Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Concrete and Masonry Work

Open

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of site-modifications-palmyrita-water-treatment-plant-pfas-removal.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Site Modifications at the Palmyrita Water Treatment Plant for PFAS Removal

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 23 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom Site Modifications at the Palmyrita Water Treatment Plant for PFAS Removal
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGarney Pacific, Inc.
ContactsNo contacts available
OfficeN/A
Organization / AgencyGarney Pacific, Inc.
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs masonry and concrete installation for prime contractors on water treatment facility projects. Performs concrete placement and masonry work to create foundations, walls, and masonry structures. Requires union labor. Delivers installed concrete foundations and masonry structures.

Similar Contracts

Same NAICS industry code

NAICS: 238110
New
SLED
DCR-26-HCCC-0013 Temp Sally Port Staircase
Solicitation # B27000826
The Department of Corrections and Rehabilitation for the State of Hawaii is soliciting bids for the installation of temporary pedestrian access and security improvements at the HCCC Main site, specifically adjacent to the Punahele Building and medical container area. The project scope includes the installation of a concrete stair set, a concrete walkway, two pedestrian gates with fence modifications, a removable steel security plate with hardware, and a temporary rain cover or awning. The contractor is responsible for all labor, materials, equipment, and supervision, including mobilization, demolition, and final restoration and cleanup. All work must be performed in accordance with federal, State of Hawaii, County of Hawaii, OSHA, and industry standards, following the owner-provided layout markup. This is a lump sum bid solicitation with a response deadline of December 15, 2026. The contractor must provide a proposed schedule and clearly identify any assumptions, exclusions, and lead times. Required certifications include a general excise tax license from the State of Hawaii, a tax clearance certificate from the State and IRS, and a certificate of compliance from the Department of Labor and Industrial Relations. Payments are issued upon the submission of original invoices certifying that services were performed according to the contract. There is no specified set-aside status for this solicitation.
Department of Corrections and Rehabilitation

POSTED

22 minutes ago

DEADLINE

in 21 days
View Details

More opportunities from Garney Pacific, Inc.

Same awarding agency

NAICS: 237110
New
Site Modifications at the Palmyrita Water Treatment Plant for PFAS Removal
Solicitation # site-modifications-palmyrita-water-treatment-plant-pfas-removal
The Site Modifications at the Palmyrita Water Treatment Plant for PFAS Removal project, managed by Garney Pacific, Inc. for the City of Riverside, California, involves the construction and commissioning of a complete PFAS treatment facility. The scope of work includes the procurement and installation of ion exchange pressure vessel systems and media, prefiltration equipment, a booster pump station, and extensive process piping. Additionally, the project requires structural concrete improvements, site civil work such as grading, paving, and drainage, and the installation of electrical systems, SCADA integration, and a backup generator. The contractor is responsible for the full delivery of an operational system, including startup, acceptance testing, operator training, and the preparation of maintenance documentation. This solicitation is set aside for Small Business (SB), including SBA certified Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Women-Owned Small Business (WOSB), and HUBZone Small Business (HUBZone SB). Bidders must provide current DBE certification from an approved entity, and the project specifically seeks participation from MBE, WBE, or SBE certified firms. All subcontractors are required to utilize union labor and adhere to specified minimum wage rates. Bids are due by December 16, 2026, at 2:00 PM PT, with inquiries directed to Alyssa Callaway.
Water and Sewer Line and Related Structures Construction

POSTED

about 2 hours ago

DEADLINE

in 23 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
The Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project in Oakland, California, involves extensive infrastructure improvements for the East Bay Municipal Utility District. The scope of work includes the rehabilitation of covered and open concrete structures, relining or replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additionally, the project requires the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, upgrades to instrumentation and electrical systems, replacement of motor control center components, and modifications to sluice and slide gates. Other key tasks include installing platforms for concrete structures, rerouting sump pump discharge lines, performing excavation and trench work, and surveying reactor areas. This solicitation is a Small Business set-aside, encompassing SBA certified Veteran Owned Small Business, Service-Disabled Veteran Owned Small Business, Women-Owned Small Business, and HUBZone Small Business certifications. Garney Pacific, Inc., a union contractor, is seeking qualified subcontractors for specialized services including lead abatement, metals fabrication, painting and coatings, electrical and instrumentation, trucking and hauling, and FRP reinforcing systems. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

about 2 hours ago

DEADLINE

in 8 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS