This Solicitation opportunity from Massachusetts was posted on November 3, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
614023 DISTRICT 1 Scheduled and Emergency Bridge Repairs at Various Locations on I-90 (Western Tur
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Massachusetts Department of Transportation (MassDOT) is soliciting proposals for a project designated as 614023, involving scheduled and emergency bridge repairs at various locations along I-90 (Western Turnpike) in District 1, Massachusetts. The project has an estimated value of $842,000 and requires bidders to be pre-qualified specifically in the BRIDGE-CONSTRUCTION category. Proposals must be submitted electronically through the bidx.com platform by December 9, 2025, at 2:00 PM, with no alternative submission methods accepted. The contract emphasizes strict compliance with Massachusetts laws, including Chapter 30 § 39M and the Architectural Access Board regulations, and mandates adherence to prevailing wage requirements. Bidders are required to provide a 5% bid bond and submit a Request Proposal Form (R109) for approval, ensuring they meet all pre-qualification and documentation standards. The scope of work encompasses both scheduled and emergency repairs across multiple bridge sites, with performance and inspection conducted at the various locations on I-90. The contract incorporates provisions for price adjustments related to key materials such as asphalt, cement, fuel, and steel, based on specified base prices and adjustment formulas. While the detailed evaluation criteria are not explicitly outlined, the procurement is likely based on the lowest responsible bid, given the legal framework referenced. The contract does not specify detailed delivery timelines or performance periods, nor does it include explicit instructions for packaging, marking, or detailed evaluation factors. Overall, the project emphasizes regulatory compliance, transparency in bid submission, and adherence to established standards for safety, accessibility, and quality in bridge repair activities.
General Info
Place of Performance
Set-Aside
Documents
14AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 8 days
- Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 12 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
More opportunities from Massachusetts Department of Transportation
Same awarding agency
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
