Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

El Dorado Hills Water Treatment Plant Expansion

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The El Dorado Irrigation District is undertaking a comprehensive modernization and expansion of the El Dorado Hills Water Treatment Plant located in Placerville, California. The project aims to replace aging infrastructure, improve treatment reliability and resilience, and address seasonal source-water challenges from Folsom Lake to ensure compliance with current and future drinking water regulations. The scope includes increasing the operational capacity from 19.5 million gallons per day to 24 million gallons per day, with the installation of infrastructure designed to support a future buildout capacity of up to 31.5 million gallons per day. Key deliverables involve the removal of outdated systems and the installation of new water treatment facilities, piping, electrical systems, a chemical storage and feed facility, a UV disinfection facility, a washwater equalization basin, and a new generator and electrical building. Construction is expected to occur intermittently over a five-year period, with the exact start date contingent upon the availability of grants or alternative financing. The project will be phased to ensure the existing plant remains fully operational throughout the process. Work will require heavy machinery and must adhere to the Universal Building Code, California Building Code seismic design standards, and Stormwater Pollution Prevention Plan requirements. Specialized requirements include strict safety and documentation protocols for controlled blasting to remove subsurface rock, as well as compliance with El Dorado County Air Quality Management District and EPA standards. The project is currently in the forecast stage, with environmental reviews and impact assessments completed to address air quality, biological resources, and noise.

General Info

El Dorado Hills water plant to expand capacity from 19.5 to 24 million gallons daily over five years.

Agency

California → El Dorado Irrigation District

Place of Performance

Francisco Drive and Templeton Drive, Placerville, CA, 95726

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → El Dorado Irrigation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → El Dorado Irrigation District
Office AddressN/A
Contacts
Michael C. BaronEnvironmental Review Analyst

Full Description

Show more
The Project would modernize and expand the existing El Dorado Hills Water Treatment Plant (EDHWTP) to replace aging infrastructure, enhance treatment reliability and resilience, address seasonal source-water challenges from Folsom Lake, and ensure the facility can continue meeting current and future drinking water regulations and demands through upgraded treatment processes and increased operational capacity. The Project would increase authorized capacity from 19.5 million gallons per day (mgd) to 24 mgd, with infrastructure to accommodate a future buildout capacity of up to 31.5 mgd. The Project involves removal of outdated infrastructure and installation of new water treatment facilities, piping, electrical systems, and other associated infrastructure. Project construction will require the use of heavy machinery including dump trucks, cranes, backhoes, concrete trucks, pump trucks, welding equipment, loaders, generators, forklifts, and air compressors. Construction will be phased to allow uninterrupted operation of the existing EDHWTP. Construction would occur intermittently over a five-year period, with the exact commencement date depending upon the availability of grants or other financing.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project focuses on constructing improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and incidentals necessary to furnish, install, commission, and deliver a fully functional system. Key technical requirements include civil and site work such as grading, demolition, saw cutting, and trucking, as well as the installation of concrete structures, concrete pipes, fittings, and welding. Additional specialized services required for the project include electrical work, traffic control, construction surveys, and SWPPP implementation. Norstar Plumbing and Engineering, Inc. is managing the subcontractor solicitation process, specifically seeking certified DBE, MBE, SBE, and WBE subcontractors and suppliers to support the project. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website. Primary points of contact for this solicitation are Nathan Plummer and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, identified as solicitation SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in Belmont, North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, alongside the demolition of existing pumps and piping. The completed facility will feature mechanical and electrical systems, pumps, a generator, odor control equipment, stormwater facilities, and fencing. Additionally, the project requires the installation of new gravity sewers and manholes. The estimated project value is 16,690,000 dollars. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding requirements, including the submission of MWBE Good Faith Efforts and Table A. The project is governed by EJCDC standard general and supplementary conditions, requiring the successful contractor to provide performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines and NEMA standards for electric motors. Administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Bids are due by November 10, 2026, though some documents indicate a deadline of November 12, 2026.
Don Moorhead Construction, Inc.

POSTED

about 9 hours ago

DEADLINE

in 19 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS