This Solicitation opportunity from Massachusetts was posted on September 8, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
PDF, High priority: read this first16 pages · amendment
HighAI Summary for Addendum No. 1 for ERVING Bridge Replacement Project NHP(BNNHS)-0032(050)X: Addendum No. 1 dated October 9, 2025, for the ERVING Federal Aid Project No. NHP(BNNHS)-0032(050)X Bridge Replacement, E-10-011, Church Street over Keyup Brook. This document transmits revisions to contract documents including questions and responses, a revised table of contents, and updated supplemental specifications dated September 30, 2025. Key changes include modifications to proposal rejection criteria, contract award notification, insurance requirements, and labor provisions including wage and working hours regulations. Contractors are instructed to substitute revised pages and acknowledge this addendum in their proposal submissions.
PDF
PDF, High priority: read this first60 pages · amendment
HighAI Summary for Addendum No. 2 for ERVING Bridge Replacement Project NHP(BNNHS)-0032(050)X: Addendum No. 2 dated October 17, 2025, for the ERVING Federal Aid Project No. NHP(BNNHS)-0032(050)X Bridge Replacement, E-10-011, Church Street over Keyup Brook. This document transmits revisions to contract documents including revised pages, deleted and inserted documents, and responses to bidder questions. Key content includes clarifications on bid items, quantities, construction details, and plan sheet changes. Bidders are instructed to substitute revised pages, delete and insert documents accordingly, and acknowledge this addendum in their proposals.
PDF
PDF, High priority: read this first4 pages · amendment
HighAI Summary for Addendum No. 3 for Proposal 612982-132268 ERVING Bridge Replacement: Addendum No. 3 dated October 21, 2025, for Proposal No. 612982-132268 regarding the Federal Aid Project NHP(BNNHS)-0032(050)X Bridge Replacement, E-10-011, Church Street over Keyup Brook in Erving. This amendment revises the contract documents including the cover page and page 1, postpones the bid opening to October 28, 2025 at 2:00 PM, and provides updated instructions for electronic bid submission via www.bidx.com. It emphasizes the requirement for bidders to have a valid MassDOT vendor code and prequalification in the BRIDGE - CONSTRUCTION category. The project value is $2,158,000.00.
PDF
PDF, High priority: read this first3 pages · presolicitation
HighAI Summary for MassDOT Notice to Contractors for ERVING Federal Aid Project NHP(BNNHS)-0032(050)X: This Notice to Contractors announces the solicitation for electronic proposals for the ERVING Federal Aid Project No. NHP(BNNHS)-0032(050)X, a bridge replacement project on Church Street over Keyup Brook, with a project value of $2,158,000.00. Proposals are due by October 21, 2025, at 2:00 P.M. Bidders must be pre-qualified in the BRIDGE-CONSTRUCTION category and submit bids electronically via bidx.com. The notice includes instructions for obtaining proposal forms, submission requirements, bid bond details, prevailing wage rates, and compliance with federal non-discrimination laws. Price adjustments for materials like asphalt, cement, diesel, gasoline, and steel are specified. The document is dated September 6, 2025, and issued by MassDOT officials.
TXT
TXT, Low priority2 pages · other
LowAI Summary for Bid Items List for Bridge Replacement E-10-011, Church Street over Keyup Brook: This document is a detailed bid items list for the Bridge Replacement project E-10-011 on Church Street over Keyup Brook in Erving. It includes quantities, units, descriptions, and item numbers for various construction and demolition tasks such as clearing and grubbing, excavation, disposal of soil, drainage structure work, paving, signage, and bridge structure work. The list serves as a reference for pricing and scope of work for the contract associated with DB_CONTRACT 132268.
PDF
PDF, Low priority16 pages · other
LowAI Summary for Determination Verification Letter for Proposal 612982-132268 Erving Bridge Replacement: This document is a Determination Verification Letter from the U.S. Fish and Wildlife Service dated February 23, 2024, regarding the Massachusetts Department of Transportation Highway Division Proposal No. 612982-132268 for the Erving Bridge Replacement project. It verifies that the project may rely on the concurrence provided in the amended February 5, 2018, FHWA, FRA, FTA Programmatic Biological Opinion for Transportation Projects within the Range of the Indiana Bat and Northern Long-eared Bat. The letter states the project is 'may affect, but is not likely to adversely affect' these endangered species, requiring consultation under Section 7(a)(2) of the Endangered Species Act. The project involves replacing an existing bridge with a single span precast frame structure. Additional instructions for reporting bat discoveries during construction and consultation requirements for other species are included.
PDF
PDF, Low priority2 pages · other
LowAI Summary for MassDOT Conditions of Custody and AutoCAD File Release Form for Proposal 612982-132268: This document is the Massachusetts Department of Transportation Highway Division's Conditions of Custody and Request for Release of MassDOT AutoCAD Files Form related to Proposal No. 612982-132268 for the Bridge Replacement project E-10-011 on Church Street over Keyup Brook in Erving. It outlines terms and disclaimers regarding the use and distribution of AutoCAD files provided post-contract award, emphasizing that the files are provided "as is" without warranty and that only conformed contract documents are legally binding. The form requires requester information and signature to receive the files.
PDF
PDF, Low priority8 pages · other
LowAI Summary for MassDOT Policy Directive P-22-001 and P-22-002 on Soil Stockpiling and Property Use: This document contains Massachusetts Department of Transportation Highway Division Policy Directives P-22-001 and P-22-002, effective immediately as of 9/23/22. It establishes policies and procedures for off-site stockpiling of soil from MassDOT construction projects, including requirements for soil characterization, storage location approval, distance from residential receptors, and management practices to control dust and contamination. It also addresses the use of MassDOT property for construction staging and related operations, requiring District Office permission per 700 CMR 13.00. The directives emphasize compliance with federal, state, and local regulations and proper notification and documentation procedures.
PDF
PDF, Low priority114 pages · other
LowAI Summary for MassDOT Proposal 612982-132268 Army Corps General Permit Verification: This document is a General Permit verification letter from the U.S. Army Corps of Engineers, New England District, for Massachusetts Department of Transportation Highway Division Proposal No. 612982-132268. It authorizes the replacement of the Church Street bridge over Keyup Brook in Erving, Massachusetts, under General Permit 23 dated June 2, 2023. The verification is valid until June 1, 2028, with work completion by June 1, 2029. The letter includes project-specific special conditions, Work-Start Notification and Compliance Certification forms, and references a conditioned Water Quality Certification by the Massachusetts Department of Environmental Protection. The document outlines permit compliance requirements and contact information for the project manager.
PDF
PDF, Low priority194 pages · other
LowAI Summary for MassDOT Proposal 612982-132268 - Army Corps Permit Application Response: This document is a response letter regarding the Army Corps of Engineers permit application for the Church Street Bridge Replacement over Keyup Brook in Erving, Massachusetts, under MassDOT Proposal No. 612982-132268. It includes requests for additional information to complete the application, such as cross-section views of rip-rap scour protection, temporary impact areas for cofferdams, and effect determination for the tricolored bat species. The letter references coordination with environmental agencies and provides contact information for project managers. The document is dated around May-June 2024 and includes technical and regulatory details related to the permit process.
PDF
PDF, Low priority28 pages · other
LowAI Summary for MassDOT Proposal 612982-132268 Northern Long-Eared Bat Acoustic Survey Report: This document is a report prepared for the Massachusetts Department of Transportation (MassDOT) regarding the Northern Long-Eared Bat (NLEB) presence/absence acoustic survey and bridge assessment for the Erving Bridge Replacement project (MassDOT #612982). Conducted by Stantec Consulting Services Inc., the survey took place in June 2023 following US Fish and Wildlife Service guidelines. The report details survey methods, dates, and results, indicating no detection of NLEB but presence of other bat species. The bridge assessment found no signs of bats. The report is dated November 3, 2023, and includes attachments of the survey and bridge assessment reports.
PDF
PDF, Low priority6 pages · other
LowAI Summary for MassDOT Proposal 612982-132268 Project Utility Coordination Form A00808: This document is the Project Utility Coordination Form (Document A00808) for Massachusetts Department of Transportation Proposal No. 612982-132268. It details utility coordination for a highway division project including utility contacts, relocation sequences, estimated durations, and access restraints. The form includes information on utility companies involved, tasks, phases, and notes for contractor coordination and scheduling. The document is dated 12/23/2024 and provides planning details for utility relocations related to bridge and street work in Erving, Massachusetts.
PDF
PDF, Low priority14 pages · contract-document
LowAI Summary for MassDOT Proposal 612982-132268 Water Quality Certificate: This document is a Water Quality Certificate issued by the Massachusetts Department of Environmental Protection for the Massachusetts Department of Transportation Highway Division Proposal No. 612982-132268 dated October 7, 2024. It certifies that the proposed Church Street Bridge replacement project over Keyup Brook in Erving, Massachusetts, complies with state and federal water quality standards under the Clean Water Act. The project involves removing and replacing the existing bridge superstructure, repairing retaining walls, and implementing stormwater drainage improvements and streambed restoration. The certificate details environmental impacts, mitigation measures, and special conditions to ensure protection of water quality and wetlands during construction.
PDF
PDF, Low priority2 pages · other
LowAI Summary for MassDOT Watering Log A00811 Proposal 612982-132268: This document is a Watering Log (Document A00811) for MassDOT Plantings under Proposal No. 612982-132268. It provides instructions for maintaining separate watering logs for different plant areas, specifying minimum watering amounts for trees and shrubs, and recording rainfall events. The log is to be submitted weekly to the MassDOT Engineer. The document includes fields for dates, watering details, contractor and prime contractor initials, and notes on plant locations.
PDF
PDF, Low priority3 pages · other
LowAI Summary for Plan Holders List for Job Number 612982: This document is a Plan Holders List for Job Number 612982. It contains contact information for various contractors and companies who have purchased or shown interest in the project, including names, locations, telephone and fax numbers, emails, purchase dates, and book prices. The list is organized by company and includes multiple entries with updated contact details. The document serves as a record of entities involved or interested in the procurement process for this job.
PDF
PDF, Low priority8 pages · other
LowAI Summary for Proposal 612982-132268 PS&E Estimate of Quantities Detail Sheet: This document is a Proposal No. 612982-132268 from the Massachusetts Department of Transportation for a bridge replacement project on Church Street in Erving, year 2025. It contains detailed sheets of PS&E (Plans, Specifications, and Estimates) including quantities and descriptions of construction items such as earth excavation, pavement layers, drainage structures, sanitary sewer manholes, guardrails, curbs, and traffic signs. The document provides station offsets, item numbers, and specifications for various construction components and work to be performed.
PDF
PDF, Low priority170 pages · contract-document
LowAI Summary for Proposal No. 612982-132268 Bridge Replacement Special Provisions: This document contains the special provisions for Proposal No. 612982-132268 concerning the bridge replacement project E-10-011 on Church Street over Keyup Brook in Erving, MA. It outlines labor participation goals, scope of work including removal and replacement of the existing bridge with a new precast concrete frame, insurance requirements, contractor question procedures, soil stockpiling directives, contaminated soil handling, public safety and convenience measures including traffic control and work hours, truck safety device requirements, and holiday work restrictions. The document references various standards and specifications effective as of 2025 and includes detailed project and safety instructions.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
1 update
PhaseClosed
Posted
Solicitation
Notice updated
Response deadline changed from Oct 28, 2025 to Oct 21, 2025. The point of contact changed.
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.