Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on February 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF

Closed
N0038326QLA55Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334412
New
Federal
CIRCUIT CARD ASSEMB
Solicitation # SPRMM127QKA49
Solicitation SPRMM127QKA49, issued by NAVSUP Weapon System Support for the Department of Defense, seeks the manufacture and delivery of five Circuit Card Assemblies (NSN 5998-20-007-0323). The required items must conform to the design represented by Cage Code 1EG52, reference number ROF61205/4, and must be physically identified per MIL-STD-130. Award will be granted to the responsible offeror submitting the Lowest Price Technically Acceptable (LPTA) offer, with evaluations incorporating Supplier Performance Risk System (SPRS) data to assess item, price, and supplier risk. Offerors who are not the Original Equipment Manufacturer (OEM) must identify the OEM and their associated CAGE code. The contract mandates strict adherence to quality and packaging standards, specifically MIL-STD-2073 for preservation and MIL-STD-129 for marking. Due to the nature of the components, electrostatic discharge protection per ANSI/ESD S20.20-2021 is required for sensitive items. Inspection and acceptance will occur at the origin. Administrative requirements include the mandatory use of the Wide Area WorkFlow (WAWF) system for electronic invoicing and receiving reports, and CMMC Level 1 self-certification for cybersecurity. Additionally, the government prohibits the procurement of these assemblies if they are manufactured, assembled, or delivered from a Covered Nation.
SPRMM1 DLA Mechanicsburg

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 334412
New
Federal
CIRCUIT CARD ASSEMB
Solicitation # N0038327QAA13
Solicitation N00383-27-Q-AA13, issued by NAVSUP Weapon Systems Support Philadelphia, is a request for quotations for the overhaul, upgrade, repair, testing, and inspection of various printed circuit boards and assemblies, including NSNs 5998-01-512-3463, 015123482, 015215180, 1680-01-619-4547, and 5998-01-620-1746. The objective is to return these assets to a Ready for Issue condition. The contract specifies a one-year induction period from the date of award, with requirements for Repair Turnaround Time and throughput constraints. All work must be performed at the contractor's specified facility, and the contractor is responsible for providing all necessary labor, materials, and tooling, as government-furnished equipment is not provided. The government intends to make a single award based on the most advantageous offer, prioritizing past performance over price, with evaluations utilizing the DoD Supplier Performance Risk System. Technical requirements include adherence to MIL-STD-130 for markings, SAE-AS22759 for wiring, and ISO 9001/SAE AS9100 for quality management. Packaging must comply with MIL-STD-2073-1 and MIL-STD-129. Invoicing and payment will be processed electronically through the Wide Area Workflow system. Key contractual provisions include strict guidelines for Beyond Economical Repair and Over and Above Repair determinations, which require written concurrence from DCMA and the Procuring Contracting Officer.
Navsup Weapon Systems Support

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 334412
New
ELECTRONIC COMPONEN — 5998016746980 — SPRMM127QKA52
Solicitation # SPRMM127QKA52
Solicitation SPRMM1-27-Q-KA52, issued by NAVSUP Weapon Systems Support for the Department of the Navy, seeks the manufacture and delivery of one electronic component identified by NSN 5998-01-674-6980 and NIIN 016746980. The item must conform to the design represented by Cage Code 04JN4, reference number A0091563. Award will be granted to the responsible offeror submitting the lowest priced, technically acceptable offer, with evaluations considering item, price, and supplier risk via the Supplier Performance Risk System. Offerors who are not the original equipment manufacturer must provide the OEM's CAGE code and part number. The contract mandates strict adherence to quality and safety standards, including physical identification per MIL-STD-130 and packaging according to MIL-STD-2073. A critical requirement is that the material must be mercury-free to prevent corrosion and toxicity on submarines and surface ships. Inspection and acceptance will occur at the origin, and the contractor must maintain inspection records for 365 days following final delivery to Manassas, Virginia. Administrative requirements include electronic invoicing and receiving through the Wide Area WorkFlow system and compliance with various FAR and DFARS clauses regarding cybersecurity, foreign ownership, and trade agreements.
SPRMM1 DLA Mechanicsburg

POSTED

about 16 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This solicitation, N0038326QLA55, issued by the Naval Supply Systems Command Weapon Systems Support, seeks a sole-source contractor to repair and modify circuit card assemblies identified by part number D0012489-1001 and NSN 015595129. The contract is limited to the current approved source due to the Government's lack of sufficient, accurate, or legible data to support competition, and all offers must include full compliance with the NAVSUP WSS Source Approval Brochure to be considered. The work must be performed at The Boeing Company’s facility in Saint Louis, Missouri, with all repairs executed in strict accordance with approved technical publications and procedures, and no deviations permitted without formal Government authorization through designated forms and review processes. The contractor is responsible for all materials, tools, and facilities required to return items to a Ready for Issue condition, and any use of non-new parts or cannibalization requires prior written approval from the Procuring Contracting Officer and Basic Design Engineer. The contract imposes rigorous quality, configuration, and process control requirements, mandating adherence to ISO 9001/SAE AS9100 standards, a verifiable calibration system compliant with ANSI/NCSL Z540.3 or equivalent, and a comprehensive configuration management plan aligning with NAVSUP WSS clause NAVICPIA18. All repairs are subject to Beyond Economic Repair (BER), Missing on Induction (MOI), and Over and Above Repair (OAR) protocols requiring prior DCMA concurrence and PCO authorization before proceeding, with no equitable adjustments permitted if changes are disapproved. The contractor must maintain full documentation of all inspection, test, and repair processes and ensure all purchased parts meet new material standards under FAR 52.211-5. Repair validity must remain open for 120 days following submission, and the solicitation response deadline is February 17, 2026. All contractual documents are deemed issued electronically upon transmission, and the primary point of contact for inquiries is Danielle Junod at [email hidden].

General Info

Sole source contract for Boeing to repair, test, and inspect circuit card per strict government standards.

NAICS

334412 - Bare Printed Circuit Board Manufacturing

Place of Performance

PA

Set-Aside

NONE

Documents

2

Request for Quotations NO0338-26-Q-LA55

PDF, High priority: read this firstrfq
High

Solicitation Amendment 0001

PDF, High priority: read this firstamendment
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jan 12, 2026 to Feb 17, 2026. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Type Changed

Solicitation → Presolicitation

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support
Contacts1 person available
OfficePHILADELPHIA, PA, 19111-5098, USA
Office AddressPHILADELPHIA, PA, 19111-5098, USA

Full Description

Show more
CONTACT INFORMATION|4|N792.15|T83|NA|contact@example.gov| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|x||||||||||||x|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report Combo|Source|TBD|N00383|TBD|TBD|See schedule|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|One year after delivery date|45 days after discovery of the defect||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|12|334419|750||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2|DO-A1C || The purpose of this amendment is to extend the solicitation date to 17 FEB 2026.// This solicitation is for repair. This is a sole source requirement. The Government physically does not have in its possession sufficient, accurate, or legible data to contract with other than the current source. These items require Government Source Approval prior to award. If you are not an approved source, you must submit, together with your proposal, the information detailed in the NAVSUP WSS Source Approval Brochure which can be obtained on the internet at h https://www.navsup.navy.mil/public/navsup/wss/business_opps/. Offers received which fail to provide all data required by the source approval brochure will not be considered for award under this solicitation. For information or questions regarding this notice, please contact Danielle Junod at the email address: contact@example.gov NAVSUP WSS Requests proposals submitted in response to this solicitation remain valid for a minimum of 120 days following submission. All contractual documents related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.1.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: CIRCUIT CARD ASSEMB ;015595129; NSN , ;D0012489-1001; Part Number, Shall be performed IAW: CIRCUIT CARD ASSEMB ;Latest; Publication (s). 1.1.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: CIRCUIT CARD ASSEMB ;D0012489-1001; P/N, ;015595129; NSN, ;Latest; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. CIRCUIT CARD ASSEMB ;THE BOEING COMPANY; Company Name , ;6200 J S MCDONNELL BLVD SAINT LOUIS, MO 63134-1939; Address , ;0PXV4; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

More opportunities from Department Of Defense → Navsup Weapon Systems Support

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS