Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

568380_Group_Aera_UIC

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Conservation, Geologic Energy Management Division (CalGEM) has issued a Notice of Exemption for project 568380_Group_Aera_UIC, involving sidetrack drilling operations by Aera Energy LLC in the San Ardo Oil Field, Monterey County. The project aims to support continued oil and gas resource development by sidetracking two existing cyclic steam wells, specifically the Orradre 1613-12 and Orradre 1438-12, within the Lombardi Sands. This process involves drilling new wellbores from existing ones to access remaining hydrocarbons or bypass obstructions. The work is designed to have negligible or no permanent effects on the environment, as it will occur entirely within existing disturbance footprints of 20,000 square feet per well pad, utilizing existing electrical lines and infrastructure without new ground disturbance, road construction, or pipeline installation. The construction schedule for a single well is estimated to take approximately 17 operational days following CalGEM permit approval. The work consists of five distinct phases: zonal plugging of the existing wellbore (2 days), site preparation (7 days), sidetrack drilling (3 days), well completion (2 days), and final site surface construction involving the re-installation of aboveground piping (3 days). While most construction activities are restricted to Monday through Friday from 6 am to 5 pm, the drilling rig is authorized to operate 24 hours per day. CalGEM has determined the project is exempt from full California Environmental Quality Act review under Class 1 and Class 2 exemptions, as the activities involve minor alterations to existing facilities and no expansion of the current site footprint.

General Info

Aera Energy LLC sidetrack drilling project in San Ardo Oil Field, Monterey County.

Agency

California Conservation, Department of

NAICS

213111 - Drilling Oil and Gas WellsView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

California Environmental Quality Act Notice of Exemption for 568380_Group_Aera_UIC

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Conservation, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Conservation, Department of
Office AddressN/A
Contacts
Mykal StonerAssociate Oil and Gas Engineer

Full Description

Show more
The primary work objective is to sidetrack two (2) existing well(s). This work is designed to support continuation of oil and gas resource development in the area. The wells are not being sidetracked (i) for abandonment purposes only or (ii) in connection with an enforcement order to mitigate or prevent environmental damage or surface expression. Sidetracking is the process of drilling a new wellbore from an existing wellbore. This is typically done when the original wellbore encounters a problem, when accessing remaining hydrocarbons within portions of the same reservoir, or when obstructions in the wellbore need to be bypassed. This process allows drilling a new section in an existing wellbore in the same rock formation restoring the well’s original functionality. The potential disturbance footprint would encompass an existing 20,000 square foot (100 ft x 200 ft) well pad per well. The entirety of this work would be located in an area of existing disturbance and no change in the surface topography (such as drainage patterns) would result. There will be no expansion of the existing well pads, roads, staging areas, or pipelines. No new grading would occur in any undisturbed areas. No new road construction or expansions would be required for the proposed project. Routine maintenance activities at the site would include removal of weeds and other ruderal vegetation for fire control and road maintenance. The work will commence after CalGEM permit approval. The time of year the work would occur is dependent on the date of final CalGEM permit approval. For a single well, it is expected to take approximately 17 operational days to complete all construction phases. Construction activities would generally include the following phases with estimated duration: 1. Plugging a portion of existing wellbore – 2 days • Zonal plugging of wellbore to be sidetracked from in accordance with CalGEM plugging requirements. 2. Site preparation – 7 days • Site location work on existing well pads to create safe work site for personnel and environment 3. Sidetrack drilling (construction) of the well – 3 days • Sidetracking operations in accordance with CalGEM regulations 4. Well completion – 2 days • Subsurface completion of well in accordance with CalGEM regulations 5. Final site surface construction – 3 days • Re-installation of various aboveground piping and equipment to connect well sites to the existing infrastructure Each phase requires different combinations of temporary equipment. At the end of each construction phase, the temporary equipment would be removed from the well site. All work during the project phases, except for the drilling phase, will occur during the days Monday through Friday, and approximate hours from 6 am to 5 pm. The drilling rig will operate 24 hours per day. The construction activity will not include installation of new pipelines or infrastructure. No new ground disturbance would occur. The proposed construction activities would use existing electrical lines. The proposed construction activities would involve a combination of re-use, repair, or reinstallation of various above-ground piping to connect subject well sites to the existing infrastructure. The proposed sidetracks are of existing cyclic steam wells which are completed in the Lombardi Sands (Pool: Lombardi, Pool Code: 10). The Lombardi Sands in the San Ardo Oil Field is a known hydrocarbon zone. The proposed sidetracks will remain in the same pool as the original wellbore. The pool designation will not change. The proposed sidetracks will NOT change the current designation of the existing wells. The proposed project consists of the California Department of Conservation, Geologic Energy Management Division (CalGEM) approving two (2) permit(s) for Aera Energy LLC to perform sidetrack work on the wells listed below, in the San Ardo Oil Field. API # Well Name 0405322271 Orradre 1613-12 0405322264 Orradre 1438-12

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS