Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on September 19, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

58--DRIVE,SECTOR SCAN, IN REPAIR/MODIFICATION OF

Closed
N0038325QN323Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334511
New
Federal
Automated Traffic Enforcement Trailer
Solicitation # W911S226U4411
Solicitation W911S226U4411 is a Total Small Business Set-Aside for the procurement of a complete, towable, autonomous mobile traffic enforcement trailer and laser-based measuring system for the Department of Defense at Fort McCoy, Wisconsin. The primary requirement is for one Automated Traffic Monitoring System Trailer, specifically the POLISCAN Speed FM1 or an approved equal, capable of tracking multiple vehicles across at least four adjacent traffic lanes to enforce speed limits and red-light violations. The contract includes a requirement for eight hours of on-site operator training at Fort McCoy and a minimum 12-month comprehensive manufacturer's warranty. All equipment must be new, and the system must be calibrated to federal and state standards to ensure data is legally admissible in court. The award will be granted to the responsible offeror whose proposal is most advantageous to the government based on price and technical evaluations. Delivery is required F.O.B. Destination to Fort McCoy, with a preferred delivery window of 30 days. Offerors must submit their proposals via the PIEE Solicitation module, including technical, price, and past performance documentation. A critical requirement for responsiveness is the completion of Attachment 1 regarding certifications and the identification of the country of origin. The contract incorporates various regulatory clauses, including Buy American preferences, cybersecurity reporting under DFARS 252.204-7012, and prohibitions on certain telecommunications equipment.
W6QM Micc-Ft Drum

POSTED

about 2 hours ago

DEADLINE

in 7 days
NAICS: 334511
New
Federal
66--INDICATOR,ATTITUDE, IN REPAIR/MODIFICATION OF
Solicitation # N0038326QBB18
This solicitation, issued by NAVSUP Weapon Systems Support Philadelphia, is a Request for Quotations for the repair, overhaul, upgrade, and inspection of 33 Attitude Indicators (NSN 6610-01-101-1927 LC, P/N 622-3374-002). The objective is to return these units to a Ready For Issue condition, ensuring they perform reliably in operational environments. The contract includes an initial induction period of 365 calendar days, which the government may extend by an additional year. Offerors must provide option pricing for a maximum of 135 units over the total contract period. Award will be granted to the offeror with the lowest price technically acceptable quote, with past performance evaluated via the DoD Supplier Performance Risk System. The contractor is responsible for providing all labor, facilities, materials, and tooling, as government-furnished manufacturing aids are not provided. Key technical requirements include compliance with ISO 9001 or SAE AS9100 quality systems and calibration standards such as ANSI/NCSL Z540.3 or ISO-10012-1. Specific prohibitions are in place regarding the use of MIL-W-81381 wire, requiring the use of SAE-AS22759 series wire instead. The contract establishes strict protocols for Beyond Economical Repair and Missing on Induction determinations, both of which require written concurrence from DCMA. Deliveries are FOB Destination with a 90-day delivery window, and all packaging must adhere to MIL-STD-2073 and MIL-STD-129 standards. Invoicing and receiving reports must be processed electronically through the Wide Area Workflow system.
Navsup Weapon Systems Support

POSTED

about 2 hours ago

DEADLINE

in 14 days
NAICS: 334511
New
Federal
58--THERMAL IMAGING SYS
Solicitation # N0010426RQA81
Solicitation N00104-26-R-QA81, issued by NAVSUP Weapon Systems Support Mechanicsburg, is a firm fixed price negotiated procurement for the manufacture of Thermal Imaging Systems under NSN 5855-01-499-1240. The government is seeking a single award based on the most advantageous offer, with past performance weighted as more important than price. The evaluation process utilizes the DoD Supplier Performance Risk System for quality ratings, and the government reserves the right to award to other than the lowest priced offer. Proposals must be submitted via NECO or email, and the current requested delivery date is 180 days after award. The contract mandates strict adherence to quality and technical standards, including physical identification per MIL-STD-130 and preservation and packaging according to MIL-STD-2073. Inspection and acceptance are conducted at the origin, with the contractor remaining responsible for all inspection requirements and maintaining records for 365 days post-delivery. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and payment, compliance with Buy American and Balance of Payments program certificates, and adherence to cybersecurity standards for covered defense information. Offerors must be authorized distributors of the original manufacturer to be considered for award.
Navsup Weapon Systems Support Mech

POSTED

about 2 hours ago

DEADLINE

in 3 months

AI Contract Overview

Show more

This contract involves the repair, testing, and inspection of the Drive, Sector Scan, TY2031-02A and TY2031-02B, with part numbers and NSN details specified, under the oversight of the Department of the Navy's Naval Supply Systems Support. The scope mandates that all articles be repaired and returned to a serviceable condition in accordance with MIL-STD-130 markings and approved repair manuals, with the contractor responsible for providing all necessary parts, tooling, and facilities unless otherwise specified as Government Furnished Material. The contract emphasizes strict adherence to quality standards, requiring the contractor to implement an ISO 9001/SAE AS9100-compliant quality management system, maintain calibration and configuration management procedures, and ensure proper storage and handling of materials. Key provisions include detailed requirements for parts control, inspection, and documentation, as well as procedures for handling nonconforming materials, failure analysis, and repair assessments. The contractor must obtain approval for any changes to repair procedures, drawings, or manufacturing sources, and is responsible for maintaining comprehensive records of all repair and inspection activities. The contract also specifies that repairs exceeding 75% of replacement cost are considered beyond economical repair and require approval from the Defense Contract Management Agency. Overall, the agreement mandates rigorous quality control, precise documentation, and compliance with military standards to ensure the repaired items meet operational readiness standards.

General Info

Repair and upgrade DRIVE SECTOR SCAN units; strict quality, certification, and documentation requirements.

NAICS

334511 - Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

Place of Performance

PA

Set-Aside

NONE

Documents

3

N0038325QN3230001.pdf

PDF

N0038325QN3230002.pdf

PDF

N0038325QN323.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Sep 29, 2025 to Oct 20, 2025. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support
Contacts1 person available
OfficePHILADELPHIA, PA, 19111-5098, USA
Office AddressPHILADELPHIA, PA, 19111-5098, USA

Full Description

Show more
CONTACT INFORMATION|4|N731.49|N00383|+1 (555) 000-0000|contact@example.gov| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|X||||||||||||X|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report Combo|Inspection site source Final acceptance site source|TBD |N00383|TBD |TBD |See Schedule|TBD ||||||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|365 days| 45 days of the last delivery under this contract||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||DO A1A| 1. The closing date of this solicitation is hereby extended to 20 OCTOBER 2025. 2. All other terms and conditions remain the same. \ 1. All Terms and conditions of BOA N0038322GZ801 will apply. \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.3 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.4 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.5 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: DRIVE,SECTOR SCAN ;TY2031-02A, TY2031-02B; P/N, ;7RH 5841 014183155 V2; NSN, ;REPAIR IN ACCORDANCE WITH THE DRAWING AND TECHNICAL SPECIFICATIONS.; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. DRIVE,SECTOR SCAN ;GOODRICH ACTUATATION SYSTEMS LTD; Company Name , ;STAFFORD ROAD, FORDHOUSE, WOLVERHAMTPON WV10 7EH, UNITED KINGDOM; Address , ;K0377; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. The contractor shall maintain a quality control system which meets the requirements of Mil-I-45208A, Mil-Q 9858,ISO-9000 / 9001 / 9002 or equivalent. RESPONSIBILITY FOR INSPECTION: Unless otherwise specified, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the contractor may use his own or any other facility suitable for the performance of the inspection requirements specified herein. PROCEDURES:The contractor shall prepare and maintain Quality Control Documentation, test and repair procedures, and inspection procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of the test, repair, and inspection process, as well as the performance spcifications to perform the procedures. QUALITY ASSURANCE PROGRAM PLAN: The contractor shall develop, implement and maintain a Repair Quality Plan in compliance with the requirements of Mil-I-45208A, Mil-Q-9858, ISO,9000 / 9001 / 9002, or equvalent.The plan shall define the specific methods by which compliance with contractual requirements will be assured. All quality assurance data shall be provided to the Government for review and approval upon request. PURCHASED MATERIAL CONTROL: The contractor shall establish and maintain a system of control over purchased material which shall assure that the necessary requirements of this contract are included. in all sub contract agreements. A parts control system shall establish a record of performance for each purchased and internally manufactured part and shall be used to evaluate continued use of the source. The contractors control system shall be in compliance wil either Mil-I 45208A/Mil-Q-9858 or equivalent Quality Quality Assurance Standared.(ISO/AS:9000, 9001, 9002). RECEIVING INSPECTION OF PURCHASED MATERIAL: Purchased items shall be inspected upon receipt at the contractors facility to assure conformance with all requirements of the Technical Data Package (TDP). Evidence of such inspections shall be maintained for Government review at least twelve (12) months following acceptance of the end item. Inspection reports shall be maintained by the contractor. The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria, such ascertifications, and actual dimensional readings. FAILURE ANALYSIS AND CORRECTIVE ACTION:All failure analysis and corrective action reports/plans shall be submitted to the Government. NONCONFORMING MATERIAL:The contractor shall establish an effective system for controlling nonconforming material including procedures for identification, segregation, and disposition. CONTRACTOR INTERNAL REVIEW BOARD (IRB):IRB authority is delegated to the contractor for this contract only. The IRB may be used only for disposition of materials exhibiting minor non-conformances, scrap or rework to return a part to conformance with drawings or specifications as authorized by the approved repair procedures.IRB shall not use "AS-IS" disposition. A complete file of IRB actions shall be maintained for review by the Government for concurrance of classification. MATERIAL REVIEW BOARD (MRB):Formal MRB authority for disposition of "AS-IS"and for minor non-conformances is retained by the Government. The contractor shall submit the appropriate request for Variance via the DCMC to the NAVSUP Contracting Officer. RESPONSIBILITY FOR COMPLIANCE: All items must meet all requirements of this Statement of Work. The inspection requirements set forth in this SOW shall become part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the SOW shall not relieve the contractor of the responsibility of assuring that all Government equipment submitted for acceptance comply with all requirements. Sampling in quality conformance does not authorize submission of known defective items, either indicated or actual, nor does it commit the procuring activity to acceptance of any defective items. REPAIR ASSESSMENT TESTING: The Government may select samples of the Contract Line Items (CLINS) which have completed repair and have been accepted by the Government representative for the purpose of conducting performance testing, environmental testing, and quality conformance examination in a repair assessment test program. A quantity of CLIN's may be randomly selected from each quaterly repair production completion for shipment to the CFA or other Government designated location to conduct this testing. RECORDS OF DATA COLLECTION: The contractor shall maintain a historical record file to contain copies of applicable data and documents for individual CLIN's and assemblies by CLIN serial number. The historical record file shall include,but not be limited to the following types of historical records: Receipt inspection documentation. Repair shop travelers or repair cards. Parts replacement records. Parts inspection data before and after repair as applicable. Acceptance test data. QA personnel shall maintain a complete receipt inspection,test, repair re-test, history card for each item processed. This information shall be made available to the Government upon request. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

More opportunities from Department Of Defense → Navsup Weapon Systems Support

Same awarding agency

NAICS: 335312
New
Federal
PANEL,CONTROL,ELECT
Solicitation # N0038326QAA77
Solicitation NO0383-26-Q-AA77, issued by NAVSUP Weapon Systems Support, seeks a contractor to provide repair, overhaul, and modification services for electrical control panels (NSN 6110-01-433-5020). The contractor is responsible for providing all necessary facilities, labor, materials, and tooling to return units to a Ready For Issue condition. Key technical requirements include adherence to MIL-STD-130 for markings, the prohibited use of MIL-W-81381 wire in favor of SAE-AS22759, and compliance with ISO 9001/SAE AS9100 quality standards. The scope includes strict protocols for handling items determined to be Beyond Economical Repair, Missing on Induction, or requiring Over and Above Repair, all of which require written concurrence from DCMA and the Procuring Contracting Officer. The government intends to make a single award based on a trade-off between price and past performance, with past performance weighted as the more important factor. Deliveries are expected within 90 days, with Repair Turnaround Time measured from asset return to acceptance at the origin. Packaging must comply with MIL-STD-2073-1 and MIL-STD-129, with specific requirements for electrostatic protection and Depot Level Repairable labeling. Invoicing and receiving reports must be processed electronically through the Wide Area WorkFlow system. The resulting contract will be a DO rated order certified for national defense.
Motor and Generator Manufacturing

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 336412
New
Federal
GUARD,GASOLINE ENGI
Solicitation # N0038327QTA11
Solicitation N0038327QTA11, issued on October 8, 2026, by NAVSUP Weapon Systems Support Philadelphia, is a request for quotations for the procurement of a Gasoline Engine Guard, identified by NSN 2810-01-737-5535. The government intends to make a single award to a responsible offeror based on a best-value determination where past performance is considered more important than price. Evaluation of past performance may include the use of the DoD Supplier Performance Risk System to assign color ratings, while price serves as a secondary factor. Quotations are due by November 9, 2026, and the required delivery period is 90 days FOB Destination to the DLA Distribution New Cumberland facility in Pennsylvania. The contract mandates strict adherence to military standards for packaging and marking, specifically MIL-STD-2073-1 and MIL-STD-129, with specific requirements for domestic and overseas shipments. Contractors must comply with cybersecurity standards outlined in NIST SP 800-171 and DFARS 252.204-7012. Quality management compliance with ISO 9001 or SAE AS9100 is required, and inspection and acceptance will occur at the origin. Administrative requirements include the use of the Wide Area Workflow system for invoicing and payment, and compliance with the Buy American and Balance of Payments Program. Offerors must also provide hazardous material certifications and safety data sheets if applicable.
Aircraft Engine and Engine Parts Manufacturing

POSTED

about 2 hours ago

DEADLINE

in 11 days
View Details
NAICS: 336320
New
Federal
CONTROL,ELECTRIC LI
Solicitation # N0038326QAA79
Solicitation N0038326QAA79, issued by NAVSUP Weapon Systems Support Philadelphia, is a small business set-aside request for quotations for the teardown, evaluation, repair, and modification of the Control, Electric L1 (NSN 7RH 6220-01-435-0198KB, P/N 712860-1). The objective is to return these units to a Ready For Issue condition, ensuring they perform reliably in their intended operational environment. The contractor is responsible for providing all necessary facilities, labor, materials, and tooling, as the government will not provide manufacturing aids such as fixtures or special test equipment. All work must be performed in accordance with the most recent technical publications and approved repair manuals, with specific prohibitions against the use of MIL-W-81381 wire, requiring SAE-AS22759 series wire instead. The contractor must maintain a rigorous quality management system compliant with ISO 9001 or SAE AS9100 and a calibration system meeting ANSI/NCSL Z540.3 or ISO-10012-1. Key requirements include the maintenance of detailed historical record files for each serial number and the submission of all failure analysis and corrective action reports to the government. While the contractor is granted Internal Review Board authority for minor non-conformances, formal Material Review Board authority for as-is dispositions remains with the government. Award will be made to a single offeror based on the most advantageous combination of price and past performance, with past performance weighted as more important. Deliveries are FOB Destination, and all items must be preserved and packaged according to MIL-STD-2073-1.
Motor Vehicle Electrical and Electronic Equipment Manufacturing

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 335312
New
Federal
PANEL,CONTROL,ELECT
Solicitation # N0038326QAA84
Solicitation N0038326QAA84, issued by NAVSUP Weapon Systems Support Philadelphia, is a small business set-aside request for quotations for the repair, overhaul, and upgrade of electrical control panels (NSN 6110-01-472-3531). The contractor is responsible for providing all necessary facilities, labor, materials, and tooling to return assets to a Ready For Issue condition, as the government will not provide manufacturing aids or special test equipment. Key technical requirements include adherence to MIL-STD-130 for markings, MIL-STD-2073 for packaging, and a strict prohibition on the use of MIL-W-81381 wire, which must be replaced by SAE-AS22759 series wire. The required repair turnaround time is 100 days after receipt of the asset. The government will make a single award based on the most advantageous offer, prioritizing past performance over price. Evaluation will utilize the Supplier Performance Risk System to assess item, price, and supplier risk. Contractors must maintain a quality management system compliant with ISO 9001 or SAE AS9100 and a calibration system meeting ANSI/NCSL Z540.3 or ISO-10012-1. The contract includes specific protocols for Beyond Economical Repair and Missing on Induction determinations, both requiring written concurrence from DCMA. Invoicing and receiving reports must be processed through Wide Area Workflow, with final inspection and acceptance occurring at the contractor's location.
Motor and Generator Manufacturing

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 335312
New
Federal
PANEL,CONTROL,ELECT
Solicitation # N0038326QAA83
Solicitation NO0383-26-Q-AA83, issued by NAVSUP Weapon Systems Support, is a request for quotations for the teardown, evaluation, repair, and modification of Electrical Control Panels (NSN 6110-01-472-3513). The objective is to return these units to a Ready For Issue condition through a process of inspection, component replacement, and testing. The contractor is responsible for providing all necessary facilities, labor, materials, and tooling, as the government will not provide manufacturing aids. Key technical constraints include a strict prohibition on MIL-W-81381 wire, requiring the use of SAE-AS22759 series wire instead, and adherence to MIL-STD-130 for markings and MIL-STD-2073 for packaging. The contract establishes a Repair Turnaround Time of 80 days after receipt of assets, with an induction expiration date set for 365 days after award. Performance is governed by high quality standards, requiring a quality management system compliant with ISO 9001/SAE AS9100 and calibration systems meeting ANSI/NCSL Z540.3 or ISO-10012-1. The government utilizes a specific process for Beyond Economical Repair and Missing on Induction determinations, requiring written concurrence from DCMA. Award will be made to a single, technically acceptable offeror based on the most advantageous combination of price and past performance, with past performance weighted as the more important factor.
Motor and Generator Manufacturing

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 336413
New
Federal
16--NVG,HUD CONVERTER,A, IN REPAIR/MODIFICATION OF
Solicitation # N0038326QQB47
Solicitation NO0383-26-Q-B47, issued by NAVSUP Weapon Systems Support Philadelphia, is a small business set-aside request for quotations for the teardown, evaluation, repair, and modification of the NVG HUD Converter A (NSN 7RH 1680 014956018 V2). The contractor is responsible for providing all labor, facilities, materials, and tooling necessary to return these units to a Ready for Issue condition. Key technical requirements include strict adherence to MIL-STD-130 for markings, the mandatory use of SAE-AS22759 series wire in place of prohibited MIL-W-81381 wire, and compliance with ISO 9001/SAE AS9100 quality standards. All work must be performed at the identified contractor facility, and any changes to repair manuals or sources require approval from the Procuring Contracting Officer. The contract establishes specific protocols for Beyond Economical Repair and Missing on Induction determinations, both of which require written concurrence from DCMA. Deliveries are expected within 90 days, with inspection and acceptance occurring at the origin. Packaging must conform to MIL-STD-2073-1 and ANSI/ESD S20.20-2021 for electronic protection. Award will be made to a single, technically acceptable offeror based on an evaluation of technical capability and past performance risk via the Supplier Performance Risk System. Invoicing and receiving reports must be processed electronically through the Wide Area Workflow system.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

about 2 hours ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS