Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on April 14, 2015. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

54--Single Wall Control/Double Wall Exam Audiometric Test Suite Miami and Pembroke Pines

Awarded
VA24815Q0639Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334510
New
DIBBS
VENTILATOR, VOLUME, PORT
Solicitation # SPE2DS-27-Q-0026
Solicitation SPE2DS-27-Q-0026 is a fixed-price request for quotations issued by DLA Troop Support Medical Supply Chain for the procurement of two portable EMV Plus volume ventilators (NSN 6515-01-586-5898). These units must include an internal battery charger, a 3-liter oxygen reservoir kit, and a military manual. Technical specifications include a weight of approximately 9.5 lbs, an operating voltage range of 100 to 240 VAC and 11 to 33 VDC, and an operating temperature range from -13 to +167 degrees Fahrenheit. This is a Foreign Military Sales requirement for Taiwan, with delivery required within 30 days after receipt of the order and a customer required delivery date of September 29, 2026. The contract mandates strict adherence to medical packaging and marking standards, specifically Medical Marking Standard No. 1, which supersedes MIL-STD-129. Items must be provided in sealed unit containers and commercial exterior shipping containers per MIL-STD-2073-1E. Item Unique Identification (IUID) is required in accordance with MIL-STD-130 and DFARS 252.211-7003. Inspection and acceptance are set at origin, and all invoicing must be processed electronically via Wide Area Workflow as a receiving report and invoice combo, including a Certificate of Conformance. This procurement is not a small business set-aside and incorporates various FAR and DFARS clauses regarding the Buy American Program, cybersecurity reporting, and sustainable products. Quotations are due by November 6, 2026.
MEDICAL SUPPLY CHAIN MD SURG FSF

POSTED

about 18 hours ago

DEADLINE

in 6 days
NAICS: 334510
New
Federal
Electro-Therapeutic Modalities for Pain Management (ETMPM) - Transcutaneous Electrical Nerve Stimulation (TENS) Procurement Program
Solicitation # 36C79126R0011
The Department of Veterans Affairs is soliciting proposals under Solicitation Number 36C79126R0011 to establish multiple single-award, Firm-Fixed-Price, Indefinite Delivery/Indefinite Quantity (IDIQ) base contracts for the Electro-Therapeutic Modalities for Pain Management (ETMPM) and Transcutaneous Electrical Nerve Stimulation (TENS) Procurement Program. This national program provides FDA-cleared electro-therapeutic devices and accessories to VA Medical Centers and Community-Based Outpatient Clinics to support non-opioid pain management. The scope includes portable TENS devices, Interferential Current (IFC) devices, thermal and non-thermal Short-Wave Diathermy devices, and portable Neuromodulation systems for headache disorders, along with associated accessories such as electrodes and lead wires. The procurement utilizes a VA Tiered Set-Aside Evaluation Approach, prioritizing awards sequentially from Tier 1 (SDVOSB), Tier 2 (VOSB), Tier 3 (Other Small Businesses), to Tier 4 (Other-Than-Small Businesses). Evaluation methodologies vary by item: CLINs X001 through X004 are evaluated using the Lowest Price Technically Acceptable (LPTA) method, where price is the deciding factor, while CLIN X005 is evaluated via a Best-Value Tradeoff, weighting technical factors at 60%, price at 25%, and past performance at 15%. Responsive proposals must include a signed SF 1449, a Technical Capability Statement, FDA 510(k) clearance letters, and three past performance documents. Non-manufacturers must provide OEM-issued Authorized Distributor Letters. Mandatory certifications include the Buy American Certificate for small businesses (Tiers 1-3) and the Trade Agreements Certificate for large businesses (Tier 4), as well as the Limitations on Subcontracting certification. All offerors must submit required product samples to the Denver Logistics Service facility. Following several amendments, the final deadline for all proposal documentation and product samples is November 2, 2026, at 12:00 PM CDT.
Commodities & Services Acquisition Service (36C791)

POSTED

about 23 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

This contract concerns the installation of single wall control and double wall exam audiometric test suites at VA sites in Miami and Pembroke Pines. For the Miami location, the vendor is responsible for providing a wheelchair ramp and handrail. The government will handle the removal and reinstallation of ceiling tiles, as well as the removal or rerouting of obstructing walls, ductwork, and sprinkler pipes to ensure proper clearance. The government will also provide necessary utility lines and connections, while the vendor must ensure the sound booth includes pre-drilled holes and openings for these services. At the Pembroke Pines site, the vendor is tasked with the dismantling and legal disposal of an existing sound booth. Because this is a leased facility, the government will coordinate utility connections and electrical corrections with the building owner based on specifications provided by the vendor. To minimize disruption to patient care, all installation and removal services at this location must be performed after hours and on weekends. The government will coordinate site access and storage space for materials at both locations.

General Info

Agency

N/A

Contract Value

$148,768

NAICS

334510 - Electromedical and Electrotherapeutic Apparatus Manufacturing

Place of Performance

FL, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Response deadline changed from Feb 27, 2015 to Mar 13, 2015. The notice title changed. The notice description changed.

Notice updated

Response deadline changed from Mar 13, 2015 to Mar 20, 2015. The notice title changed. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
ContactsNo contacts available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
CONTINUATION PAGE Questions and Answers during Site Visit for Miami Site Miami: 1) During the site visit it became aware a wheel chair ramp is required with possible hand rail. Is this the responsibility of the Vendor or the VA supply the ramp? It is the responsibility of the vendor to provide. 2) The ceiling is 7'10" floor to ceiling tile. Double walled sound booth will exceed this height. Thus the grid and tiles would need removal before install. The Government will remove the grid and ceiling tiles and reinstall upon installation of the booths. 3) Above the ceiling tile there are several items of concern for installation. Some of these are shown on page 7 of the request. The 1st drawing on the left hand side of the page shows an "existing partial wall in ceiling". In the 3rd and 4th drawing from the left show duct work, sprinkler pipe also at heights of concern. Not shown is a conduit running across the room at about the middle of room near double doors. All of these items are below the minimum clearance needed to install the sound room. These would need removal or height adjustment before install. Partial boarded wall will be removed by Government, as necessary, to provide sufficient access for proper installation. Sprinkler pipe ductwork above ceiling will be removed or rerouted to provide clearance for the sound booth. 4) HVAC, electrical, sprinklers, fire strobes, phone, network/data and other connections to the sound-room are responsibility of VA or Vendor? Typically these are the responsibility of the host facility. Government will provide necessary lines and ducts and make connections. Sound booth should have pre-drilled holes for two sprinklers, pre-cut opening for the supply and return air grills and network/data, fire strobe, electrical connections. 5) The measurements (Miami- Site) in the first drawing on page 7 are significantly different from the measurements I made on site visit. I measured 26' 5" X 14' 3". This does not take in account for the column box on back wall. The Government accepts your measurements as stated. 6) Available space to unload and store panels needed to install sound booth near installation site due to weight of material would be required. The Government will provide space to unload and store panels near the installation site. Questions and Answers during Site Visit for Pembroke Pines For Pembroke: 1) There is an existing sound booth with a VA property tag. The removal to clear space for the new sound-room is the responsibility of VA or Vendor? Government will process necessary paperwork for the disposal of the sound booth. Vendor to properly dismantle, remove and dispose of the existing sound booth. 2) If Vendor is responsible for sound booth removal, what are the vendors requirements of the property once disassembled? Is it to be placed in storage, disposal or leave on site for VA disposal? If it is to be delivered to another location what is the approximate distance. It is the responsibility of the vendor to dispose of the booths in accordance with applicable Federal, State and Local laws and regulations. 3) HVAC, electrical, sprinklers, fire strobes, phone, network/data and other connections to the sound booth are responsibility of VA or Vendor? These would be for removal on existing sound booth as well. Typically these are the responsibility of the host facility. The Government will request a proposal to address this item as it is a leased facility. Vendor shall submit specs for required utilities and connections. 4) Available space to unload and store panels needed to install sound booth near installation site due to weight of material would be required. Government will coordinate with building owner for proper site access and storage space. Vendor to provide schedule in advance to Government COR. 5) Due to non-audiology offices located near the current booth location and possible patient traffic how will that interact with un-install old booth and install new. Vendor shall provide services after hours and weekend to minimize impact on patient care activities. 6) Electrical is wired to the wrong circuit breaker box currently at the facility. How will this be handled? The Government will coordinate with the building owner to correct wiring.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS