Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Site Modifications at the Palmyrita Water Treatment Plant for PFAS Removal

Open
site-modifications-palmyrita-water-treatment-plant-pfas-removal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Site Modifications at the Palmyrita Water Treatment Plant for PFAS Removal project, managed by Garney Pacific, Inc. for the City of Riverside, California, involves the construction and commissioning of a complete PFAS treatment facility. The scope of work includes the procurement and installation of ion exchange pressure vessel systems and media, prefiltration equipment, a booster pump station, and extensive process piping. Additionally, the project requires structural concrete improvements, site civil work such as grading, paving, and drainage, and the installation of electrical systems, SCADA integration, and a backup generator. The contractor is responsible for the full delivery of an operational system, including startup, acceptance testing, operator training, and the preparation of maintenance documentation. This solicitation is set aside for Small Business (SB), including SBA certified Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Women-Owned Small Business (WOSB), and HUBZone Small Business (HUBZone SB). Bidders must provide current DBE certification from an approved entity, and the project specifically seeks participation from MBE, WBE, or SBE certified firms. All subcontractors are required to utilize union labor and adhere to specified minimum wage rates. Bids are due by December 16, 2026, at 2:00 PM PT, with inquiries directed to Alyssa Callaway.

General Info

Garney Pacific will build a PFAS treatment facility for Riverside, California.

Documents

1
PDF, Low prioritysources-sought
Low

Read the document

Due in 23 days

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 23 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 1 solicitation documentRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGarney Pacific, Inc.
Contacts1 person available
OfficeN/A

Full Description

Show more
The Palmyrita Water Treatment Plant Site Modifications for PFAS Removal project consists of furnishing all labor, materials, equipment, and services necessary to construct and commission a complete PFAS treatment facility. Major work includes procurement and installation of ion exchange (IX) pressure vessel systems and media, prefiltration equipment, a booster pump station, structural concrete improvements, and extensive process piping connections to the existing treatment plant and distribution system. The project also includes site civil improvements such as grading, paving, drainage, stormwater treatment features, landscaping, irrigation restoration, access improvements, and traffic control. Additional work encompasses installation of electrical systems, instrumentation and controls, SCADA integration, a backup generator, and all associated control facilities. The contractor will be responsible for startup, commissioning, acceptance testing, operator training, and preparation of operations and maintenance documentation to deliver a fully functional and operational PFAS treatment system integrated with the City's existing water infrastructure.

Similar Contracts

Same NAICS industry code

More opportunities from Garney Pacific, Inc.

Same awarding agency

NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
The Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project in Oakland, California, involves extensive infrastructure improvements for the East Bay Municipal Utility District. The scope of work includes the rehabilitation of covered and open concrete structures, relining or replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additionally, the project requires the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, upgrades to instrumentation and electrical systems, replacement of motor control center components, and modifications to sluice and slide gates. Other key tasks include installing platforms for concrete structures, rerouting sump pump discharge lines, performing excavation and trench work, and surveying reactor areas. This solicitation is a Small Business set-aside, encompassing SBA certified Veteran Owned Small Business, Service-Disabled Veteran Owned Small Business, Women-Owned Small Business, and HUBZone Small Business certifications. Garney Pacific, Inc., a union contractor, is seeking qualified subcontractors for specialized services including lead abatement, metals fabrication, painting and coatings, electrical and instrumentation, trucking and hauling, and FRP reinforcing systems. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

about 2 hours ago

DEADLINE

in 8 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS