Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

6-inch PVC Pressure Pipe Supplier

Open
State & Local
Response DeadlineDue in 35 days

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The El Dorado Irrigation District is seeking a subcontractor to supply 6-inch C900 DR18 PVC pressure pipe and fittings for lift station projects. The required materials must conform to AWWA C-900 Class 150 standards, provided in standard 20-foot lengths with integral bell and elastomeric gasket push-on joints. The selected supplier will be responsible for delivering all pipe and fittings directly to the project site in Shingle Springs. This subcontract opportunity is categorized under NAICS code 326122. The solicitation was posted on November 26, 2026, with a response deadline of December 30, 2026. There is no specified set-aside status for this contract.

General Info

Place of Performance

Shingle Springs, CA, 95682, USA

Set-Aside

NONE

Documents

This scope was carved out of E27-01.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Shingle Springs Lift Station Discharge Piping Upgrade

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 35 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 2 documents on the prime contractFrom Shingle Springs Lift Station Discharge Piping Upgrade
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → El Dorado Irrigation District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies 6-inch C900 DR18 PVC pressure pipe and fittings for prime contractors on El Dorado Irrigation District lift station projects. Furnishes PVC pipe conforming to AWWA C-900 (Class 150) in standard 20-foot lengths with integral bell/elastomeric gasket push-on joints. Delivers PVC pipe and fittings to the project site.

Similar Contracts

Same NAICS industry code

More opportunities from California → El Dorado Irrigation District

Same awarding agency

NAICS: 237110
New
SLED
Shingle Springs Lift Station Discharge Piping Upgrade
Solicitation # E27-01
The Shingle Springs Lift Station Discharge Piping Upgrade, solicitation E27-01, is a construction project for the El Dorado Irrigation District in Shingle Springs, California. The scope of work involves replacing discharge piping, which includes the installation of an upgraded 6-inch PVC force main and tie-ins to the existing Mother Lode Force Main. Key tasks include mobilization, demolition and abandonment of existing piping, installation of 6-inch C900 DR18 PVC and ductile iron pipe, and the construction of a concrete vault and blowoff enclosure. The contractor is responsible for all labor, materials, equipment, permits, and the implementation of a Water Pollution Control Plan. The contract will be awarded to the lowest responsive and responsible bidder, with evaluations based on bidder capability, schedule adherence, safety, professionalism, and past performance. Bidders must submit two separate sealed envelopes and provide a Bidder's Bond, while the successful awardee must furnish Construction Performance and Labor and Material Payment Bonds. The project is designated as public work subject to prevailing wages under Labor Code Section 1771. Compliance requirements include adherence to the Americans with Disabilities Act, Title VI of the Civil Rights Act of 1964, and specific federal regulations for contracts receiving federal funds. There is no set-aside status for this solicitation.
Water and Sewer Line and Related Structures Construction

POSTED

about 6 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
SLED
El Dorado Hills Water Treatment Plant ExpansionThe El Dorado Irrigation District is undertaking a comprehensive modernization and expansion of the El Dorado Hills Water Treatment Plant located in Placerville, California. The project aims to replace aging infrastructure, improve treatment reliability and resilience, and address seasonal source-water challenges from Folsom Lake to ensure compliance with current and future drinking water regulations. The scope includes increasing the operational capacity from 19.5 million gallons per day to 24 million gallons per day, with the installation of infrastructure designed to support a future buildout capacity of up to 31.5 million gallons per day. Key deliverables involve the removal of outdated systems and the installation of new water treatment facilities, piping, electrical systems, a chemical storage and feed facility, a UV disinfection facility, a washwater equalization basin, and a new generator and electrical building. Construction is expected to occur intermittently over a five-year period, with the exact start date contingent upon the availability of grants or alternative financing. The project will be phased to ensure the existing plant remains fully operational throughout the process. Work will require heavy machinery and must adhere to the Universal Building Code, California Building Code seismic design standards, and Stormwater Pollution Prevention Plan requirements. Specialized requirements include strict safety and documentation protocols for controlled blasting to remove subsurface rock, as well as compliance with El Dorado County Air Quality Management District and EPA standards. The project is currently in the forecast stage, with environmental reviews and impact assessments completed to address air quality, biological resources, and noise.
Water and Sewer Line and Related Structures Construction

POSTED

about 2 months ago

DEADLINE

N/A
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS