Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on February 18, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

700-Kilowatt (KW) Solar Photovoltaic (PV) System Power Purchase Agreement (PPA) At Tenth Avenue Marine Terminal(TAMT)

Closed
21-05State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Road Asset Management
Solicitation # FY27-ENGCP-002-6
The Bulloch County Board of Commissioners is soliciting Statements of Qualifications for project FY27-ENGCP-002-6, focused on Road Asset Management. The selected consultant will be responsible for collecting and analyzing field data, creating a road asset inventory, and developing a Capital Improvement Plan with an outlook extending to FY 35. The scope includes GIS database development, web-based mapping, and the identification of structural hazards and drainage failures to minimize safety risks and legal liability. All prime and sub-consultants must be GDOT Prequalified Contractors as of the submission deadline on November 20, 2026, at 3:00 PM EDT. Proposals are evaluated based on a composite scoring system that weights prime consultant experience and technical approach at 20% each, GIS capabilities at 20%, asset prioritization methodology at 15%, workload capacity at 15%, and past references at 10%. The highest-ranked consultant will be invited to negotiate a contract. Key requirements include a Principal-in-Charge with at least 10 years of industry experience and comprehensive insurance coverage, including professional malpractice and general liability of at least 1 million dollars per occurrence. Submissions are limited to ten pages, excluding mandatory forms and charts, and must include a Non-Collusion Affidavit and Bidder Declaration. Either party may terminate the resulting agreement with 30 days written notice.
Bulloch County Board of Commissioners

POSTED

about 5 hours ago

DEADLINE

in 22 days
NAICS: 541330
New
International
CoT RFP Event Q30-01-2026-27
Solicitation # Q30-01-2026-27
The City of Tshwane is soliciting a service provider for professional engineering services to support town planning subdivision application processes on city-owned properties. The scope of work is divided into three primary categories: Civil Services Reports, Geotechnical Investigations, and Route Determination Reports. All services must be led by a Professional Engineer registered with the Engineering Council of South Africa and must comply with the Gauteng Transport Infrastructure Act, National Building Regulations SANS 10400, and various SANS and SANRAL standards. The project follows a strict timeline, requiring an inception meeting within one month, draft reports within three months, final reports within five months, and project close-out within six months of appointment. The solicitation, numbered Q30-01-2026-27, closes on November 12, 2026, at 10:00. Awards are based on an 80/20 preferential point system in accordance with the Preferential Procurement Policy Framework Act and 2022 Regulations, with specific goals including points for women-owned, youth-owned, and disability-owned enterprises, as well as local economic participation. Evaluation occurs in four stages, starting with administrative responsiveness and a functionality score of at least 70 out of 100. Successful bidders must enter into a Service Level Agreement, with payment terms set at 30 days following the receipt of an invoice. Required submission documents include company registration, tax clearance or a CSD unique pin, and B-BBEE certification.
City of Tshwane

POSTED

about 7 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The Port of San Diego issued solicitation 21-05 for a fixed-price Power Purchase Agreement to design, procure, install, and commission a 700-kilowatt rooftop Solar Photovoltaic (PV) System at the Tenth Avenue Marine Terminal in California. The system is required to achieve a P50 generation of 1,200,000 kWh per year and must be designed to align with the existing structural capacities and warranties of the Warehouse B roof without requiring modifications. Qualified proposers must hold a California Class A, B, C10, or C46 license and include a Licensed Structural Engineer. The Solar PV System will be integrated with a separate Microgrid System, which encompasses the supply and installation of switchgear, a 12-kilovolt transformer, a battery energy storage system (BESS) with necessary foundations, and a microgrid controller. Additionally, the Microgrid System scope includes managing the Interconnection Agreement with San Diego Gas and Electric. Proposals for this project were due by March 23, 2021.

General Info

Fixed-price agreement for 700kW solar PV and microgrid system at Tenth Avenue Terminal.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

1

RFP 21-05: 700 KW Solar PV System PPA at TAMT

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Port of San Diego
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The proposed Solar PV System shall be designed consistent with the existing Warehouse B roof structural capacities and warranty and shall not require any structural modifications (for reference, see Exhibits C, D, E, and H). The Solar PV System will be integrated with a battery energy storage system and microgrid controller (“Microgrid System”) that will be installed independent of the Solar PV System. The Microgrid System includes all supply/installation of switchgear and 12-kilovolt (kV) transformer, battery energy storage system (BESS), microgrid controller, foundations for the BESS, and the Interconnection Agreement with San Diego Gas & Electric (SDG&E). A diagram outlining the scope of the Microgrid System and point of the Solar PV System interconnection is provided in Exhibit A and additional specification information is provided in Exhibit B.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS