Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on February 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

66--FREQUENCY REFERENCE, IN REPAIR/MODIFICATION OF

Closed
N0038326QLA63Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334412
New
DIBBS
PRINTED CIRCUIT BOARD
Solicitation # SPE7M5-27-T-1150
Solicitation SPE7M5-27-T-1150 is a request for quotations issued by the DLA Weapons Support Active Devices Division for the procurement of six printed circuit boards, identified by NSN 5998-01-676-5958 and part number 1601P-22-5014-59. The items are designated as critical application items and must comply with specific technical standards, including MIL-PRF-31032, which replaces the inactive MIL-PRF-55110 and MIL-P-50884. Additionally, the contractor must ensure laminate materials are equivalent in quality to the cancelled MIL-S-13949 standard and strictly adhere to the prohibition of intentionally adding mercury or mercury-containing compounds to the hardware. The contract specifies a delivery timeline of 143 days, with a need ship date of March 23, 2027, and an original required delivery date of August 9, 2027. Terms are FOB Origin, with inspection and acceptance occurring at the destination, specifically the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. Packaging and marking must adhere to MIL-STD-2073-1E and MIL-STD-129, with palletization following RP001 requirements. Administrative requirements include electronic invoicing via the Wide Area WorkFlow system and compliance with the Buy American and Balance of Payments Program under DFARS 252.225-7001. All quotes must be submitted electronically through the DLA Internet Bid Board System.
DLA WEAPONS SUPPORT ACTIVE DEVICES DIVISION

POSTED

1 day ago

DEADLINE

in 10 days
NAICS: 334412
New
DIBBS
CIRCUIT CARD ASSEMBLY
Solicitation # SPE7M1-27-T-0424
Solicitation SPE7M1-27-T-0424 is a request for quotations issued by the DLA Weapons Support Maritime Supply Chain for the procurement of six circuit card assemblies, identified by NSN 5998-01-696-1448 and Oshkosh Aerotech part number 2915851. The procurement falls under NAICS code 334412 and is being conducted via the First Destination Transportation program to optimize shipping costs. The need ship date is May 20, 2027, with a final required delivery date of October 31, 2027. Delivery is set as FOB Origin, with both inspection and acceptance occurring at the destination, specifically DLA Distribution San Joaquin in Tracy, California. The contract mandates strict adherence to the DLA Master List of Technical and Quality Requirements, MIL-STD-129 for marking and labeling, and RP001 for palletization. Packaging must comply with ASTM D3951, and any hazardous materials must be labeled according to the Hazard Communication Standard. Administratively, the contractor is required to use the Wide Area WorkFlow system for electronic invoicing and receiving reports. The solicitation incorporates various FAR and DFARS clauses, including requirements for the Buy American Act, safeguarding covered defense information, and combating trafficking in persons. Award may be automated, and a price evaluation preference is available for HUBZone concerns.
DLA WEAPONS SUPPORT MARITIME SUPPLY CHAIN

POSTED

1 day ago

DEADLINE

in 2 days
NAICS: 334412
New
DIBBS
CIRCUIT CARD ASSEMBLY
Solicitation # SPE7M1-27-Q-0077
Solicitation SPE7M1-27-Q-0077 is a request for quotations issued by the DLA Weapons Support Maritime Supply Chain for the procurement of two circuit card assemblies under NSN 5998-01-708-8627. The requirement specifies compatible part numbers from Electric Boat Corporation (218106615 and EB-5579-3) and TEWS Technologies LLC (TVME200-52R). This is a firm fixed price procurement with a customer required delivery date of August 30, 2027, and a delivery lead time of 210 days after order. The items are to be delivered to the DLA Distribution DDSP New Cumberland facility in Pennsylvania, with both inspection and acceptance occurring at the destination. The contract is not a small business set-aside and falls under NAICS code 334412. Award will be based on the best value to the government, evaluating price, offered delivery, and past performance. Strict compliance is required for packaging and marking per MIL-STD-2073-1E and MIL-STD-129, and palletization must follow RP001 standards. Additionally, the procurement prohibits items manufactured or delivered from a covered nation and requires the use of the Wide Area WorkFlow system for electronic invoicing and payment. Offerors must submit their quotations by November 3, 2026, and provide necessary representations and certifications regarding security prohibitions and telecommunications equipment.
DLA WEAPONS SUPPORT MARITIME SUPPLY CHAIN

POSTED

1 day ago

DEADLINE

in 14 days
NAICS: 334412
New
Federal
CIRCUIT CARD ASSEMB
Solicitation # SPRMM126QHD24
This solicitation, issued by DLA Mechanicsburg under SEPA-EAF Authority, seeks the procurement of a Circuit Card Assembly (NIIN 012647608). The required item must conform to the design represented by Cage Code 53711, reference number 6127637, and must be physically identified in accordance with MIL-STD-130. Award will be granted to the responsible offeror submitting the lowest priced, technically acceptable (LPTA) offer, with the Contracting Officer considering Supplier Performance Risk System (SPRS) data to evaluate item, price, and supplier risk. The current deadline for the receipt of offers has been extended to December 3, 2026, at 4:30 PM local time. The contract specifies a delivery timeframe of 30 days with FOB Destination terms. Inspection and acceptance are to be performed at the source, specifically at the contractor's or subcontractor's plant, though the government reserves the right to conduct additional inspections or Product Verification Testing. Packaging must adhere to MIL-STD-2073-1 and ASTM D3951-18 standards, with specific requirements for electrostatic discharge protection and DLR labeling where applicable. Contractors are required to use the Wide Area Workflow (WAWF) system for electronic invoicing and receiving reports. Additionally, the solicitation mandates compliance with various federal regulations, including Buy American preferences, NIST SP800-171 cybersecurity standards, and the safeguarding of covered defense information.
SPRMM1 DLA Mechanicsburg

POSTED

1 day ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This contract involves the procurement of two units of a frequency reference item requiring repair or modification, identified under NSN 0R-6625-016927542-P8, with delivery terms FOB origin. The item is classified as flight critical, and the government lacks sufficient technical data to enable a full and open competition, necessitating sole source procurement from previously approved suppliers. Any new source seeking approval must provide detailed technical data according to NAVSUP Weapon Systems Support guidelines, which must accompany their proposals. Offers lacking these data or those not demonstrating prior submission will not be considered. The government emphasizes the importance of timely source approval, noting that if new source approval cannot be secured in time, award decisions will prioritize maintaining fleet support. Solicitation is being conducted by the Department of Defense’s Navsup Weapon Systems Support office located in Philadelphia, PA, under the authority permitting negotiation with a single source. Interested suppliers not currently approved may express interest and must submit required data within the specified timeframe, with responses due by late February 2026. The procurement process follows FAR regulations, including qualification at the time of award. Additional resources, specifications, and technical standards are accessible through designated government portals, and contact information for inquiries is provided. The government reserves the discretion to pursue competitive procurement based on responses but currently plans to award only to qualified, approved sources to meet mission-critical requirements.

General Info

Procurement of two flight-critical frequency references via sole source; new suppliers must submit detailed technical data.

NAICS

334412 - Bare Printed Circuit Board Manufacturing

Place of Performance

PA

Set-Aside

NONE

Documents

2

Amendment 0001 to Solicitation NO0383-26-Q-LA63

PDF, High priority: read this firstamendment
High

RFQ NOO383-26-Q-LA63 - Frequency Reference Repair

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support
Contacts1 person available
OfficePHILADELPHIA, PA, 19111-5098, USA
Office AddressPHILADELPHIA, PA, 19111-5098, USA

Full Description

Show more
CONTACT INFORMATION|4|N792.06|LP8|771-229-0469|patrick.j.horan23.civ@us.navy.mil | ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|x||||||||||||x|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT COMBO TYPE |N/A|TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months|60 days after discovery of defect||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|12|334412|750||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Required RTAT: ## 119 days after receipt of asset Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation:A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERSDELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. NAVSUP WSS has been granted a class deviation (CL-00-203) that permits us to use the award forms currently available in our automated procurement system instead of the SF 1449 when conducting procurements for commercial items. This procurement is being conducted in accordance with FAR Part 12, Acquisition of Commercial Products. Information appearing on the face of the DD Form 1155 or SF 26 that conflicts with clauses or provisions contained elsewhere in this solicitation shall be disregarded. Addendum to FAR 52.212-4 Contract Terms and Conditions Commercial Products Under paragraph(a) "Inspection and Acceptance" add the following: 1. FAR Clause 52.246-2 Inspection of Supplies-Fixed Price applies as amended herein. All product audits performed at the discretion of the DCMA QAR shall be conducted by witnessing contractor inspections or tests on a non-interference basis. 2. The contractor shall maintain a quality system that addresses the elements of ISO9001-2000/AS9100B, Quality System Model for Quality Assurance in Design/Development, Production, Installation and Servicing, and a calibration system that addresses the elements of ISO-10012-1, ANSI/NCSL Z540 or an equivalent program approved by the Navy. 3. The government reserves the right to assess the contractor's compliance to its documented quality system throughout the performance of this contract. The quality system procedures, planning, and all other documentation, media, and data which comprise the quality system shall be made available to the government for their review and use. The acceptance of non-conforming supplies is a prerogative of and shall be as prescribed by the government. The government reserves the right to disapprove the quality system or portions there of when it fails to meet its intended objectives. 4. The Contractor shall not make any configuration changes, engineering changes or part number changes to the contract/purchase order items, including, but not limited to, the item's hardware, software or firmware, unless approved by the Procurement Contracting Officer (PCO). In addition, approval by the appropriate technical authority may also be required. Guidance on how to submit a proposed engineering or part number change may be obtained from the PCO. 5. The Contractor shall not manufacture any item for acceptance by the Government that incorporates a known departure from technical or contractual requirements unless a request for a deviation has been approved. Authorized deviations are a temporary departure from the requirements only and do not authorize a change to the item's configuration baseline. Any deviation, major or minor, must be approved by the PCO prior to acceptance. \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;BRANDYWINE COMMUNICATIONS; drawing number ( ;03NF8; ) ;025000002; , Revision ;latest; and all details and specifications referenced therein. 1.3 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: FREQUENCY REFERENCE ;025000002; P/N, ;6625016927542; NSN, ;Available repair manuals, drawings and specifications per p/n requirements; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. FREQUENCY REFERENCE ;BRANDYWINE COMMUNICATIONS; Company Name , ;1153 WARNER AVE,tustin,ca,92780-6458; Address , ;03nf8; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

More opportunities from Department Of Defense → Navsup Weapon Systems Support

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS