56--Sole Source Announcement - Vehicle Security Gate Replacement

Active
W68MD950912260Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The USACE Seattle District plans to award a sole source, firm fixed price contract to Ideal MFG, Inc. of Billings, Montana, using FY15 Operations and Maintenance funds, to replace a damaged vehicle security gate at the entrance to the Libby Dam Project. The existing gate was compromised by a delivery truck accident, severely impacting the security and safety of the dam's infrastructure, employees, contractors, and visitors. Due to the gate’s crucial role as the primary access point, a direct replacement is necessary to ensure structural integrity, reliability, and to maintain the existing power and communication systems without the need for costly and time-consuming redesign or installation work. This acquisition is justified under authority 41 U.S.C. 1903 and FAR 13.106-1(b), which allows contracting from a single source when only one supplier is reasonably available. Ideal MFG originally supplied the gate and can provide a like-for-like replacement that fits the existing footprint and system requirements, minimizing downtime and security risks. Although this is not a request for competitive quotations, the government will consider any expressions of interest or capability received by the specified deadline via email, but it retains sole discretion on whether to pursue a competitive procurement in the future. No solicitation package will be issued, and inquiries will not be accepted by phone.

General Info

USACE awards sole source contract to Ideal MFG for Libby Dam gate replacement, ensuring security.

NAICS

332323 - Ornamental and Architectural Metal Work Manufacturing

Place of Performance

WA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

special-notice

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Seattle
ContactsNo contacts available
OfficeSEATTLE, WA, 98134-2329, USA
Office AddressSEATTLE, WA, 98134-2329, USA
ContactsNo contact information available

Full Description

Show more
1. Introduction The USACE Seattle District intends to award a sole source contract to Ideal MFG, Inc., Billings, MT. 2. Description of Services This is a new contract requirement for a Firm Fixed Price Contracting using FY15 O&M funds to purchase a replacement for a vehicle security gate at the entrance to Libby Dam. The existing gate was damaged by a delivery truck driver and poses a significant security risk to the infrastructure at the Libby Dam Project. This action is for a one time contract. The NAICS code is 332323. 3. Authority 41 U.S.C. 1903 and FAR 13.106-1(b) 4. Reasons for Sole Source Pursuant to FAR 13.106-1(b)(1)(i) quote mark Contracting Officers may solicit from one source if the contracting officer determines that the circumstances of the contract action deem only one source reasonably available (e.g., urgency, exclusive licensing agreements, brand name or industrial mobilization.) quote mark The Front Entry Gate at Libby Dam is the primary means of access for the employees, contractors, and for deliveries to the Libby Dam Project. The gate was significantly damaged on 3/17/2015. The gate was temporarily repaired on 3/18/2015 but the structural integrity of the gate and the reliability is not acceptable. The identified contractor supplied the original gate and provided a quote for the direct replacement of the gate on 3/30/2015. The physical security at Libby Dam is at risk due to the damage on the gate structure. The entry and egress safety of the employees, visitors, and contractors at Libby Dam is questionable as long as the gate continues to operate in the present condition. The identified contractor can provide an identical direct replacement for a gate system that will fit into the existing footprint, use the existing power requirements, and communicate using the existing communication system. Using an alternate system would require a complete redesign of the system, cutting/removing/replacing concrete, installing new anchorage systems, and commissioning services. A direct replacement is necessary to minimize the amount of time required to provide a secure and reliable front entry gate system. 5. No solicitation package will be issued. This Notice of Intent is not a request for competitive quotations; however, interested persons may identify their interest and capability to respond to this requirement. The Government will consider responses received by 2:00 PM Pacific Time on 4 May 2015. Inquiries will only be accepted via email to contact@example.gov. No telephone requests will be honored. A determination by the Government not to compete the proposed acquisition based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement in the future.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Defense → W071 Endist Seattle

Same awarding agency

NAICS: 236220
New
Federal
Design and construct an Air Traffic Control Tower at Mountain Home Air Force Base ID
Solicitation # W912DW27R1BWMSS
The U.S. Army Corps of Engineers, Seattle District, is conducting market research via a sources sought notice for the design and construction of an Air Traffic Control Tower at Mountain Home Air Force Base in Idaho. The project has a budgeted amount of 32 million dollars and an estimated period of performance of 730 calendar days. The facility must include a control cab accommodating at least six controller stations and five trainers, as well as support spaces such as a simulator room, offices, administrative areas, training and break rooms, and electronic equipment rooms. The government intends to utilize a Progressive Design Build approach with Other Transaction Authority, employing a qualifications-based selection process. This will involve an initial screening to shortlist three firms, followed by interactive pitch meetings to evaluate technical approaches and collaborative capabilities. The procurement will be split into two phases: Phase 1 focusing on the design agreement and Phase 2 focusing on final design and construction under a Guaranteed Maximum Price. Interested firms must submit a capabilities package of no more than 10 pages, including CAGE codes, UEI numbers, and bonding information, to the designated points of contact by the specified deadline.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 14 days
View Details
NAICS: 236220
New
Federal
Joint Base Lewis McChord (JBLM) Multi Domain Task Force (MDTF) Buildings (BLDGs) 3221 and 3222
Solicitation # W912DW27RA017
The USACE Seattle District is conducting market research via a special notice and survey to determine the feasibility of a Project Labor Agreement for the conversion of two barracks buildings, known as the Hammer Heads, into operational facilities for three tier levels of command at Joint Base Lewis McChord, Washington. This project, identified as Buildings 3221-3222 for the Multi Domain Task Force, has an estimated construction magnitude between 40 million and 70 million dollars and an expected duration of 730 calendar days. The effort is currently a small business set-aside. The scope of work involves extensive demolition and renovation, including hazardous material and debris abatement in crawl spaces, the removal of approximately 75 percent of the exterior envelope and interior walls, and the removal of 90 percent of existing mechanical and electrical systems. Required new work includes the installation of a new exterior envelope, updated mechanical and electrical systems, a new Thermoplastic Polyolefin roof system, and exterior painting. The project will also require coordination of new utility connections and management of shared construction boundaries with adjacent projects. This current notice is for survey purposes only and does not constitute a formal solicitation for proposals.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 14 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS