568380_Group_Aera_UIC

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Conservation, Geologic Energy Management Division (CalGEM) has issued a Notice of Exemption for project 568380_Group_Aera_UIC, involving sidetrack drilling operations by Aera Energy LLC in the San Ardo Oil Field, Monterey County. The project aims to support continued oil and gas resource development by sidetracking two existing cyclic steam wells, specifically the Orradre 1613-12 and Orradre 1438-12, within the Lombardi Sands. This process involves drilling new wellbores from existing ones to access remaining hydrocarbons or bypass obstructions. The work is designed to have negligible or no permanent effects on the environment, as it will occur entirely within existing disturbance footprints of 20,000 square feet per well pad, utilizing existing electrical lines and infrastructure without new ground disturbance, road construction, or pipeline installation. The construction schedule for a single well is estimated to take approximately 17 operational days following CalGEM permit approval. The work consists of five distinct phases: zonal plugging of the existing wellbore (2 days), site preparation (7 days), sidetrack drilling (3 days), well completion (2 days), and final site surface construction involving the re-installation of aboveground piping (3 days). While most construction activities are restricted to Monday through Friday from 6 am to 5 pm, the drilling rig is authorized to operate 24 hours per day. CalGEM has determined the project is exempt from full California Environmental Quality Act review under Class 1 and Class 2 exemptions, as the activities involve minor alterations to existing facilities and no expansion of the current site footprint.

General Info

Aera Energy LLC sidetrack drilling project in San Ardo Oil Field, Monterey County.

Agency

California Conservation, Department of

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia Conservation, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Conservation, Department of
Office AddressN/A
Contacts
Mykal StonerAssociate Oil and Gas Engineer

Full Description

Show more
The primary work objective is to sidetrack two (2) existing well(s). This work is designed to support continuation of oil and gas resource development in the area. The wells are not being sidetracked (i) for abandonment purposes only or (ii) in connection with an enforcement order to mitigate or prevent environmental damage or surface expression. Sidetracking is the process of drilling a new wellbore from an existing wellbore. This is typically done when the original wellbore encounters a problem, when accessing remaining hydrocarbons within portions of the same reservoir, or when obstructions in the wellbore need to be bypassed. This process allows drilling a new section in an existing wellbore in the same rock formation restoring the well’s original functionality. The potential disturbance footprint would encompass an existing 20,000 square foot (100 ft x 200 ft) well pad per well. The entirety of this work would be located in an area of existing disturbance and no change in the surface topography (such as drainage patterns) would result. There will be no expansion of the existing well pads, roads, staging areas, or pipelines. No new grading would occur in any undisturbed areas. No new road construction or expansions would be required for the proposed project. Routine maintenance activities at the site would include removal of weeds and other ruderal vegetation for fire control and road maintenance. The work will commence after CalGEM permit approval. The time of year the work would occur is dependent on the date of final CalGEM permit approval. For a single well, it is expected to take approximately 17 operational days to complete all construction phases. Construction activities would generally include the following phases with estimated duration: 1. Plugging a portion of existing wellbore – 2 days • Zonal plugging of wellbore to be sidetracked from in accordance with CalGEM plugging requirements. 2. Site preparation – 7 days • Site location work on existing well pads to create safe work site for personnel and environment 3. Sidetrack drilling (construction) of the well – 3 days • Sidetracking operations in accordance with CalGEM regulations 4. Well completion – 2 days • Subsurface completion of well in accordance with CalGEM regulations 5. Final site surface construction – 3 days • Re-installation of various aboveground piping and equipment to connect well sites to the existing infrastructure Each phase requires different combinations of temporary equipment. At the end of each construction phase, the temporary equipment would be removed from the well site. All work during the project phases, except for the drilling phase, will occur during the days Monday through Friday, and approximate hours from 6 am to 5 pm. The drilling rig will operate 24 hours per day. The construction activity will not include installation of new pipelines or infrastructure. No new ground disturbance would occur. The proposed construction activities would use existing electrical lines. The proposed construction activities would involve a combination of re-use, repair, or reinstallation of various above-ground piping to connect subject well sites to the existing infrastructure. The proposed sidetracks are of existing cyclic steam wells which are completed in the Lombardi Sands (Pool: Lombardi, Pool Code: 10). The Lombardi Sands in the San Ardo Oil Field is a known hydrocarbon zone. The proposed sidetracks will remain in the same pool as the original wellbore. The pool designation will not change. The proposed sidetracks will NOT change the current designation of the existing wells. The proposed project consists of the California Department of Conservation, Geologic Energy Management Division (CalGEM) approving two (2) permit(s) for Aera Energy LLC to perform sidetrack work on the wells listed below, in the San Ardo Oil Field. API # Well Name 0405322271 Orradre 1613-12 0405322264 Orradre 1438-12

Similar Contracts

Same NAICS industry code

NAICS: 213111
SLED
ODNR, Division of Oil & Gas – OWP – Wyandot 3 - 3 Wells
Solicitation # SRC0000042681
The Ohio Department of Natural Resources, Division of Oil and Gas Resources Management, is soliciting bids for the Wyandot 3 project to plug and plate three orphan wells located in Wyandot County, specifically within Crawford and Ridge townships. The scope of work includes mobilization, site development, drilling, cleaning out, and plugging of the wells, as well as the decommissioning and disposal of all casing, tubing, and production equipment. The project requires the restoration of all disturbed areas to a condition equal to or better than their original state, with all work adhering to Ohio Administrative Code 1501-9-11-10 and specific technical drawings. The project must be completed by April 2, 2027, and includes a one-year warranty on all work and materials. To be eligible for award, suppliers must be active on state contract CSP900922 (DAS Index No. MAC110), maintain good standing with other agency projects, and have attended the mandatory pre-bid meeting held on November 3, 2026. The contract will be awarded to the lowest responsive and responsible bidder, provided their offer is mathematically and materially balanced. Bidders must submit their proposals via the OhioBuys portal by November 19, 2026. Payment is processed through the Orphan Well Project Management Contractor Portal and requires mutual agreement on work completion between the contractor and the Division's Project Representative. For federally funded portions of the project, contractors must comply with the Buy American Act and submit payroll reports with each invoice.
Dnr900200 Oil And Gas Dnrfra

POSTED

12 days ago

DEADLINE

in 13 days
View Details
NAICS: 213111
SLED
DS-761-270000000007-1 | Wellmaster Newaygo & Mecosta OW Plug Project 22 wells
Solicitation # 270000000007
The State of Michigan Department of Environment, Great Lakes, and Energy has issued Request for Quotation DS270000000007 for the plugging, drilling, re-drilling, and site restoration of orphan wells in Newaygo and Mecosta Counties, specifically targeting the Troyer 1-7A and Daniels 1-1B locations. The scope of work includes setting up workover rigs, cleaning and electronically logging wellbores, and performing bottom-up cementing to seal zones and protect freshwater aquifers. Additionally, the contractor is responsible for decommissioning abandoned tanks and vessels, including steam cleaning and scrap preparation, and removing all associated flowlines, electric lines, buildings, and debris. Proposals are due by November 24, 2026, following a mandatory pre-proposal meeting on November 10, 2026. Eligibility is limited to prequalified vendors, and awards are based on a technical evaluation of key personnel, owned equipment, technical experience, and a vendor questions worksheet, with a minimum scoring requirement of 80 points. The project is subject to the Davis-Bacon Act and specific Department of Labor wage determinations for heavy construction classifications. Bidders must provide a detailed project timeline divided into site preparation, mobilization/demobilization, plugging, and site restoration, along with unit pricing for all rated items in the provided pricing matrix.
Con Hall

POSTED

12 days ago

DEADLINE

in 18 days
View Details
NAICS: 213111
SLED
ODNR, Division of Oil & Gas – OWP – Federal Project –Scioto 3F - 2 Wells
Solicitation # SRC0000042633
The Ohio Department of Natural Resources, Division of Oil and Gas Resources Management, is soliciting bids for the Scioto 3F Project to plug and plate two orphan wells, Oertels Corner #1 and Romanello #1, located in Jefferson Township, Scioto County. The scope of work encompasses mobilization, well site development, drilling or cleaning out and plugging of the wells, decommissioning and disposal of all casing and production equipment, and full restoration of disturbed areas. Key technical deliverables include the installation of cement plugs from 210 feet to within 30 inches of ground level and the maintenance of strict well control throughout the process. Work must be performed in accordance with Ohio Revised Code 1509 and Ohio Administrative Code Chapters 1501:9-11 and 1501:9-12. As a federally funded project, contractors must comply with Davis-Bacon prevailing wage requirements and Buy America sourcing mandates for iron, steel, and manufactured construction materials. Eligible bidders must be active on CSP900922 (DAS Index No. MAC110), attend the mandatory pre-bid meeting on November 4, 2026, and be in good standing with the agency. The contract will be awarded to the lowest responsive and responsible bidder based on submissions via OhioBuys. Performance must begin within three months of the contract end date and be completed by May 1, 2027, or five months after the effective date, whichever is sooner. Invoicing is managed through the Orphan Well Project Management Contractor Portal and requires supporting documentation, including payroll reports for federal compliance.
Dnr900200 Oil And Gas Dnrfra

POSTED

14 days ago

DEADLINE

in 13 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS