Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Veterans Affairs was posted on March 19, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

6530--Provide and Install Overbed Ceiling Patient Lifts For New Tulsa Hospital

Closed
36C25924Q0272Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

NAICS

339113 - Surgical Appliance and Supplies Manufacturing

Place of Performance

Department of Veteran Affairs Eastern Oklahoma Healthcare System VA Tulsa CHIP-In Project 440 S. Houston Ave, Tulsa, OK, 74127, USA

Set-Aside

SDVOSBC

Documents

19

52.225-2 Buy American Certificate

DOCX, High priority: read this first1 page · supporting-document
High

623-101-VHIT-IOTA BLDG1 Level 4 Reflected Ceiling Plan

PDF, High priority: read this firstspecifications
High

623-101-VHIT-IOTA BLDG1 Level 5 Reflected Ceiling Plan

PDF, High priority: read this first1 page · specifications
High

623-101-VHIT-IOTA BLDG1 R22-2023 Reflected Ceiling Plan Level 6

PDF, High priority: read this firstspecifications
High

623-101-VHIT-IOTA BLDG1 Reflected Ceiling Plan Level 1

PDF, High priority: read this first1 page · specifications
High

623-101-VHIT-IOTA BLDG1 Reflected Ceiling Plan Level 2

PDF, High priority: read this first1 page · specifications
High

623-101-VHIT-IOTA BLDG1 Reflected Ceiling Plan Lower Level

PDF, High priority: read this firstspecifications
High

Amendment 0001 - Solicitation 36C25924Q0272 (Overbed Ceiling Patient Lifts)

DOCX, High priority: read this first3 pages · amendment
High

Amendment 0002 to RFQ 36C25924Q0272 - Overbed Ceiling Patient Lifts

DOCX, High priority: read this first7 pages · amendment
High

General Decision OK20240028 - Heavy Construction - Tulsa County, OK

PDF, High priority: read this firstwage-determination
High

Reflected Ceiling Plan Level 3 - BLDG1

PDF, High priority: read this first1 page · specifications
High

Reflected Ceiling Plan Level 7

PDF, High priority: read this first1 page · specifications
High

RFQ 36C25924Q0272 - Overbed Ceiling Patient Lifts for New Tulsa Hospital

DOCX, High priority: read this first15 pages · rfq
High

VA Handbook 6500.6 Appendix C - Security/Privacy Language

DOCX, High priority: read this first9 pages · specifications
High

VA Notice of Limitations on Subcontracting - Certificate of Compliance

DOCX, High priority: read this first3 pages · specifications
High

VA Tulsa CHIP-In Project - Overbed Patient Lifts SOW

DOCX, High priority: read this first9 pages · sow
High

VA Tulsa CHIP-In Project - Overbed Patient Lifts SOW

DOCX, High priority: read this first9 pages · sow
High

MicrosoftTeams-image.png

JPG

Pages+from+0+-+Full+Set+w+Bookmarks+-+Ceiling+Heights.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Mar 21, 2024 to Mar 26, 2024. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Network Contract Office 19 (36C259)
Contacts1 person available
OfficeGreenwood Village, CO, 80111, USA
Office AddressGreenwood Village, CO, 80111, USA
Contacts
Natasha HollandContract Specialist

Full Description

Show more
THE PURPOSE OF THIS AMENDMENT 0002 TO RFQ 36C25924Q0272 IS TO ANSWER VENDOR QUESTIONS AND TO EXTEND RFQ RESPONSE. RFQ RESPONSE DATE IS HEREBY EXTENDED TO 03/26/2024 AT 16:00 MT. PLEASE SUBMIT ALL RESPONSES BY THE DEADLINE. VENDOR QUESTIONS AND ANSWERS PROVIDED BELOW: Q1. Finished ceiling heights? A1. Most ceiling heights are 8 feet unless otherwise specified in the drawings with ceiling heights. Q2. What is the support structure? Is this I-beams, concrete, steel bar joist or another material? A2. Concrete, not a single thickness slab as seen in pictures and on the site visit Microsoft teams image Q3. Do you have any other rooms drawings because the ones provided do not contain any room numbers? A3. See Attachment ceiling height drawings Q4. Why was a 500lb motor suggested when the VA s recommendation is a minimum capacity of 550 per 2016 SPHM? A4. Given the applicable section from the 2016 SPHM reads as follows: Overhead Lift System Weight Capacities Overhead lift weight capacities range from around 440 lbs to bariatric/expanded capacity lifts of 1,000 lbs. or more. Specification of 550 - 600 lb. capacity overhead lifts in patient rooms will accommodate the greatest range of all patients. If admissions of patients of size warrant, expanded capacity lifts should be included, in addition to the lower weight capacity lifts. Expanded capacity lifts may also be needed in emergency rooms, ambulance bays, wheelchair fitting rooms, radiology areas where equipment has high capacity, and any other location where patients of size will be assisted. Allow for the estimated percentage of patients served by the facility who need expanded capacity lifts. Assume that the population of patients of size may increase over time. This section reads as a guideline on how to decide the appropriate weight capacities of the lift system and not a specification. Based on this the VA will leave the minimum requirement at 500 lbs for a single motor and 1,000 lbs for dual motors. This can be exceeded if you wish to provide lift with a higher capacity. Q5. Also, in a room 7 x6 an 1000lb system will not be effective there is no functional lift height nor width. We would recommend an 825lb system instead. Is this acceptable? A5. The room is not 7 x 6 these are the dimensions for the recommended H-Track Q6. In radiology they are requesting a 1000lb motor, but from our experience this is a higher weight capacity than the table can support. Has this room been designed to support a 1000lb patient? A6. Plan on providing the 1,000lb motors and rail system Q7. Are there any special requirements for installations in MRI, CT, and Imaging Rooms A7. Yes, don t interfere with equipment to be installed in the rooms. Awarded vendor must design around all other installed equipment. Q8. Will participants receive drawings to properly quote this project? A8. Yes, the ceiling reflected drawings previously provided. Additional drawings will be provided to the successful offeror. Q9. How will installation price be evaluated if there are no clear drawings provided to quote an accurate price before the due date? A9. Sizes and Types of lifts are provided in the Statement of Work, otherwise take data from the site visit offered. More information of evaluation factors are provided in Paragraph K of the solicitation. Q10. What is the clinical importance of having the remote threaded to the side of the motors? A10. Hardwired to prevent signal interference and located such that the remote wires don t interfere with operation of the sling. Q11. Can you allow for remote to be mounted from the bottom of the motor just like the emergency strap? A11. As long is it doesn t prevent a significant hazard for being entangled in the sling. Q12. What is the clinical significance of the Double Traversing Rail system? A12. Being able to assist the patient for movement from the bed to the bathroom without having to transfer the patient to a wheelchair or other mobility device. This solution minimizes the number of transfers required and therefore improves patient and nurse safety. Q13. Will having a single rail system with dual motor capabilities surpass minimum requirements? A13. Single rail systems are specified except for patient rooms where bed to bath transfers are required. Single rail systems in patient rooms will not be acceptable. Q14. Can a single rain system be considered an approved alternate system to the dual rail system? A14. Not for bed to bath transfer in patient rooms. Q15. Can you please extend the bid due date to account for the VA s time to respond to the RFI s? A15. See new quote due date in Amendment 002 Q16. Can each system be described clearer? Especially the rooms with transition portions to bathrooms. A16. No, use what is provided to give your best quote. Q17. Will the VA consider considering nickel metal hydride (NiMH) batteries as an alternative to lead acid batteries for this solicitation? A17. NiMH would be an acceptable solution for this application if the vendor includes an acceptable battery management system that would minimize damage from overcharging or memory issues. Q18. Specifically in the rooms that have transition portions to the bathroom. Will the transition portion (straight rails or 90 degree rails) have to be dual rail to match the dual rail H tracks? Does the system with the straight rail transition require 2 straight rails like the 90 degree transition rooms? For installation purposes, will the dual rail transition portions fit in the door ways? A18. The transition portions should be single rails with dual H tracks over the bed and dual H tracks in the bathroom. Q19. Scope paragraph refers to utility lines of the facility that are to be installed in the future . What kind of utility lines are these, where are they in relation to the concrete deck, and how are they impacting structural attachment of the patient lifts? A19. Varies by install location, water lines, med gas lines, electrical lines, HVAC ducts, etc. The awarded vendor will have to design around the construction. Q20. Lithium Ion batteries offer the following advantages - 150% longer lifespan. Faster charging (charges to full capacity in approximately 2 hours). Improved cycle capacity ranging from 80 cycles at 200lbs to 30 cycles at 600lbs. IEC 60601-1:2005 A1:2012 certification. Industry leading 3 year warranty. Will the VA accept Lithium Ion batteries? If not, what is the rationale for denying them? A20. Fire Safety, explosive if damaged and environmental considerations. Q21. Scope paragraph states odd nature of the structural concrete . It appears this is a standard waffle slab concrete deck, with typical elevation between floor and deck. What is odd about it? Can the VA provide structural plans? A21. The thin sections of the concrete are likely not thick enough to attach any structural members for your support. You will have to design around that. Q22. Threaded rod support structures are standard in the industry and perform equal to pendants. A stamped P.E. structural engineering package will be provided that will take into account all building characteristics, and meet the SWL requirements. Excluding threaded rod only limits competition. Will the VA accept threaded rod? If not, please provide an explanation why. A22. VA will not accept threaded rod on this installation. The methods for installing threaded rod will likely not prevent horizontal deflection of the rails given the angles that you d have to install it. Q23. VA Responses to the RFI questions will be critical for vendors to provide accurate proposals. Will the VA extend the bid date to one full week (7 calendar days) after all RFIs are answered? This will help vendors adjust their proposals if needed, based on the feedback received from the VA. A23. See updated RFQ due date. Q25. What will the lifts be anchored to? A25. Waffled concrete above the rooms Q26. Is the ceiling smooth concrete? A26. No, see answer above Q27. Can you specify in what areas we would need to build a structure, or are able to drill into concrete? A27. No, vendor will need design to fit. Only reflected ceiling drawings will be provided prior to award. Some additional drawing may be provided to the awarded vendor after award. Q28. Is there interstitial space between tiles and lift attachments? If so, can you provide space dimensions from the drop ceiling to deck? A28. Some space between the drop ceiling and the concrete deck. Dimensions vary by room. This area will be very congested with other utilities. Awarded vendor will need to design around this. Q29. Will electricity be provided, or are dedicated circuits to be installed by contractor? A29. Dedicated duplex receptacles above the drop ceiling will be available. Q30. Is this a seismic area? A30. Seismic data for Tulsa, OK is publicly available information. Q31. Can contractors work on weekends? A31. Yes, with approval from the VA and VHiT, LLC, but not guaranteed. Q32. Are there times where no work can take place? A32. During facility construction the building is under the control of VHiT, LLC Q33. How many phases is the VA anticipating? A33. Install rails during construction of the facility as coordinated through the VA. Rough window between January 2025 and August of 2025. Do not deliver lift heads and motors until September of 2025 after the VA receives the facility. Q34. Can contractors establish departmental workflow for installation depending on census/hospital needs, or does the VA have a specific schedule they want to follow? A34. Hospital will be under construction. No departments will be operational during the installation time. Q35 Will storage for material and lifts be provided by the VA? A35. No Q36. Can you provide life safety drawings to show any possible fire walls/smoke barriers? A36. Available Life Safety Drawings will be provided to the awarded vendor. Q37. Will drawings be provided for the ceiling track layout? A37. No, vendor will need to provide drawings after award. Q38. Is lift installation going to be done in hand with construction? If so, can we work to install lift when ceiling grid is being placed? A38. Yes, that is the intent. Awarded vendor will be able to coordinate with the VA and VHiT to work out the best installation time. Q39. Will this be a recessed system of flush mount? A39. Flush mount below the ceiling grid, but kept as close to the grid as possible. Q40. Will any door/frames need to be altered for lift installation? A40. No, see door detail below. Q41. If the quote exceeds 4MB can multiple emails be sent? A41. 4MB is not our data limitation, I ve received emails up to 42MB.

More opportunities from Department Of Veterans Affairs → Network Contract Office 19 (36C259)

Same awarding agency

NAICS: 623220
New
Federal
Q519--554 | Short Term Psychiatric Transitional Housing Long-Term Contract | Base+4
Solicitation # 36C25926Q0497
Solicitation 36C25926Q0497, issued by the Department of Veterans Affairs Network Contracting Office 19, seeks a contractor to provide short-term, transitional residential care and psychiatric step-down services for the Rocky Mountain Regional VA Medical Center in Aurora, Colorado. The scope of work includes the potential use of Mental Health Transitional Living Homes Level I or II. The contract is structured with a base period from December 1, 2026, to November 30, 2027, and four subsequent one-year option periods. Payment is based on an individual bed day of care, defined as the period from 12:00 pm to 11:59 am the following day. The government will award the contract based on the most advantageous offer, evaluating technical capability, regulatory practices including HIPAA and OSHA compliance, and quality assurance programs. Contractors must maintain 24-hour staffing, ensure ADA accessibility, and adhere to strict health and safety codes. Required submissions include three separate volumes covering technical capability, past performance, and price, along with certifications for the Immigration and Nationality Act and Organizational Conflicts of Interest. Performance will be monitored through a Quality Assurance Surveillance Plan involving unannounced site visits, patient satisfaction surveys, and clinical outcome measures.
Residential Mental Health and Substance Abuse Facilities

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 339112
New
Federal
6695--SURGERY GLOBUS INSTRUMENT SET
Solicitation # 36C25927Q0043
The Oklahoma City Veterans Affairs Health Care System requires one complete Globus Medical instrument set for use in neurology and orthopedic spine surgeries. This comprehensive solution must include all necessary components for functionality, such as cables, connectors, and mounts, and must adhere to stainless-steel standard operating procedures. The instruments must be reusable and specifically designed for spinal procedures in the operating room. The contractor must be an expert in the neuro and ortho spine field and is responsible for replacing any malfunctioning or broken items at no cost to the VA for the first 12 months following purchase, coordinating maintenance with the OKC VAHCS Biomedical Engineering Department. This procurement is identified as a sources sought notice under NAICS code 339112 and is set aside for Service-Disabled Veteran-Owned Small Businesses. Deliveries to the Oklahoma City facility are required Monday through Friday between 07:00 and 16:00. The instrument set consists of 35 specific line items, including various pedicle probes, rod templates, ratcheting handles, driver shafts, and taps. Interested vendors must provide a capability statement, business size information, country of origin, and estimated lead times. There are no security accreditation requirements as the contractor will have no access to patient records or restricted hospital areas, and no VA employee training is required.
Surgical and Medical Instrument Manufacturing

POSTED

2 days ago

DEADLINE

in 7 days
View Details
NAICS: 513210
New
Federal
R604--Mail Tracking Service
Solicitation # 36C25927Q0017
Solicitation 36C25927Q0017 is a firm-fixed price contract set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) to provide a web-based package and mail tracking system for the Department of Veterans Affairs. The primary site of performance is the Rocky Mountain Regional VA Medical Center in Aurora, Colorado, specifically within the KS-100 SCMS Warehouse. The system must be capable of processing approximately 250,000 parcels and will initially support up to 12 users. The contractor is responsible for providing all necessary hardware, including one barcode printer, 12 scanners with integrated signature pads, and one mobile device, as well as all associated consumables and routine replacement parts. The software will operate as a standalone system not connected to the VA network, meaning it should be SaaS permitted and will not require integration with internal VA identity management or directory services. The contract consists of a base period from October 30, 2026, to October 29, 2027, with four subsequent one-year options extending the total potential duration to five years and six months. Quotes are due by 14:00 MT on October 30, 2026. Pricing must be comprehensive, including all initial hardware, installation, and implementation costs within the original quote, though the government accepts a higher base-year price to account for these non-recurring expenses. Technical support is required to align with warehouse operating hours of 6:30 a.m. to 2:30 p.m. Award will be based on a comparative analysis of technical capability, price, and past performance, with a strict requirement that offerors be VetCert verified to be eligible for award.
Software Publishers

POSTED

3 days ago

DEADLINE

in about 7 hours
View Details
NAICS: 238110
New
Federal
554-27-117 Conduct Concrete and Civil Site Repairs.
Solicitation # 36C25926Q0826
Solicitation 36C25926Q0826 is a 100 percent set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) to perform concrete and civil site repairs at the Rocky Mountain Regional VA Medical Center in Aurora, Colorado. The project, estimated between 100,000 and 250,000 dollars, involves comprehensive drainage remediation, sidewalk leveling, curb repair, and the removal and replacement of concrete sections to address trip hazards and improve snow removal. The scope of work includes 52 specific repair items and requires strict adherence to VA standards, AIA Construction Guidelines, and Joint Commission Environment of Care Standards. Performance must begin within 10 calendar days of award and be completed within 90 calendar days. The government will award the contract based on best value, evaluating offerors on price, past performance on at least two similar projects of 100,000 dollars or more within the last five years, and safety records, including an Experience Modification Rate (EMR) of 1.0 or less. Contractors must provide a Site Specific Safety Plan and ensure a competent person with a 30-hour OSHA card is on-site at all times. Proposals must be submitted via email to Elia L Ruiz Manzo by November 13, 2026, at 10:00 AM MT, and must include a signed SF-1442, a Limitations on Subcontracting certification, and past performance documentation.
Poured Concrete Foundation and Structure Contractors

POSTED

3 days ago

DEADLINE

in 14 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS