Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Minnesota was posted on March 27, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

7031-9003 Siphon Outlet Improvements Temporary Conveyance 24P034

Closed
9007115State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The project involves installing a temporary conveyance system on the 9003 siphons to prevent spillage in the event of failure of the South Junction and/or Manhole 1 structures, prior to their replacement. This system will connect the siphons upstream of the South Junction Structure to the Siphon Outlet Structure and Manhole 6, utilizing pipes installed at an elevation that preserves siphon flow, eliminating the need for pumps. Designed to handle an average flow of 16 million gallons per day and peak flows up to 39 MGD, the work area is environmentally sensitive, requiring all materials to be on-site before commencement. The contractor must expedite material procurement upon contract award and thoroughly review environmental documentation, with efforts to minimize open excavations and dewatering. The solicitation, titled "7031-9003 Siphon Outlet Improvements Temporary Conveyance 24P034," was posted on March 27, 2024, with a response deadline of May 1, 2024. It is issued by the Metropolitan Council of Minnesota under NAICS code 238910, focusing on specialized construction services. The primary contact for the project is Paul Dotson, reachable via email or phone, with additional project details accessible through the provided online link.

General Info

Agency

Minnesota → Metropolitan Council

Place of Performance

MN, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMinnesota → Metropolitan Council
Contacts1 person available
OfficeN/A
Organization / Agency
Minnesota → Metropolitan Council
Office AddressN/A

Full Description

Show more
The work of the project includes installation of a temporary conveyance system on the 9003 siphons. This system will mitigate spillage from the 7031, 9003-A and 9003-B siphons and 7030 forcemain if the South Junction and/or Manhole 1 structures fail prior to replacement. The 9003 siphons will be tapped just upstream of the South Junction Structure and pipes will be installed from the South Junction Structure to the Siphon Outlet Structure and Manhole 6. Pipes will be installed at an elevation that will maintain siphon flow so no pumps will be needed. The conveyance system is designed to accommodate the combined average daily flow of 16 million gallons per day (MGD) and peak flow of 39 MGD. Due to the environmentally sensitive nature of the Work area, all material must be on-site prior to start of work. Contractor must order all materials as soon as the project is awarded and carefully review the Environmental Assessment Worksheet and Attachments. Open excavations and dewatering must be minimized to the greatest extent possible.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS