This Solicitation opportunity from Washington was posted on August 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
5th Ave S Sewer District Extension, Southwest Suburban Sewer District, Burien, WA
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The 5th Ave S Sewer District Extension project in Burien, Washington, managed by the Southwest Suburban Sewer District, involves the installation of approximately 515 linear feet of 8-inch diameter sanitary sewer and two new manholes. The scope includes providing connection points for 13 properties via 510 linear feet of 6-inch side sewer pipe and 15 cleanouts. Additional requirements include the removal of a conifer tree and two stumps to facilitate easement access, as well as the installation of six catch basin inserts for erosion and sedimentation control. The contract also encompasses comprehensive civil sitework, including temporary shoring, excavations, underground utility work, and trench patching. Surface restoration will involve a full-width grind and overlay of approximately 3,420 square yards of HMA paving using 400 tons of material, alongside landscaping, hydroseeding, and fence replacement. The project concludes with the testing and commissioning of the new sanitary sewer system.
General Info
Place of Performance
Burien, WA, 98148, USASet-Aside
Documents
309AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Interested Companies (15)
See All 15 Interested Companies
Start a free trial to view all interested companies, their contact details, and full contractor profiles.
Full Description
1. Installation of approximately 515 LF of new 8-inch diameter sanitary, including connection to the existing sanitary manhole. Installation of two (2) new sanitary manholes.
2. Installation of 6-inch diameter side sewer stubs (and associated cleanouts and fittings) to the property lines to provide a connection point for 13 properties to be served by the new sanitary sewer. Total length of 6-inch side sewer pipe is approximately 510 LF. Installation of 15 side sewer cleanouts.
3. Removal of a 34” conifer tree with stump removed to elevation 1 foot below the bottom of the side sewer pipe, and removal of two (2) stumps to install side sewer to serve 511 S 196th St through easement granted by 19604 5th Ave S.
4. Installation of six (6) catch basin inserts for temporary erosion and sedimentation control.
5. Civil sitework, including temporary shoring and excavations, underground utilities, trench patching, and full-width grind and overlay HMA paving – approximately 3,420 SYD and 400 Tons of HMA, and site restoration including landscaping, hydroseeding, and fence replacement.
6. Testing and Commissioning of new sanitary sewer.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
