Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Veterans Affairs was posted on July 21, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

658-22-700 EHRM Infrastructure Upgrades Design Salem VA

Closed
36C77622R0097Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
On-Call Structural and Seismic/Disaster Engineering Services
Solicitation # FAS 2026-037
The City of Seattle's Finance and Administrative Services (FAS) Capital Development division is seeking to establish on-call contracts with two qualified professional firms to provide structural and seismic/disaster engineering services. These consultants will provide technical expertise on an as-needed basis for small to medium projects across planning, design, procurement, and construction phases, utilizing delivery methods such as Design-Bid-Build, Job Order Contracting, and the Small Works Roster. The scope of work includes performing structural engineering studies, seismic evaluations, confidence testing, and fall protection design, as well as preparing stamped construction documents, managing permitting, and providing construction administration and inspection for new and existing City facilities. The contract features an initial one-year term with options for four annual renewals, not to exceed a total duration of five years. To be eligible, firms must be licensed to practice in Washington State and the City of Seattle and demonstrate a track record of at least three relevant projects within the last seven years. Selection is based on a weighted evaluation of relevant technical experience (40%), approach and methodology (30%), an inclusion plan for women and minority firms (15%), and past performance (15%). All deliverables must adhere to specific FAS CAD standards and CSI MasterFormat specifications. Payment is processed within 30 calendar days of invoice receipt, with costs based on personnel salary rates and reimbursed direct non-salary expenses.
Finance and Administrative Services

POSTED

about 10 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 11 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 12 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Buckhead CID Livable Centers Initiative Master Plan
Solicitation # 2026-10
The Buckhead Community Improvement District is soliciting proposals for the Buckhead Livable Centers Initiative Master Plan, a project aimed at updating the 2017 LCI plan to improve accessibility, walkability, and transit use. The scope of work focuses on the Buckhead and Lenox MARTA station areas and their connected mixed-use districts. Key deliverables include an existing conditions assessment report, a regulatory code study and audit, and the advancement of both a central gathering place/park plan and a walkable streetscape prototype to 30 percent completion. The total budget for this project is 300,000 dollars, with payments made via monthly invoices and progress reports. The project is funded through the Atlanta Regional Commission’s Livable Centers Initiative program and must adhere to federal regulations 49 CFR Part 18 and 49 CFR Part 26 regarding competitive procurement and Disadvantaged Business Enterprise participation. Additionally, the contractor must comply with the Georgia Security and Immigration Compliance Act and the Clean Air Act Amendments of 1990. The performance period begins with a notice to proceed on December 21, 2026, with a project kickoff in January 2027 and a final completion deadline of November 19, 2027. Selection will be based on the consultant's qualifications, prior experience, proposed approach, and understanding of the local Buckhead context.
Buckhead Community Improvement District

POSTED

about 13 hours ago

DEADLINE

in 16 days

General Info

NAICS

541330 - Engineering Services

Place of Performance

Salem, VA, 24153, USA

Set-Aside

SDVOSBC

Documents

14

36C77622R0097 Attachment 13 - VHA Supplemental Contract Requirements for Combatting COVID

PDF, High priority: read this firstspecifications
High

36C77622R0097+Attachment+01++-+EHRM+Infrastructure+Design+Salem+VA.pdf

PDF

36C77622R0097+Attachment+02+-+VHA+Required+Div+01+Spec+Sections.pdf

PDF

36C77622R0097+Attachment+03+-+VA+OEHRM+Site+Infrastructure+Requirements+2_0.pdf

PDF

36C77622R0097+Attachment+04+-+HEFP+SEP_SOCAMES+6_Design+Alerts+1-8.pdf

PDF

36C77622R0097+Attachment+05+-+Sensitive+Infrastructure+Data+Classification+Memo.pdf

PDF

36C77622R0097+Attachment+06+-+01+32+16_01+EHRM+A-E+CPM+Schedules+-+NOA.pdf

PDF

36C77622R0097+Attachment+07+-+PG+18-15+A-E+Submission+Reqs+Vol+C+-+EHRM.pdf

PDF

36C77622R0097+Attachment+08+-+Seasonal+Influenza+with+Vaccines.pdf

PDF

36C77622R0097+Attachment+09+-+VHA+Directive+1061.pdf

PDF

36C77622R0097+Attachment+10+-+Campus+Map.pdf

PDF

36C77622R0097+Attachment+11+-+Site+Self-Assessments+X-Matrix.xlsx

XLSX

36C77622R0097+Attachment+12+-++Past+Performance+Questionnaire.pdf

PDF

Amendment+0001+-+36C77622R0097.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Pcac Activations (36A776)
Contacts1 person available
OfficeINDEPENDENCE, OH, 44131, USA
Office AddressINDEPENDENCE, OH, 44131, USA

Full Description

Show more
PLEASE CHECK AMENDMENT 0001 PLUBLISHED 07/21/2022 PRESOLICITATION NOTICE THIS IS NOT A REQUEST FOR PROPOSAL. THIS IS A REQUEST FOR STANDARD FORM (SF) 330'S ARCHITECT-ENGINEER QUALIFICATION PACKAGES ONLY. ALL INFORMATION NEEDED TO SUBMIT SF 330 DOCUMENTS IS CONTAINED HEREIN. NO SOLICITATION PACKAGE, TECHNICAL INFORMATION, OR BIDDER/PLAN HOLDER LIST WILL BE ISSUED. THE GOVERNMENT WILL NOT PAY, NOR REIMBURSE ANY COSTS ASSOCIATED WITH RESPONDING TO THIS REQUEST. THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. 1. GENERAL INFORMATION: Veterans Health Administration (VHA) Program Contracting Activity Central (PCAC) is seeking sources and intends to award a firm-fixed price design contract for Architect-Engineering (A-E) services for the development of complete construction documents, which include working drawings, specifications, reports and construction period services for Project # 658-22-700 - Salem VA Medical Center, Salem VA EHRM Infrastructure Upgrades - project located at the Salem VA Medial Center (SVAMC) 1970 Roanoke Blvd Salem, VA 24153. The A-E Services contract that is anticipated to be awarded will be procured in accordance with the Selection of Architects and Engineers Statute [formerly known as the Brooks Architect Engineer Act], Federal Acquisition Regulation Part 36.6 - Architectural and Engineering Services and VA Acquisition Regulation 836.6. In accordance with FAR 36.209 - Construction Contracts with Architect-Engineer Firms, no contract for the construction of a project shall be awarded to the firm that designed the project or its subsidiaries or affiliates, except with the approval of the head of the agency or authorized representative. 2. PROJECT INFORMATION This project is a 100% Set-Aside for Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB). The NAICS Code for this procurement is 541330 - Engineering Services and the annual small business size standard is $16.5M. This project requires a full design team to complete this project. The projected award date for the anticipated A-E contract is on or before October 2022. The anticipated period of performance for completion of design is 262 calendar days after notice to proceed. The magnitude of construction is more than $10,000,000. 3. A-E SELECTION PROCESS: Firms submitting SF 330's in response to this announcement, not later than the closing date and time specified herein and in accordance with submission requirements, will be considered for evaluation. The selection will be made as follows: SF 330s will be evaluated in accordance with the primary selection criteria as stated in this presolicitation notice. These evaluations will determine the most highly qualified firms for this particular requirement. In accordance with FAR 36.602-3-(c), at least three (3) of the most highly qualified firms will then be notified of the Government's intent to hold discussions. All firms not invited to participate in discussions will be notified at this time. Discussions will be held with the most highly qualified firms in the form determined to be most advantageous and economical by the contracting officer. This may include in writing, via phone interview or in-person interview presentations. However, the form of discussions will be the same for all firms. The firms invited to participate in discussions will be notified by email and provided further instructions, to include any questions or topics to address. Following the completion of discussions, the firms will be evaluated and ranked for selection based on the primary and secondary selection criteria (if necessary), and the most highly qualified firm will be selected and subsequently sent the solicitation. The final evaluation and ranking will consider the SF330 submission for each firm, as well as additional information obtained via discussions. A site visit will be authorized for the highest rated firm during the negotiation process. An award will be made as long as the negotiation of rates and hours leads to a fair and reasonable determination of the final contract price. If negotiations are not successful with the highest rated firm, the firm will be notified that negotiations have been terminated. Negotiations will then be initiated with the next highest rated firm, and so on until award can be made. 4. SELECTION CRITERIA: Firms responding to this notice will be evaluated and ranked using the primary and secondary selection criteria listed below. The factors are listed in descending order of importance. The evaluation will consider how each factor is addressed and how it is formatted to coincide with the selection criteria. Primary Selection Criteria: Specialized experience and technical competence (sections F, G and H) in the design of network infrastructure installation, renovations, and/or upgrades to information technology (IT) systems (either as solely IT projects or incorporated into new space/renovation projects). Work shall include networking back bone fiber optics, structured cabling, electrical distribution upgrades, uninterruptable power systems (UPS), electrical bonding, building management systems/building automation systems (BMS/BAS), HVAC, telecommunication room renovations/expansions/relocations, data center reconfiguration, electronic and physical security upgrades, and all such systems and components as may be necessary to achieve project goals. The evaluation may consider other elements such as project phasing to maintain hospital operations during construction, quality control procedures and familiarity with VA Design Guides/Manuals, Master Specifications and other applicable standards. These areas shall be addressed in section H of the SF 330. Additionally, prior experience of the prime and key subcontractors working together on relevant projects, as indicated in section G, will be considered in the evaluation. Offeror shall provide a minimum of 2 (two) but no more than 4 (four) recent and relevant projects to demonstrate its specialized experience and technical competence. - Relevant is defined as those task requirements identified in the RFQ's Scope of Work. - Recent is define as services provided within the past 5 (five) years. Each project shall include the following: Project title, location and detailed narrative describing the scope of services provided including the type of work performed by the offeror and its role in the project i.e. prime contract, Teaming Partner or subcontractor Project Owner, owner's point of contact including telephone number and email address. Services & Deliverables provided under the contract/task order Period of Performance, including start and completion dates Total dollar value of the project. Professional qualifications (sections C through E) necessary for satisfactory performance of required service. The architects and engineers on the firm's staff representing the project or signing/stamping drawings in each discipline must possess a minimum of five (5) years of experience and are required to be licensed, registered or certified by a US state, the District of Columbia or a US territory. Provide professional license jurisdiction of issue and license numbers and/or proof of licensure. At a minimum, the offeror shall describe the professional qualifications and not less than five (5) years of experience in the required disciplines. Disciplines required for this project include, but are not limited to: Architecture, Mechanical, Electrical, Plumbing, Structural, Civil, Fire Protection, Hazardous Material Abatement/Industrial Hygiene, Physical Security (note - must hold the Certified Protection Professional (CPP) or Physical Security Professional (PSP) certification issued by ASIS International), Cost Estimation, and Project Management. The evaluation will consider education, certifications, training, registration, overall and relevant experience and longevity with the firm. Offer must include the following statement of SDVOSB compliance when submitting the personnel proposed to perform the work under this requirement: - I [signatory authority]______________________, [company] __________________ certify that the team proposed to perform under this requirements demonstrates the capability of 50% SDVOSB performance in compliance of 48 CFR 852.219-10. Capacity (section H) to accomplish work in the required time. The following information is required for this factor: The Offeror shall provide the percentage of time personnel referenced under professional qualifications will be dedicated toward this project. The Offeror shall provide the available capacity for personnel listed under professional qualifications (section E). The offeror shall include a draft schedule outlining how they intend to meet the period of performance outlined in the SOW. Draft schedule will not be counted toward the page limitation. The Offeror may include any additional resources that will be dedicated toward this project. The evaluation will consider the firm's plan and ability to meet the schedule of the overall project, as well as the firm's approach to measuring and managing capacity both prior to and during contract performance to ensure qualified personnel are available to meet the contract requirements. Past performance (section H) on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules. CPARS data or PPQs (if no CPARS data is available) must be provided for projects submitted under Factor 1 (Specialized Experience). Please see attached PPQ format. CPARS data and PPQs do not count toward the page limitation. Government Past Performance Information Systems may be accessed. Evaluating past performance and experience may include information provided by the firm, customer inquiries, Government databases, and publicly available sources. Failure to provide requested data, accessible points of contact or valid phone numbers could result in a firm being considered less qualified. The following information is required for all projects: contract/task order number, project title, prime firm, start date, and completion date. Evaluations may also include additional performance related from the firm, customer inquiries, Government databases, publicly available sources, and additional projects in CPARS. Note: We recommend you contact every reference listed and let them know we may contact them for information. Their timely replies would be appreciated. Knowledge of the locality (section H), to include specific knowledge of certain local conditions or project site features, such as geological features, climatic conditions, local construction methods, construction firms and trades labor availability, and local laws and regulations. Experience in construction period services (section H) for projects similar in scope to include professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, and support of construction contract changes to include drafting statements of work, and cost estimates. Secondary Selection Criterion*: Geographic location. Location of the firm, as measured by the driving distance (miles) between the Offeror's principal business location and the: Salem, VA Medical Center 1970 Roanoke Blvd. Salem, VA 24153 Determination of the mileage will be based on Google Maps (https://www.google.com/maps/dir/). * The secondary selection criterion is used as a tiebreaker, if necessary, in ranking the most highly qualified firms following the completion of discussions. The secondary selection criterion will not be applied when determining a firm's SF 330 submission. 5. SUBMISSION REQUIREMENTS: The below information contains the instructions and format that shall be followed for the submission of the SF 330, Statement of Qualifications: Submit ONE (1) SF 330, Statement of Qualifications, via email to the Contract Specialist Emil Reyes Emil contact@example.gov . This shall include SF 330 and any applicable attachments. All responses are due on or before July 22, 2022 at 1:00 PM Eastern Time. The SF 330 shall be submitted in one email and have a file size shall be no larger than 5 MB. No hard copies will be accepted. The subject line of the email shall read: - SF 330 Submission; 36C77622AP0278 - - EHRM Infrastructure Upgrades Salem VA Medical Center Salem, VA The submission must include the SF 330, Architect/Engineer Qualifications (form is available on-line at http://www.cfm.va.gov/contract/ae.asp). The page limitation of the SF 330 shall not exceed a total of 35 pages. This includes title page, table of contents, and any other relevant information. Each page shall be in in Arial size 12 font, single spaced. Part II of the SF 330 and any Contractor Performance Assessment Rating System (CPARS) reports will not count as part of the page limitations. All SF 330 submissions must include the following information either on the SF 330 or by accompanying document: 1) Cage Code; 2) Unique Entity Identifier (UEI); 3) Tax ID Number; 4) The E-mail address and Phone number of the Primary Point of Contact; 5) A copy of the firms Vet Biz Registry. All questions shall be submitted via email to contact@example.gov. NOTE: Only submissions from SDVOSB concerns will be acceptable for this project. In order for an SDVOSB to be considered as a proposed contractor, the firm must be verified and visible by VET Biz (www.vetbiz.gov) and registered in the System for Award Management (SAM) database (www.sam.gov) at time of submission of their qualifications. Failure of a proposed SDVOSB to be verified by the CVE at the time the SF-330 is submitted shall result in elimination from consideration as a proposed contractor. All Joint Ventures must be CVE verified at time of submission and submit agreements that comply with 13CFR 125.15 prior to contract award. SF 330 submissions received after the date and time specified will not be considered. Late proposal rules per FAR 15.208 will be followed for late submittals. Firms not providing the required information may not be evaluated. All information must be included in the SF 330 submission package. It is the offeror's responsibility to check the Contract Opportunities website at: https://.sam.gov/ . for any revisions to this announcement prior to submission of SF 330s. See attached document: 36C77622R0097 Attachment 01 - EHRM Infrastructure Design Salem, VA. See attached document: 36C77622R0097 Attachment 02 - VHA Required Div 01 Spec Sections. See attached document: 36C77622R0097 Attachment 03 - VA OEHRM Site Infrastructure Requirements 2_0. See attached document: 36C77622R0097 Attachment 04 - HEFP SEP_SOCAMES 6_Design Alerts 1-8. See attached document: 36C77622R0097 Attachment 05 - Sensitive Infrastructure Data Classification Memo. See attached document: 36C77622R0097 Attachment 06 - 01 32 16_01 EHRM A-E CPM Schedules - NOA. See attached document: 36C77622R0097 Attachment 07 - PG 18-15 A-E Submission Reqs Vol C - EHRM. See attached document: 36C77622R0097 Attachment 08 - Seasonal Influenza with Vaccines. See attached document: 36C77622R0097 Attachment 09 - VHA Directive 1061. See attached document: 36C77622R0097 Attachment 10 - Campus Map. See attached document: 36C77622R0097 Attachment 11 - Site Self-Assessments X-Matrix. See attached document: 36C77622R0097 Attachment 12 - Past Performance Questionnaire. See attached document: 36C77622R0097 Attachment 13 - VHA Supplemental Contract Requirements for Combatting COVID.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS