This Solicitation opportunity from California was posted on October 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The 709 University Avenue Drainage System Replacement Project, solicitation number 816-0423 (Bid# 27-003), is a public works initiative by the Town of Los Gatos, California, managed by the Parks and Public Works agency. The project involves the replacement and rehabilitation of a storm drainage system within a drainage easement, utilizing a combination of sliplining and open-trench replacement. Key technical requirements include the installation of new HDPE storm drain pipe, construction of a new storm drain structure, potholing for utility verification, pressure grouting, void remediation, and full surface restoration. The estimated construction cost is 350,000 dollars, with a completion timeline of 60 working days.
Eligible bidders must hold a Class A contractor's license and be registered with the Department of Industrial Relations. Bids are due by October 28, 2026, and must include bid security equal to 10 percent of the maximum bid amount. The successful contractor is required to provide performance and payment bonds for 100 percent of the contract price and adhere to California Labor Code prevailing wage requirements. Project execution requires a full-time on-site superintendent and strict compliance with the Town of Los Gatos Storm Water Pollution Control Ordinance and the Blueprint for a Clean Bay guidelines. Payment is processed via monthly itemized applications, with undisputed amounts paid within 30 days. Final project acceptance is contingent upon Town Council action or written notice from the Engineer following the completion of all contract requirements and submittals.
General Info
Los Gatos drainage replacement project, $350,000 budget, 60-day timeline, bids due October 28, 2026.
PDF, High priority: read this first1 page · subcontractor-list
HighAI Summary for 2024 Annual Street Repair and Resurfacing Subcontractor List (Project #811-9901): A required submission form for the 2024 Annual Street Repair and Resurfacing project (#811-9901). Bidders must use this document to list all subcontractors performing work exceeding 0.5% of the total Base Bid (or $10,000 for street/highway construction), including license numbers, DIR registration, and the percentage of work performed.
PDF
PDF, High priority: read this first102 pages · ifb
HighAI Summary for 709 University Avenue Drainage System Replacement Project (Bid# 27-003): Issued October 1, 2026, by the Town of Los Gatos, this Invitation for Bids (IFB) seeks a Class A licensed contractor to replace and rehabilitate the storm drainage system at 709 University Avenue. The project includes sliplining, open-trench replacement, and HDPE pipe installation with an estimated cost of $350,000 and a 21-day completion timeline. Bids are due by October 28, 2026, via OpenGov. A mandatory pre-bid meeting is scheduled for October 15, 2026. The document includes a Notice Inviting Bids and Instructions to Bidders, specifying requirements for DIR registration, prevailing wages, and bid security.
PDF
PDF, High priority: read this first73 pages · ifb
HighAI Summary for 709 University Avenue Drainage System Replacement Project (Bid# 27-003): An Invitation for Bid (IFB) issued by the Town of Los Gatos on October 1, 2026, for the replacement and rehabilitation of the storm drainage system at 709 University Avenue. The project includes sliplining, open-trench replacement, and installation of HDPE pipe, with an estimated cost of $350,000 and a 21-day completion window. Bids are due by October 28, 2026, and a mandatory pre-bid meeting is scheduled for October 15, 2026.
PDF
PDF, High priority: read this first73 pages · ifb
HighAI Summary for 709 University Avenue Drainage System Replacement Project (Bid# 27-003): Invitation for Bids (IFB) issued by the Town of Los Gatos on October 1, 2026, for the replacement and rehabilitation of the storm drainage system at 709 University Avenue. The project includes sliplining, open-trench replacement, and HDPE pipe installation with an estimated cost of $350,000. Bids are due by October 28, 2026, at 2:00 pm. A mandatory pre-bid meeting is scheduled for October 15, 2026.
PDF
PDF, High priority: read this first73 pages · ifb
HighAI Summary for 709 University Avenue Drainage System Replacement Project (Bid# 27-003): An Invitation for Bids (IFB) issued by the Town of Los Gatos on October 1, 2026, for the replacement and rehabilitation of the storm drainage system at 709 University Avenue. The project includes HDPE pipe installation, structure construction, and surface restoration with an estimated cost of $350,000. Bids are due by October 28, 2026. The document includes a mandatory pre-bid meeting on October 15, 2026, and requires a Class A contractor's license and DIR registration.
PDF
PDF, High priority: read this first9 pages · amendment
HighAI Summary for 709 University Storm Drain Replacement - Bid Plans Addendum 1: Bid plans and technical specifications for the 709 University Storm Drain Replacement project (Project No. 25-816-0423) for the Town of Los Gatos. This document is Addendum 1, dated 10/26/2026, and includes project area maps, general notes, and specific bid items (1-12) covering traffic control, erosion control, HDPE pipe installation via open trench and sliplining, and catch basin installation.
PDF
PDF, High priority: read this first9 pages · specifications
HighAI Summary for 709 University Storm Drain Replacement - Bid Plans and Specs: Technical design plans and specifications for the Town of Los Gatos Project No. 25-816-0423 (Annual Storm Drain Improvements). Dated September 17, 2026, the document includes a project area map, general notes, and a detailed list of bid items including traffic control, HDPE pipe installation, slip-lining, and pavement restoration.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 709 University Storm Drain Replacement Project - Submittals List: A submittals list dated September 17, 2026, from Sanbell to the Town of Los Gatos for the 709 University Storm Drain Replacement Project. It outlines required documentation for plans (Traffic Control, Erosion, Flow Bypass, Dewatering, Pre-CCTV) and material certifications (Pipe, Catch Basins, Mortar, Sealant, Grout, HMA, and Concrete mix designs).
PDF
PDF, High priority: read this first3 pages · bid-bond
HighAI Summary for Town of Los Gatos Bid Bond Form: A template for a Bid Bond for the Town of Los Gatos. The document outlines the obligations of the Bidder and Surety, requiring a bond sum of 10% of the maximum bid amount. It specifies the required submittals upon notice of potential award, including the executed contract, payment and performance bonds, insurance certificates, and compliance certificates.
PDF
PDF, High priority: read this first5 pages · contract-document
HighAI Summary for Town of Los Gatos Public Works Contract for <Project Title>: This contract document between the Town of Los Gatos and the Contractor formalizes the award and terms for the construction of the <Project Title>. It incorporates all related contract documents including bid proposals, general and special conditions, project plans, and specifications. Key provisions cover contractor obligations, payment terms, completion timeline of 60 working days, liquidated damages for delays, labor code compliance including prevailing wages and DIR registration, workers' compensation certification, conflict of interest restrictions, and general contract provisions such as assignment, governing law, and amendment procedures. The document serves as the final and exclusive agreement for the project work.
PDF
PDF, Low priorityother
LowAI Summary for 70 University Avenue Storm Drain Repair Project - Site Walk Sign-In Sheet: A sign-in sheet for a project site walk held on October 15, 2020, for the 70 University Avenue Storm Drain Repair Project in Los Gatos, CA. The document records attendee names and firms.
PDF
PDF, Low priority12 pages · specifications
LowAI Summary for Blueprint for a Clean Bay: Best Management Practices to Prevent Stormwater Pollution: A guidance booklet developed by the Bay Area Stormwater Management Agencies Association (BASMAA) for contractors and builders. It outlines Best Management Practices (BMPs) to prevent stormwater pollution from construction activities, details requirements for projects over and under one acre, and provides an overview of compliance with the California State Water Resources Control Board General Permit and SWPPP requirements.
PDF
PDF, Low priority1 page · supporting-document
LowAI Summary for Noncollusion Declaration Form: A standard Noncollusion Declaration form to be executed by bidders and submitted with their bid. The document ensures the bid is genuine and not collusive, complying with California Public Contract Code § 7106 and Title 23 U.S.C § 112.
PDF
PDF, Low priorityother
LowAI Summary for Storm Water Pollution Control Ordinance: This document is an excerpt from a municipal ordinance (Article III) regarding Storm Water Pollution Control. It defines key terms such as 'applicable materials', 'impervious surface', and 'NPDES permit', and outlines prohibitions and requirements for non-storm water discharges into the municipal storm drain system.
PDF
PDF, Low priority4 pages · bond-forms
LowAI Summary for Town of Los Gatos 2024 Payment and Performance Bond Forms: This document contains two standardized templates for the Town of Los Gatos: a 2024 Payment Bond and a 2024 Performance Bond. These forms establish the obligations of the Contractor and Surety to ensure payment to claimants and the faithful performance of contract obligations under California law.
Bid #25-816-0423 (Bid# 27-003): The project involves the replacement and rehabilitation of the existing storm drainage system within the drainage easement near 709 University Avenue. Key work items include a combination of sliplining and open-trench replacement of the existing storm drain, installation of new HDPE storm drain pipe, construction of a new storm drain structure, potholing to verify existing utilities and field conditions, pressure grouting and void remediation, trench excavation and backfill, utility coordination, surface restoration, traffic control, and all associated work necessary to complete the project in accordance with the plans and specifications.
More opportunities from California → Parks and Public Works
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.