Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on October 12, 2006. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

56 -- To built-up roof system on building 2 and 3.

Awarded
011-06Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236210
New
Federal
F-15EX 8-Bay Maintenance Hangar Complex-Industry Day
Solicitation # W50S8527H1CU0
The National Guard Bureau is seeking market intelligence for the construction of an aircraft maintenance hangar complex at Selfridge Air National Guard Base in Harrison Township, Michigan. This project supports 21 Primary Aircraft Authorization F-15 EX aircraft and is estimated to have a magnitude between 150 million and 200 million dollars. The scope includes the demolition of buildings 3, 5, 117, and 120, with new parking constructed in the footprints of buildings 117 and 120. The construction may be executed in three phases: Hangar 1, a 2-bay corrosion control and fuel cell hangar; Hangar 2, a 4-bay maintenance hangar; and Hangar 6, a 2-bay munitions and training facility. The project also requires necessary utility and infrastructure upgrades. The government is considering a fixed-price agreement utilizing an Other Transaction Agreement under the authority of 10 U.S.C. 2808a, with funding potentially provided in annual phases of approximately one-third of the total cost. Technical requirements include compliance with DoD antiterrorism and force protection standards, adherence to Air Force and base design standards, and specialized foundations to meet flood plain requirements. Design is anticipated to be 100 percent complete by early 2027. This notice is for planning purposes only and is not a formal solicitation. Interested firms under NAICS code 236210 must provide company details, bonding capacity, and evidence of experience with aviation facilities and constrained-site construction to the designated points of contact by the response deadline of December 1, 2026.
W7NF Uspfo Activity Miang 127

POSTED

2 days ago

DEADLINE

in about 1 month
NAICS: 236210
New
SLED
Facilities & Parks New Supply Warehouse Building
Solicitation # ITB FM 04-27
The Board of County Commissioners of Okaloosa County, Florida, is soliciting bids under ITB FM 04-27 for the construction of a new 9,000 square foot metal supply warehouse for the Facilities and Parks Department located at 5489 Old Bethel Road in Crestview. The project involves comprehensive site preparation and construction, including the installation of energy-efficient HVAC systems, electrical and plumbing work, and telecommunications wiring. All work must comply with the 2023 8th Edition Florida Building Code, ADA standards, and OSHA regulations, with specific structural requirements to withstand 160 MPH ultimate wind speeds. A fire alarm system is explicitly not required for this project. Bids must be submitted electronically via OpenGov by November 4, 2026, at 3:00 pm CST. The contract will be awarded to the responsive and responsible vendor with the lowest bid, though the County reserves the right to negotiate the most advantageous agreement. The selected contractor must provide a dedicated project manager and furnish both bid and performance bonds. The project timeline is 12 months from the notice to proceed. Payment will be processed through the County Finance Office in accordance with the State of Florida Local Government Prompt Payment Act, contingent upon annual appropriation. For projects involving federal grant funding, contractors must be registered in SAM.gov and comply with Buy America and Trafficking Victims Protection Act requirements.
Facilities & Parks

POSTED

7 days ago

DEADLINE

in 5 days

AI Contract Overview

Show more

This contract outlines the construction services required to replace the built-up roof systems on Buildings 2 and 3 at the Woodstock Job Corps Center in Maryland. The project is divided into three phases, beginning with the installation of a new roof hatch, a hollow metal door, and a safety-caged ladder for Building 2. The second and third phases involve the removal of existing asphalt roofing and the installation of EnergyStar rated 60 Mil Membrane Thermoplastic Built-up Roofing Systems with R-30 rigid tapered insulation on Building 2 (approximately 6,000 SF) and Building 3 (approximately 3,500 SF). Additional requirements include replacing cornice and counter flashing, cleaning drainage pipes, repointing stone coping, and replacing missing copper gutters and downspouts. The contractor must adhere to Maryland Building Codes and Davis Bacon Act Wage Requirements, providing a two-year workmanship warranty and a ten-year manufacturer warranty on materials. Safety protocols require a daily fire watch and the presence of fire extinguishers during thermofusing. Bids must be submitted in a labor and material cost format.

General Info

Agency

N/A

Contract Value

$124,777

NAICS

236210 - Industrial Building Construction

Place of Performance

Not specified

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
ContactsNo contacts available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
WOODSTOCK JOB CORPS CENTERSCOPE OF WORK BUILT-UP ROOF REPLACEMENT BUILDINGS #2 AND #3 AND ASSOCIATED WORK DEFICIENCY # 48849, 48850, 54635, 39714 AND 54634 The intend of this scope of work is to provide construction services to replace the built-up roof systems on buildings 2 and 3 with Thermoplastic Built-up Roofing System, it also includes cornice and counter flashing, roof drains, copper downspouts and roof hatch replacement. 1.1 Scope of work: A: This project consists of but is not limited to the installation of two new Built-up Roof ( BUR ) Systems and associated work. B: The contractor shall furnish all labor, materials, equipment and services necessary to complete the project in its entirety according to this scope of work. 1.2 Location: A: The project is located at the Woodstock Job Corps Center at 10900 Old Court Rd, Woodstock Md 21163. 1.3 Site Visitations: A: The contractor shall visit the site and familiarize himself with the conditions under which the work will be performed. No allowance will be made for any error on the contractors part for failure to take into account any conditions or circumstances existing at the site which might affect the contemplated work. The fact that a bid is submitted will be taken as evidence that the contractor has full knowledge of the extent and character of the contemplated work and the problems to be encountered in performing same. 1.4 Regulations: A: All work under this contract shall conform with applicable sections of the general specifications for design of Thermoplastic Built-up Roofing Systems of the State of Maryland and any other State of Maryland Building Codes. B: The contractor shall perform this project in phases. Phase one install the new roof hatch on Bldg #2, Phase Two the removal and replacement of the ( BUR ) roof on Bldg #2, after Bldg # 2 is completed the contractor shall start Phase Three on the removal and replacement of the ( BUR ) on Bldg #3. 1.5 Phase One, Building #2: A: The roof access hatch is cramped, difficult to access, and the wood hatch frame is rotten. The access to the vertical ladder is restrictive. The opening to access the ladder is only 2? square, the 20? high ladder lacks a safety cage, and the ladder terminates 2? below the roof hatch. B: The contractor shall supply and install a new roof hatch in place of the existing unit. The new roof hatch shall have a self-closing heavy duty spring hinge with self-latching lock and the ability to have hatch held open in the open position. C: The contractor shall remove the existing 2? square access panel. The contractor shall install a 3? X 7? hollow metal door, welded frame ( 16ga ) in the new opening provide by the contractor. Lock set will be provide by the Center. The contractor is responsible for the repairs and finishes for the demolition that extends beyond the door and the frame. The contractor shall finish the door and frame with one coat of rust inhibiting paint and two coats of finish paint. Color to be decided by the Center. D: The contractor shall remove existing ladder and install a new ladder with a safety cage and an extension of the ladder for egress to the roof hatch. The contractor shall mechanical support the new ladder every 4? by approved means. The contractor shall finish the ladder and cage with one coat of finish paint. Color to be decided by the Center. 1.6 Phase Two Building #2: A: The existing asphalt roof has deteriorated and needs to be replaced. Cornice flashing is leaking. The copper cornice flashing appears to be blocked, resulting in standing water next to the building. The cornice shelf is leaking and infiltrating the building damaging the plaster work. The stone coping and joints on the buildings perimeter parapet wall have deteriorated. There are cracks in the stone and the mortar joints have failed. Similarly, the copper flashing over the cornice extension at the buildings perimeter has failed. B: The contractor shall remove existing asphalt roof, flashing and roof drains. The contractor shall ensure that the exposed decking is protected from the weather. C: The contractor shall professionally clean out the drainage pipes and install new drain grates ( 4 EA ). D: The contractor shall inspect the deck and advise the Centers Representative of any corrections required before proceeding with roofing. Sweep or vacuum all surfaces prior to commencement of roofing. Allow surface to dry before proceeding. Installation of conduits or piping above the deck and under the roof membrane is not acceptable. E: The contractor shall replace the existing roofing ( approximately 6,000 SF ) with new 60 Mil Membrane Thermoplastic Built-up Roofing System and R-30 Rigid Tapered Insulations, Flashing and Accessories .The roofing should have an EnergyStar Rating. The contractor shall perform work in accordance with the printed requirements of the membrane manufacturer specification. The contractor shall maintain one copy of manufacturer?s literature on site throughout the execution of the Work. F: Materials used on this project , including air/vapor barrier membranes, primers, mastics, adhesives and sealants shall be fully compatible and shall be sourced from one manufacturer. G: The contractor shall remove loose mortar to ?? depth from coping joints and repoint, install securely ( 18? OC inside & 8?OC outside) a continuous metal coping and flashing cap with drip edges and counter flashing ( approximately 4? high X 18? wide and 324? in length ). Separately, remove copper flashing from cornice extension and re-flash with membrane (approximately 36? wide and 360? in length EPDM & Patina green color) and secure to wall with counter flashing. Clean out flashing and solder/seal all joints and seams in cornice. ( 50 LF of soldering ) 1.7 Phase Three Building #3: A: The existing asphalt roof has deteriorated, is leaking and needs to be replaced. B: The contractor shall selectively disassemble and retain lighting protection system as necessary to replace roof and reassemble upon completion. C: The contractor shall remove existing asphalt roof and flashing. The contractor shall ensure that the exposed decking is protected from the weather. D: The contractor shall inspect the deck and advise the Center Representative of any corrections required before proceeding with roofing. Sweep or vacuum all surfaces prior to commencement of roofing. Allow surface to dry before proceeding. Installation of conduits or piping above the deck and under the roof membrane is not acceptable. E: The contractor shall replace the existing roofing (approximately 3,500 SF) with new 60 Mil Membrane Thermoplastic Built-up Roofing System and R-30 Rigid Tapered Insulations, Flashing and accessories. The roofing should have an EnergyStar Rating. The contractor shall perform work in accordance with the printed requirements of the membrane manufacturer specification. The contractor shall maintain one copy of manufacturer?s literature on site throughout the execution of the Work. F: Materials used on this project, including air/vapor barrier membranes, primers, mastics, adhesives and sealants shall be fully compatible and shall be sourced from one manufacturer. G: The contractor shall reattach existing lighting rods and associated conductors using listed lighting protection system components. H: A portion of the copper gutter and two downspouts are missing on the exterior of the building. I: The contractor shall replace missing portion of copper gutter. ( 30 LF of gutter and downspouts anchored to the building ) 1.8 Fasteners: A: The contractor shall use approved insulation fasteners for cement decking. B: The contractor shall use Lead Expansion Fasteners for Metal Cap Flashing and Counter Flashing. 1.9 Protection: A: The contractor shall maintain fire watch for one hour following each day?s work when membranes are thermofused. B: The contractor shall maintain one fully operational fire extinguisher ( 30LB, ABC Type ) per torch applicator within 30 feet of point of work. 1.10 Access to Buildings and Parking Lots: A: The contractor shall provide safe access to all entryways to the buildings while project is ongoing. B: The contractor shall give the center 72 hour notice when blocking parking spaces. 1.11 Demolition/Removal: A: The contractor shall verify location and extent of demolition required to accomplish the work. B: Construction debris must be removed from site and construction area must be secured to the centers satisfaction at the end of each workday. 1.12 Rules: A: The contractor shall at all times abide by the centers rules and regulations. B: The contractor must meet the Davis Bacon Act Wage Requirements. 1.13 Warranty: A: The contractor shall hereby warrant that the Thermoplastic Built-up Roof system and Membrane Flashing will stay in place and remain leak proof for two years. B: The roofing membrane manufacturer hereby warrants that the membrane and membrane flashing will remain in a watertight condition and will not leak as a result of faulty materials for a period of ten years. Scope of warranty shall include material and labor required to return the membrane to a watertight condition. 1.14 Bid Requirement: A: The contractor shall submit their bid in a Labor cost and Material cost Format. 1.15 See Details Attached: Please note that a walk-through will be conducted on September 27th 2006 at 10:00am. Written bids should be submitted to me by COB on October 6, 2006. You may fax or e-mail your bids to +1 (555) 000-0000 or contact@example.gov. For additional information please contact Dave Bonsal, Maintenance Manger, @ +1 (555) 000-0000 or myself DeNora Brown, Purchasing Agent @ +1 (555) 000-0000. Please note that Adams and Associates, Inc., reserves the right to reject any bids and select the bid deemed most responsible. Bidders should be aware of bid requirements for federally funded projects and act accordingly

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS