Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on July 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

66 ABG/SC Giant Voice RTU Relocation

Closed
FA283526Q0020Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811210
New
SLED
Statewide Standby Generator, ATS & UPS Preventive Maintenance Services
Solicitation # BD-27-1107-FREG5-ACCOU-133129
The Massachusetts Trial Court, through the Office of Court Management, Facilities Management & Capital Planning, is soliciting bids for statewide preventive maintenance, inspection, operational testing, load-bank testing, repair, and emergency services for standby generators, automatic transfer switches, and uninterruptible power supply systems. The contract is structured into five independent regional award groups, with each region being awarded to the lowest responsible and eligible bidder. The initial performance period is 32 months, running from November 1, 2026, to June 30, 2029, with two optional one-year renewals available through June 30, 2031. Bidders must submit their response packages electronically via the COMMBUYS portal by September 30, 2026, including a bid deposit of at least 5 percent of the greatest possible bid amount per region. Award evaluation is based on bid responsiveness, eligibility, and the lowest evaluated regional price, with a requirement that contractors demonstrate the capacity to perform in multiple regions simultaneously if awarded more than one. Contractors must adhere to NFPA 70B, the Massachusetts Comprehensive Fire Safety Code, and the Massachusetts Electrical Code, and are required to provide detailed electronic service reports as a condition of payment. Payments are processed via Electronic Funds Transfer through the Comptroller's system, typically 45 days from invoice receipt.
FREG5 - Facilities Management & Capital Planning - Region V

POSTED

about 21 hours ago

DEADLINE

in 18 days

AI Contract Overview

Show more

The contract involves the relocation of a single Giant Voice Remote Terminal Unit (RTU) from the third floor of Building 1108 at Hanscom Air Force Base, Massachusetts, to a new location on the same installation as part of the base-wide ATI Mass Alert system controlled by two REACT 5000 Central Control Units. The contractor is responsible for all aspects of the move including powering down the unit, physically transporting it, reinstalling it at the new site, re-integrating it into the existing network infrastructure, and restoring it to Full Operational Capability through comprehensive post-move testing and optimization. This encompasses handling all associated RF cabling, network connections, power systems, and grounding infrastructure with precision to ensure system integrity. Attendance at a mandatory site visit scheduled for 30 July 2026 at 9:00 a.m. EST is a strict requirement for technical acceptability; interested parties must register using the provided form and submit it to both the Contract Specialist and Contracting Officer no later than 28 July 2026 at 9:00 a.m. EST. Access to the base on the day of the visit requires arrival by 8:30 a.m. EST at the Visitor Control Center with REAL ID-compliant identification and pre-registered vehicles with proof of insurance, and all personnel must comply with federal prohibitions on marijuana use on installation property. Offers must be submitted electronically via SAM.gov or by email to both specified government contacts no later than 10 August 2026 at 2:00 p.m. ET, and must include a read receipt confirmation. The solicitation is a Total Small Business Set-Aside under NAICS code 811210, limiting eligibility to small businesses, and although no explicit contract type or dollar value is stated, the procedural requirements strongly suggest an LPTA award method. The government retains oversight through the Contracting Officer and Contract Specialist, with acceptance contingent upon successful reintegration and full operational capability verification at the destination site. No specific FAR clauses, packaging standards, or performance timelines are detailed, but compliance with base access rules, technical feasibility confirmed via on-site survey, and submission to both email addresses are non-negotiable conditions for proposal evaluation.

General Info

Relocate Giant Voice Remote Terminal Unit at Hanscom AFB, restore full operational capability, site visit July 23, 2026.

Agency

Department Of Defense → FA2835 Aflcmc Hanscom PziView Agency

NAICS

811210 - Electronic and Precision Equipment Repair and MaintenanceView NAICS

Place of Performance

Hanscom AFB, MA, 01731, USA

Set-Aside

SBA

Documents

(5)

Solicitation FA283526Q0020 - Giant Voice RTU Relocation

PDFrfq

Giant Voice RTU Relocation Performance Work Statement

PDFpws

Wage+Determination+Middlesex+County+June+2026.pdf

PDF

Site Visit Registration Form for Giant Voice

XLSXregistration-form

Amendment 0001 to Solicitation FA283526Q0020

PDFamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Amendment 1

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA2835 Aflcmc Hanscom Pzi
Contacts2 people available
OfficeHANSCOM AFB, MA, 01731-2107, USA
Organization / Agency
Department Of Defense → FA2835 Aflcmc Hanscom Pzi
View Agency Profile
Office AddressHANSCOM AFB, MA, 01731-2107, USA
Contacts
Kennethea Berry

Full Description

Show more

Relocate one (1) Giant Voice (GV) Remote Terminal Unit (RTU) from the 3rd floor of building 1108. This RTU is one of six RTUs that are part of the base-wide ATI Mass Alert system, which is controlled by two Central Control Units (REACT 5000s). The Contractor shall provide all specialized labor, materials, tools, equipment, and supervision required to safely power down, physically transport, re-install, and re-integrate the system. The objective is to ensure the RTU is restored to Full Operational Capability (FOC) in the new location. This includes the proper handling of all associated radio frequency (RF) cabling, network connections, power configurations, and grounding systems, as well as conducting comprehensive post-move testing and optimization to verify system integrity.


NOTE: (Amended) A site visit is scheduled for 30 July 2026 at 9:00am EST at Hanscom AFB, MA. You MUST register prior to attending. Registration to attend the site vist must be provided to kennethea.berry.1@us.af.mil and anthony.coit@us.af.mil, no later than, Tuesday 28 July 2026 at 9:00am, see attached for registration form. 


Attendance at the site visit is mandatory for a quote to be considered technically acceptable.


A physical site survey is critical for this effort. The vendor must personally inspect both the current and future locations of the unit to evaluate the existing infrastructure. Additionally, the vendor must take precise physical measurements for cable lengths and directly assess the available power utilities to ensure technical feasibility.

More opportunities from Department Of Defense → FA2835 Aflcmc Hanscom Pzi

Same awarding agency

NAICS: 561621
New
Federal
Notice of Intent to Sole Source - 6 SWS - Security Archive Workstation 2
Solicitation # 2026-PZI-1801
The U.S. Air Force, through the 6th Space Warning Squadron at Hanscom Air Force Base, intends to award a sole source contract to Honeywell for the repair, configuration, and performance verification of the Security Archive Workstation 2 system. The project focuses on restoring the Honeywell Vindicator V5 2013 edition to fully operational status at Cape Cod Space Force Station, Massachusetts. Key technical issues to be addressed include a locked server access computer and a server failing to meet the minimum two-year data retention requirement. All work must adhere to Original Equipment Manufacturer specifications and site security standards, including the ESE-SIT-0001 guidance for permanent installations. The procurement is structured as a Request for Quote under NAICS code 561621 and is designated as a Total Small Business Set Aside with a size standard of 25 million dollars. The period of performance is 90 days after the date of award. Evaluation is based on technical acceptability and price reasonableness per FAR 13.106-3. Interested parties were required to submit capability statements by September 19, 2026. The contract incorporates various federal regulations, including DFARS cybersecurity requirements and the Service Contract Act for wage determinations in Middlesex County, Massachusetts.
Security Systems Services (except Locksmiths)

POSTED

2 days ago

DEADLINE

in 7 days
View Details
NAICS: 237110
Federal
NBSFS Water Tank Maintenance
Solicitation # FA283526Q0033
Solicitation FA283526Q0033 is a total small business set-aside for the repair, cleaning, and inspection of two underground potable water storage tanks at Buildings 107 and 135 at New Boston Space Force Station in New Hampshire. The scope of work includes cleaning and inspecting the tanks, replacing two valves and associated hardware, and supporting specific tank pumps while ensuring the potable water supply distribution system remains operational. The project must adhere to DoD Building Code UFC 1-200-1, National Sanitation Foundation standards, and various Unified Facilities Guide Specifications. A critical sequencing requirement mandates that Building 135 be cleaned, inspected, and accepted before work on Building 107 begins. The contract is awarded based on the Lowest Price Technically Acceptable (LPTA) method, requiring a technical approach and capability statement to be rated as acceptable. Performance is expected to begin within 30 calendar days of award, with completion within 126 calendar days, though other documents cite a 98-day or 18-week window. Contractors must comply with Davis-Bacon Act wage determinations and provide confined space entry permits. All offers must be emailed to Contracting Officer Kristin Morrison by 12 PM ET on September 17, 2026, and must remain valid for at least 90 days. Payment will be processed electronically through the Wide Area WorkFlow system.
Water and Sewer Line and Related Structures Construction

POSTED

19 days ago

DEADLINE

in 5 days
View Details
NAICS: 811210
Federal
Hanscom AFB, 66 ABG/SC Giant Voice RTO Relocation (Resolicitation)
Solicitation # FA283526Q0035
This firm fixed price contract, solicitation number FA283526C0035, requires the relocation of one Giant Voice Remote Terminal Unit (RTU) within building 1108 at Hanscom Air Force Base, Massachusetts. The contractor is responsible for moving the unit from the penthouse area to a spare office space on the third floor. This RTU is a critical component of the base-wide ATI Mass Alert system, which is managed by two REACT 5000 Central Control Units. The scope of work includes conducting site surveys, developing a cutover and migration plan, performing the physical power down and transport, and completing re-installation and testing to restore full operational capability. The actual relocation is expected to be completed within one business day, with the overall performance period spanning from August 20, 2026, to July 31, 2027. The contract is a total small business set-aside under NAICS code 811210 and will be awarded based on the Lowest Price Technically Acceptable (LPTA) basis. A mandatory site visit is scheduled for September 3, 2026, and attendance is required for a quote to be considered technically acceptable. Vendors must pre-register by August 27, 2026, and attendees must provide REAL ID compliant identification and vehicle documentation to gain base access. Final deliverables include the submission of as-built documentation following a testing and troubleshooting phase. Invoicing and payment will be processed electronically via Wide Area WorkFlow.
Electronic and Precision Equipment Repair and Maintenance

POSTED

23 days ago

DEADLINE

in 10 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS