Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Massachusetts was posted on June 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

605276 BEVERLY Bridge Replacement, B-11-001, Bridge Street over Bass River (Hall-Whitaker Bridge)

Closed
BD-27-1030-0H100-0H002-130081State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil infrastructure and construction services. The scope of work includes site preparation tasks such as land surveying, site clearing, subsurface investigation, and storm water pollution prevention, as well as heavy construction activities including tunneling, boring, jacking, micro tunneling, and utility installation. Additional requirements cover finishing work such as asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix, precast concrete, and aggregate. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested firms must submit their responses via the Building Connected system by the bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The Massachusetts Department of Transportation (MassDOT) is soliciting qualifications for the Beverly Bridge Replacement project (Project No. 605276), which involves the design and construction of a new fixed-span bridge to replace the existing nine-span Hall-Whitaker movable bridge over the Bass River in Beverly, Massachusetts. The project aims to increase the roadway profile and vertical clearance over the navigational channel, with a design life of 75 years and a minimum service life of 100 years. The scope of work includes the design and construction of the three-span bridge and approach roadways, full demolition of the existing temporary bridge structure, stormwater drainage improvements, wetland restoration, and hazardous materials remediation. The estimated total project value is approximately 108.76 million dollars. This procurement follows a two-phase Best Value Design-Build process. In the first phase, interested parties submitted Letters of Interest by July 14, 2026, to receive the Request for Qualifications (RFQ) package. Qualified teams must then submit a Statement of Qualifications (SOQ) for evaluation based on technical expertise, previous experience with complex bridge and roadway design, and the ability to implement innovative construction methods. MassDOT intends to shortlist between two and five design-builders for the second phase, which will involve the submission of technical and price proposals. The project is subject to federal and state regulations, including Davis-Bacon Act labor standards, FHWA-1273 contract provisions, and various environmental and civil rights compliance requirements.

General Info

MassDOT to replace Hall-Whitaker Bridge with $108M design-build project due 2030, including environmental restoration and strict qualifications.

Place of Performance

Park Plaza Boston, MA, 02116, USA

Set-Aside

NONE

Documents

33

BD-27-1030-0H100-0H002-130081 Beverly Bridge Replacement RFQ

HTML, High priority: read this first4 pages · rfq
High

BD-27-1030-0H100-0H002-130081 Bid Solicitation

HTML, High priority: read this first3 pages · rfq
High

BD-27-1030-0H100-0H002-130081 Bid Solicitation

HTML, High priority: read this first3 pages · rfq
High

BD-27-1030-0H100-0H002-130081 Bid Solicitation

HTML, High priority: read this first3 pages · rfq
High

BD-27-1030-0H100-0H002-130081 Bid Solicitation

HTML, High priority: read this first3 pages · presolicitation
High

BD-27-1030-0H100-0H002-130081 Bid Solicitation

HTML, High priority: read this first3 pages · rfq
High

BD-27-1030-0H100-0H002-130081 Bid Solicitation - Beverly Bridge Replacement

HTML, High priority: read this first3 pages · rfq
High

BD-27-1030-0H100-0H002-130081 Bid Solicitation - Beverly Bridge Replacement

HTML, High priority: read this first3 pages · rfq
High

BD-27-1030-0H100-0H002-130081 Bid Solicitation - Beverly Bridge Replacement

HTML, High priority: read this first3 pages · rfq
High

BD-27-1030-0H100-0H002-130081 Bid Solicitation for Beverly Bridge Replacement

HTML, High priority: read this first3 pages · rfq
High

BD-27-1030-0H100-0H002-130081 Bid Solicitation for Beverly Bridge Replacement

HTML, High priority: read this first3 pages · rfq
High

BD-27-1030-0H100-0H002-130081 Bid Solicitation for Beverly Bridge Replacement

HTML, High priority: read this first3 pages · rfq
High

BD-27-1030-0H100-0H002-130081 Bid Solicitation for Beverly Bridge Replacement

HTML, High priority: read this first3 pages · rfq
High

BD-27-1030-0H100-0H002-130081 Bid Solicitation RFQ Addenda

HTML, High priority: read this first3 pages · rfq
High

BD-27-1030-0H100-0H002-130081 Bridge Replacement Bid Solicitation

HTML, High priority: read this first3 pages · rfq
High

BD-27-1030-0H100-0H002-130081 Bridge Replacement Design-Build Bid

HTML, High priority: read this first3 pages · rfq
High

BD-27-1030-0H100-0H002-130081 Bridge Replacement Design-Build Bid

HTML, High priority: read this first3 pages · ifb
High

BD-27-1030-0H100-0H002-130081 - Bridge Replacement Design-Build Bid Solicitation

HTML, High priority: read this first3 pages · rfq
High

BD-27-1030-0H100-0H002-130081 Bridge Replacement Design-Build Solicitation

HTML, High priority: read this first3 pages · rfq
High

BD-27-1030-0H100-0H002-130081 Bridge Replacement RFQ

HTML, High priority: read this first3 pages · rfq
High

BD-27-1030-0H100-0H002-130081 Bridge Replacement RFQ

HTML, High priority: read this firstrfq
High

BD-27-1030-0H100-0H002-130081 Bridge Replacement RFQ

HTML, High priority: read this first4 pages · rfq
High

BD-27-1030-0H100-0H002-130081 RFQ Addenda for Beverly Bridge Replacement

HTML, High priority: read this firstrfq
High

BD-27-1030-0H100-0H002-130081 RFQ / Bid Solicitation

HTML, High priority: read this first3 pages · rfq
High

BEVERLY Bridge Replacement Design-Build Announcement #605276

PDF, High priority: read this first3 pages · presolicitation
High

Bid Solicitation BD-27-1030-0H100-0H002-130081

HTML, High priority: read this first3 pages · rfq
High

MassDOT Bridge Replacement B-11-001 RFQ July 15, 2026

PDF, High priority: read this first114 pages · rfq
High

MassDOT Design-Build Project Request for Letters of Interest - Beverly Bridge Replacement

PDF, High priority: read this first4 pages · sources-sought
High

RFQ Addendum 1 for BEVERLY Bridge Replacement Design-Build

PDF, High priority: read this first18 pages · amendment
High

RFQ Addendum 2 for Beverly Bridge Replacement Design-Build Project 605276

PDF, High priority: read this first32 pages · amendment
High

RFQ Addendum 3 for BEVERLY Bridge Replacement Design-Build

PDF, High priority: read this first3 pages · amendment
High

RFQ Addendum No. 4 for Beverly Bridge Replacement Project 605276

PDF, High priority: read this first3 pages · amendment
High

BEVERLY Bridge Replacement Design-Build Proposer List 07-15-2026

PDF, Low priority3 pages · proposer-list
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Sep 1, 2026 to Aug 18, 2026.

Deadline changed

Response deadline changed from Aug 18, 2026 to Jul 14, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → 0H100 - HIGHWAY
Contacts1 person available
OfficePark Plaza Boston, MA, 02116, USA
Office AddressPark Plaza Boston, MA, 02116, USA
Contacts
Alex DengPurchaser

Full Description

Show more
The Massachusetts Department of Transportation (MassDOT) is soliciting Letters of Interest from parties interested in the Request for Qualifications (RFQ) package for this Design-Build Project

More opportunities from Massachusetts → 0H100 - HIGHWAY

Same awarding agency

NAICS: 236220
SLED
616378 DISTRICT 1 Scheduled & Emergency Facility and Salt Shed Repairs/ Improvements at Various Lo
Solicitation # BD-27-1030-0H100-0H002-134567
The Massachusetts Department of Transportation Highway Division is soliciting bids for Project 616378, which involves scheduled and emergency facility and salt shed repairs and improvements at various locations within District 1. This open market project has an estimated total value of $326,000.00 and is eligible for the Small Business Purchasing Program. The scope of work encompasses general building construction and requires various trades, including laborers, electricians, plumbers, and HVAC technicians, all of whom must adhere to prevailing wage rates and 2026 Standard Specifications for Highways and Bridges. Bids are due by November 10, 2026, and must be submitted electronically via bidx.com; the solicitation explicitly warns bidders not to use COMMBUYS for submission. To be eligible, contractors must possess a valid MassDOT vendor code and be certified by the Division of Capital Asset Management and Maintenance in the General Building Construction category. Required submission documents include a 5 percent proposal guaranty, a DCAMM Prime/General Contractor Certificate of Eligibility, a signed Prime/General Contractor Update Statement, and Document B00521. Additionally, prospective bidders must obtain approval from the MassDOT Director of Prequalification using Request Proposal Form R109.
Commercial and Institutional Building Construction

POSTED

10 days ago

DEADLINE

in 12 days
View Details
NAICS: 236220
SLED
616471 DISTRICT 2 Scheduled and Emergency Salt Shed Repairs at Various Locations
Solicitation # BD-27-1030-0H100-0H002-134568
The Massachusetts Department of Transportation Highway Division is soliciting open market bids for project 616471, which involves scheduled and emergency salt shed repairs at various locations across District 2. The estimated total value of the project is 340,000.00 dollars. Bids must be submitted electronically via bidx.com by November 10, 2026, at 2:00 PM, and the solicitation explicitly states that COMMBUYS should not be used for bidding. The scope of work is categorized under general building construction and includes 17 specific depot locations, with requirements for daily force account reporting and adherence to 2026 standard specifications. To be eligible, bidders must be certified by the Division of Capital Management and Maintenance in the General Building Construction category and possess a valid MassDOT vendor code. Required submission documents include a DCAMM Prime/General Contractor Certificate of Eligibility, a signed Prime/General Contractor Update Statement, Document B00521 Form for General Bid, and a proposal guaranty equal to 5 percent of the bid value. The project is subject to Massachusetts General Laws Chapter 149, prevailing wage rates, and Architectural Access Board regulations. Additionally, contractors must comply with MassDOT policy directives regarding construction staging and the off-site stockpiling of soil.
Commercial and Institutional Building Construction

POSTED

10 days ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS