This Solicitation opportunity from Massachusetts was posted on February 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
TXT, High priority: read this first3 pages · specifications
HighAI Summary for 608514 - Temporary Bridge Construction, B-11-001: Bid items list for project 608514, Temporary Bridge Construction (B-11-001, Bridge Street over Bass River) in Beverly. The document provides a detailed schedule of quantities, units, and item numbers for construction activities including excavation, drainage, paving, and electrical work.
PDF
PDF, High priority: read this firstpresolicitation
HighAI Summary for 608514 - Temporary Bridge Construction, B-11-001: Notice to Contractors issued by MassDOT on February 22, 2025, for the Temporary Bridge Construction of the Hall-Whitaker Drawbridge (Project 608514). The project value is $27,811,000.00 with a bid deadline of April 29, 2025. It specifies electronic submission via Bid Express, requires pre-qualification in the BRIDGE-CONSTRUCTION category, and outlines a 5% proposal guaranty and applicable price adjustments for materials.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for A00801 Special Provisions - Beverly Temporary Bridge Construction (B-11-001): Special Provisions for the construction of a temporary bridge and demolition of the existing Hall-Whitaker bridge over the Bass River in Beverly, MA. The document outlines the scope of work, labor participation goals (15.3% minority, 6.9% women), insurance requirements including asbestos liability, and specific holiday work restrictions. It specifies compliance with 2024 Standard Specifications for Highways and Bridges and provides instructions for bidder questions.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for A00802 Detail Sheets - Temp Bridge Replacement (Beverly, MA): Technical detail sheets and preliminary estimate of quantities for the Massachusetts Department of Transportation Highway Division's Temp Bridge Replacement project in Beverly, MA (2025). The document specifies material quantities for Superpave pavement, concrete sidewalks, and excavation, as well as detailed installation and location data for drainage structures, manholes, and tree protection items.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for A00815 Work Zone Safety Temporary Traffic Control Guide: A technical guidance document providing standards and typical illustrations for planning and installing temporary traffic controls for short-term construction, maintenance, and utility work (10 hours or less). It includes a comprehensive sheet index of stationary, mobile, and emergency response operations, and references FHWA MUTCD and MassDOT standards for safety and device placement.
PDF
PDF, High priority: read this firstspecial-notice
HighAI Summary for A00841 - Water Quality Certificate Review (Bridge Street over Bass River): A notice from the Massachusetts Department of Environmental Protection (MassDEP) regarding the Administrative Completeness and Technical Deficiency Review for Water Quality Certification application 24-WW08-0025-APP. The document identifies a missing proof of public notice and lists 10 specific technical deficiencies related to dredging quantities, DMF consultation, turbidity monitoring, and contaminated sediment containment that must be addressed before certification can be issued.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for A00844 - Amended Water Quality Certificate (MassDOT Project 608514): This document is an amended 401 Water Quality Certification issued by the Massachusetts Department of Environmental Protection (MassDEP) to the Massachusetts Department of Transportation (MassDOT). It modifies Special Conditions 14, 17, 20, and 28 of the original November 27, 2024 certification for the temporary bridge replacement of Bridge B-11-001 (Hall-Whitaker Bridge) over the Bass River in Beverly, MA. The amendments clarify roles regarding erosion control inspections, flood contingency monitoring, spill containment, and environmental health and safety plans for sediment handling.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for MassDEP Amended 401 Water Quality Certification - Project 608514: This document is an amended 401 Water Quality Certification issued by the Massachusetts Department of Environmental Protection (MassDEP) to MassDOT for the Hall-Whitaker Bridge replacement project (Project #608514). It modifies Special Conditions 14, 17, 20, and 28 regarding erosion control, flood monitoring, spill containment, and environmental health and safety plans for sediment handling. The amendment follows a request from MassDOT dated December 6, 2024.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Project 608514 - Geotechnical Report for Temporary Bridge B-11-001(T): Geotechnical report (5th Revision, 2/15/2025) prepared by Lamson Engineering Corporation for VHB and MassDOT. The document provides subsurface conditions and foundation recommendations for a temporary prefabricated truss bridge and modular retaining wall at Bridge Street over Bass River in Beverly, MA. It specifies the use of 24-inch diameter steel pipe piles driven to bedrock and provides estimated pile tip elevations and structural resistance values.
PDF
PDF, Low priorityother
LowAI Summary for 401 WQC Application 24-WW08-0025-APP Response: A response letter dated November 8, 2024, from VHB on behalf of MassDOT to the Massachusetts Department of Environmental Protection (MADEP). The document addresses administrative completeness and technical deficiency reviews for a 401 Water Quality Certification regarding dredging activities for the Bridge Street over the Bass River Temporary Bridge Project, including responses to ten specific comments regarding material quantities, turbidity monitoring, and contaminated sediment management.
PDF
PDF, Low priorityspecifications
LowAI Summary for A00808 Project Utility Coordination Form: A project utility coordination form (Document A00808) containing a table for Utility Re-Opation Phases, Tasks, and Activities. The document consists primarily of a template for listing various project phases.
PDF
PDF, Low priorityother
LowAI Summary for A00820 - MassDOT AutoCAD Files Release Request Form: A request form for the release of AutoCAD files from the Massachusetts Department of Transportation (MassDOT) for Project 608514 (Temporary Bridge Construction, Bridge Street over Bass River). The document outlines the conditions of custody, disclaimers regarding data accuracy, and requires a signature to acknowledge that conformed contract documents remain the only legal records.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for A00848 - USFWS NLAA Concurrence Verification Letter (MassDOT 608514): A concurrence letter dated December 2, 2024, from the U.S. Fish and Wildlife Service (USFWS) to the Massachusetts Department of Transportation (MassDOT). The letter verifies that the demolition of Bridge B-11-001 and construction of a temporary bridge over the Bass River in Beverly, MA, may affect but is not likely to adversely affect the federally endangered northern long-eared bat and tricolored bat, provided specific time-of-year restrictions and conservation measures are followed.
PDF
PDF, Low prioritydetermination-and-findings
LowAI Summary for A00854 - MA Office of Coastal Zone Management Federal Consistency Determination: Dated November 26, 2024, this document is a Federal Consistency Determination from the Massachusetts Office of Coastal Zone Management (CZM) regarding the Bridge Street Temporary Bridge Project in Beverly. CZM concluded that the proposed construction of an 800-foot temporary bridge over the Bass River falls below the thresholds requiring a formal consistency decision, though federal licenses or permits may still be subject to review.
PDF
PDF, Low priorityplan-holders-list
LowAI Summary for Job 608514 - Plan Holders List: A list of registered plan holders for Job Number 608514, detailing companies that have purchased or acquired project documents. It includes contact information (address, phone, email) and purchase dates for various construction firms such as American Bridge Company, Barletta Heavy Division, and others, with dates ranging from February to April 2025.
PDF
PDF, Low prioritydetermination-and-findings
LowAI Summary for NAE-2023-01810 - USACE General Permit Determination (Beverly Bridge Street): Dated October 10, 2024, this letter from the US Army Corps of Engineers (USACE) New England District informs MassDOT that a Department of the Army authorization is not required for the installation of a temporary bridge and removal of the existing Hall-Whitaker Bridge over the Bass River in Beverly, MA. The determination is based on the 2023 MOU between the USCG and USACE, noting that the USCG has authority for bridge permitting and no discharges of fill are proposed. The letter clarifies that a future application will be required for the permanent replacement bridge.
PDF
PDF, Low priorityother
LowAI Summary for Policy Directives P-22-001 and P-22-002: This document contains two MassDOT Policy Directives. P-22-001 establishes procedures for the off-site stockpiling of soil from construction projects to prevent contamination near residential receptors and control dust. P-22-002 addresses the requirement for contractors to obtain Non-Vehicular Access Permits when using MassDOT property for staging and construction-related operations.
PDF
PDF, Low priority132 pages · other
LowAI Summary for Proposal No. 608514-129544 - U.S. Coast Guard Bridge Permit Application: An application dated January 6, 2025, submitted by the Massachusetts Department of Transportation (MassDOT) to the U.S. Coast Guard for a bridge permit. The request is for the construction of a temporary fixed bridge crossing the Bass River at Bridge Street in Beverly, MA, to serve as a transportation link while the existing Hall-Whitaker Drawbridge is demolished and eventually replaced by a permanent structure.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
1 update
PhaseClosed
Posted
Solicitation
Deadline changed
Response deadline changed from May 28, 2025 to Apr 29, 2025.
Response Deadline
Deadline has passed
Submission Closed