting officer. The Government testing time will be 90 test plus 90 NSN/Part Number: 5306-01-096-5596 Quantity: 263 EA Purchase Request: 7018682440QTY: 263 Delivery: 801 days ADO
More opportunities from Department Of Defense → DLA WEAPONS SUPPORT ASC COMMODITIES DIVISION
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
