Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Massachusetts was posted on September 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

616276 FOXBOROUGH-MIDDLEBOROUGH-NORTON FAP No. STP(BR-OFF)-004S(017)X Bridge Preservation along I-

Closed
BD-27-1030-0H100-0H002-133657State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. This comprehensive infrastructure project requires a wide array of specialized services and materials, including site preparation, land surveying, subsurface investigation, and shoring. The scope further extends to complex pipeline and utility work such as tunneling, boring, jacking, micro tunneling, and the installation of cathodic protection and steel casing. Additional requirements include surface work like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, as well as the supply of ready mix, precast concrete, and manhole materials. The solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must hold a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Kiewit also emphasizes the importance of labor harmony and notes its existing collective bargaining agreements with several trade unions. Interested parties must submit their quotes by November 18, 2025, via the Building Connected system.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 10 days
NAICS: 237310
New
SLED
Katella Ave & State College Blvd Rehabilitation Project
Solicitation # RCP2025-23565
The Katella Ave and State College Blvd Rehabilitation Project (RCP2025-23565) is a public works initiative by the City of Anaheim with an estimated construction cost of $4,213,400. The scope of work involves the removal and reconstruction of asphalt concrete pavement using rubberized asphalt concrete within the existing right of way on Katella Ave from Auburn Way to Douglass Rd and State College Blvd from Katella Ave to Gene Autry Way. Additional infrastructure improvements include the reconstruction of ADA access ramps, sidewalks, curb and gutter, and the adjustment of utility pull-boxes and traffic detection devices, as well as the installation of signage and pavement markings. The project must be completed within 70 working days from the Notice to Proceed. Contractors must hold a General Engineering (A) license and be registered with the Department of Industrial Relations. A key requirement is compliance with the Community Workforce Agreement, requiring the awarded contractor and all subcontractors to sign a Letter of Assent. Bids are evaluated based on the lowest responsive Total Base Bid Proposal submitted via OpenGov, with a required 10% bid bond. Performance is subject to strict work hour constraints, specifically between 10:00 p.m. and 5:00 a.m. for work affecting Caltrans right-of-way. The contract also mandates adherence to MUTCD standards for traffic control and ANSI/TIA/EIA standards for fiber optic installations.
Public Works

POSTED

about 20 hours ago

DEADLINE

in 5 days
NAICS: 237310
New
SLED
Weatherford Parking Lot Replacement
Solicitation # 405-26R0027374
The Texas Department of Public Safety is soliciting bids for the Weatherford Parking Lot Replacement at the Weatherford Highway Patrol and Driver License Office. This turnkey project involves milling all existing asphalt surfaces to a minimum depth of 2.5 inches, repairing soft areas and potholes with base compaction to 98 percent, and installing new asphalt to a minimum finished depth of 2.5 inches. The scope also includes the removal, painting, and resetting of wheel stops, as well as full restriping of the lot, including fire lanes and handicap markings. All work must be performed by qualified craft persons with at least three years of experience and must comply with state and local codes. Electronic responses are due by November 13, 2026, at 5:00 P.M. CT via email or the DPS Online Bid Room. Bids will be evaluated based on responsiveness and past performance, with the award going to the responsible bidder representing the best value. Required submission volumes include contract forms, an information bid section with key personnel resumes, a subcontracting plan for contracts over 100,000 dollars, and a mandatory pricing schedule. Performance and payment bonds are required for contracts exceeding 100,000 dollars and 25,000 dollars, respectively. The contractor must provide a work phasing plan to ensure safe building access, including off-hours work, and adhere to prevailing wage rates per Texas Government Code Chapter 2258.
Department of Public Safety

POSTED

about 23 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The Massachusetts Department of Transportation is soliciting open market bids for Project 616276, which involves bridge preservation and repair services along I-495 across Foxborough, Middleborough, and Norton. The project focuses on structures F-06-023, M-18-042, M-18-043, N-23-026, N-23-027, and N-23-034. The estimated total project value is $9,271,000.00. The scope of work includes structural steel repairs, concrete excavation, pavement milling, and the application of protective coatings. Bidders must be pre-qualified in either the BRIDGE-CONSTRUCTION or PAINTING STRUCTURAL categories and are required to provide a 5% proposal guaranty. Proposals must be submitted electronically via bidx.com, as paper copies and submissions through COMMBUYS are strictly prohibited. While the original deadline was October 27, 2026, subsequent addenda postponed the bid opening to November 3, 2026, at 2:00 PM. Key contract requirements include adherence to the Build America Buy America Act, prevailing wage rates, and ADA compliance for work zone access. Notably, Addendum 4 reduced the contractor's required self-performance from 50% to 30% of the original total contract price. Contractors are also responsible for identifying asbestos-containing materials and managing off-site soil stockpiling in accordance with MassDOT policy directives.

General Info

MassDOT seeks bids for $9.27M bridge repairs on I-495 due November 3, 2026.

Place of Performance

Park Plaza Boston, MA, 02116, USA

Set-Aside

NONE

Documents

64
PDF, High priority: read this firstitb
High
PDF, High priority: read this first3 pages · amendment
High
PDF, High priority: read this first4 pages · amendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this first7 pages · amendment
High
PDF, High priority: read this first9 pages · amendment
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · rfb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · rfb
High
HTML, High priority: read this first3 pages · rfb
High
HTML, High priority: read this first4 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · rfb
High
TXT, High priority: read this first2 pages · specifications
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · rfq
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · rfq
High
HTML, High priority: read this first3 pages · rfp
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · rfb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · rfb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · rfb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · rfb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · rfb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · rfb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · ifb
High
HTML, High priority: read this first3 pages · rfb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Oct 27, 2026 to Nov 3, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → Department of Transportation
Contacts2 people available
OfficePark Plaza Boston, MA, 02116, USA
Office AddressPark Plaza Boston, MA, 02116, USA
Contacts
Construction UnitContact Person

Full Description

Show more
Do Not Use COMMBUYS to Bid on this Project

More opportunities from Massachusetts → Department of Transportation

Same awarding agency

NAICS: 236220
New
SLED
616457 DISTRICT 3 Scheduled and Emergency Facility and Salt Shed Repairs and Improvements at Vario
Solicitation # BD-27-1030-0H100-0H002-135017
The Massachusetts Department of Transportation is soliciting bids for Project 616457, which involves scheduled and emergency facility and salt shed repairs and improvements at various locations within District 3. This open market solicitation has an estimated total value of 2,840,000.00 dollars, with responses due by November 24, 2026. The scope of work includes base labor and specialized trades such as electrical, HVAC, plumbing, and hoisting engineering, as well as the disposal of treated wood and emergency response services. Bidders are explicitly instructed not to use COMMBUYS to bid on this project and must instead utilize the project bids file attachments folder at bidx.com. To be considered, prime bidders must provide a 5 percent proposal guaranty, a valid DCAMM Prime/General Contractor Certificate of Eligibility, a signed Prime/General Contractor Update Statement, and Document B00521 Form for General Bid. The contract is awarded in accordance with Massachusetts General Laws Chapter 149 Sections 44A through 44H and requires adherence to prevailing wage rates and Architectural Access Board regulations. Additionally, contractors must comply with MassDOT policy directives regarding the off-site stockpiling of soil and the use of state property for construction staging. Special provisions outline penalties for non-response to emergency work and specific technical requirements for concrete compressive strength and O&M manual formatting.
Commercial and Institutional Building Construction

POSTED

5 days ago

DEADLINE

in 17 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS