Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

7110--Eye Clinic Workstations Seattle Intent to award under SAC Contract Listing SDVOSB set aside

Active
OfficialOralRFQFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract entails the provision, design, procurement, and professional installation of high-quality healthcare furniture for the Seattle Eye Clinic Workstations, in compliance with Veterans Health Administration's (VHA) IDIQ specifications and sustainability standards. The scope includes modular desking systems, various seating options, storage solutions, tables, and accessories, all meeting specific VA Puget Sound Healthcare System quality standards. The contractor is responsible for managing the entire process from design through installation, including coordination with manufacturers, delivery logistics, installation, and post-installation services. Deliveries are scheduled with no onsite storage available, requiring precise timing and coordination, while installation must be completed within designated duty hours and maintain a clean, safe work environment. The contractor must also ensure product protection, warranties of at least 10 years, and proper disposal or recycling of packaging and waste materials. Design requirements include providing detailed plans, layouts, and drawings for approval by the VA Interior Designer, along with samples and necessary revisions. Installation demands professional appearance and conduct, adherence to safety protocols, and compliance with VA policies. Post-installation inspection and punch-list corrections are overseen by a designated customer service representative, who also coordinates remediation and final acceptance. The contract outlines strict submission criteria for quotes, focusing on completeness, accuracy, pricing within IDIQ limits, sustainability certifications, and project management plans. The contractor must protect the VA property, manage delivery schedules carefully, and produce thorough documentation throughout the project to ensure quality and compliance with all VA standards.

General Info

Provision, design, and professional installation of VA-compliant healthcare furniture for Seattle Eye Clinic.

NAICS

337214 - Office Furniture (except Wood) Manufacturing

Place of Performance

WA

Set-Aside

NONE

Documents

1

Eye Clinic Workstations Seattle Intent to Award under SAC Contract

DOCX, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

special-notice

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 260-NETWORK Contract Office 20 (36C260)
Contacts1 person available
OfficeVANCOUVER, WA, 98661, USA
Office AddressVANCOUVER, WA, 98661, USA
Contacts
Scott JamesContract Specialist

Full Description

Show more
Page 1 of Page 56 of 70 Page 1 of STATEMENT OF WORK PART A GENERAL INFORMATION 1.0 Introduction The Veterans Health Administration (VHA) has a requirement for healthcare furniture for SEATTLE EYE CLINIC WORKSTATIONS that meet the VHA IDIQ specifications and high-quality threshold while integrating excellent environmental stewardship. This requirement includes new healthcare furniture and professional installation. Service required will be as detailed in SV1 Healthcare Furniture technical requirements per VHA Healthcare Furniture multiple award IDIQ. Healthcare furnishings include, modular desking systems freestanding, multiple chair types, modular system furniture with or without panels, tandem waiting seating, artwork, filing and storage systems, modular cabinetry, modular systems, computer support tools and furniture accessories and related services. The contractor shall provide all labor, materials, equipment, transportation, and supervision necessary to satisfy the needs of each ordering activity. 2.0 Scope of Work The vendor will provide design, procurement, and installation of interior furnishings and fixtures and accessories for offices and public spaces. Interior furnishings and fixtures requested for this project must meet specifications as identified in this scope of work. The products specified meet the minimum quality standards for VA Puget Sound Healthcare System. Furnishings and fixtures shall include the following: Casegoods- Various configurations as identified in IGCE. Refer to Salient Characteristics for specifications Seating- Lounge/guest seating, task chairs, tandem seating Refer to Salient Characteristics for specifications Storage- mobile storage Refer to Salient Characteristics for specifications Tables Occasional Tables / Height adjustable workstations /etc Refer to Salient Characteristics for specifications Accessories- Trashcans, coat hooks, task lights, etc Refer to Salient Characteristics for specifications 3.0 Work Requirement The contractor shall provide and be responsible for the technical assistance, development and generation for final specifications. Single Point of Contact: Dealer will designate a specific customer service representative, further referred to as CSR, to manage the customer service role locally. Manufacturers Representatives: Contractor will identify each manufacturer s representative to answer any questions regarding product and service requests. Coordinate and provide project management of all products and services to manage, design, order, ship, deliver and install new furniture from the manufacturer until final acceptance by the PSHCS Interior Designer & COR Gayle Bart. Only include products specified within the Statement of Work and that match exactly the salient characteristics of the brand name specified. Prepare and provide as built furniture drawings in PDF and AutoCAD. Provide maintenance manuals for all products specified. Only include products specified within the IDIQ. 4.0 Installation Timeframe Furniture delivery and installation will be required in February 2022. Duty hours will be 7:30am to 5:00pm. The Government recognized US holidays are: New Year s Day, Martin Luther King, Jr. Day, Presidents Day, Memorial Day, Juneteenth Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day and Christmas Day. If the holiday falls on Sunday, it is observed on Monday. (adjusted/modified as needed, approved by the Interior Designer/COR/Appointee): 5.0 Design Services, Drawing & Procurement Requirements The Contractor shall provide Design Services, Procurement and Project Management. The CSR will coordinate furniture layouts, quotations, procurement, installation, and phasing schedules as directed by Seattle VA Medical Center s Interior designer and adhere to the following requirements. Drawings and quotations will be labeled appropriately by Building Number, Facility Address, & Project Name. Drawings will specify special installation instructions, data requirements, electrical requirements, and structural support requirements outside of the vendor s scope of services. Complete set of phasing plans with associated dates (these plans shall be updated as needed during the project and each time submitted electronically and in hard copy to the VA POC for approval prior to any changes in scheduling). The detailed installation plans and associated schedule submitted to the VA shall include incorporation of staging areas, the various manufacturers, product lines, dealers, etc. into the plan and schedule. Upon award of the contract, the Vendor is required to update the detailed installation plan as needed, coordinate deliveries, oversee the installation, scheduling and coordination of the various manufacturers, product lines, dealers, etc. Drawings will illustrate 2-D furniture layouts and placements accompanied by 3-D illustrations corresponding to each furniture typical room layout. Quoted line items are to coordinate with approved furniture plan and shall be categorized by functional area. Room designations for all line items are to be identified on the receiving label of each item. Vendor shall provide memo samples of final finish selections to the Interior Designer prior to order placement with manufacturer. These samples are to be organized in a 2 White D-Ring Binder and identify each line item on which the finish is to be used. Vendor shall provide as-built installation drawings to the Interior Designer upon project completion. Quote Submission: The contractors shall submit complete emailed electronic copy portable document format (.pdf) or Microsoft Excel (.xls) format of: Volume 1: (technical) drawings, (floorplans, isometrics, shop drawings, typicals etc.) complete manufacturer s product specifications Bill of Materials tagged per CLIN/ floorplan department and room etc. quantity of man hours for labor/installation project management plan product literature project staffing plan physical finish samples sustainability certification documents complete testing results / certificates mock up samples (list any needed here) warranty. Self-certifying statement confirming ability to meet project deadlines Volume 2: (pricing) price quote with separate line for labor/installation Bill of Materials with subtotals and tagged per CLIN/ floorplan Submissions can be sent in multiple emails to avoid computer system email size limitation, to Krystal Weeks contact@example.gov or Laura Davis contact@example.gov. Quotes submitted by any other method will not be considered. All proprietary information shall be clearly marked. The use of hyperlinks in quotes is prohibited. Late quotes will not be accepted for evaluation. The contractor is responsible for confirming the Government s receipt of the contractor s quote. Pricing must be within the established IDIQ Pricing. Manufacturing Requirements a. The manufacturer shall be expected to provide commercial and healthcare grade furniture. b. Manufacturer shall meet the design, manufacturing, and warranty requirements as outlined in these specifications. c. Lead time should be within industry standard 6-8 weeks from receipt of order (it is expected that there may be a manufacturing delay due to COVID related issues, please notify POC on updates to expected manufacturing lead times). 7.0 Deliveries The contractor will be responsible for coordinating delivery of items between all involved parties, including the facility Interior Designer, the installation contractor, and the manufacturer. For the purposes of this scope the Vendor should plan that there is no available storage on site or at the VA Seattle campus site. The Vendor shall confine all operations on Government premises to areas authorized or approved by the Contracting Officer or his/her authorized representative (POC). Working space and staging areas shall be verified and pre-approved by the POC. Vendor shall execute work in such a manner as not to interfere with work being done by others. Vendor shall always keep roads and hallways clear of furniture, materials, debris, standing/moving equipment, and vehicles. Shipping and delivery charges must be calculated based on the geographical location in which the product will be delivered and installed. Vendor will be responsible for any additional freight charges incurred due to miscalculations. Delivery dates and times will be identified by the Interior Designer and coordinated with the contractor and accommodated by manufacturer. Manufacturer to fabricate and ship in accordance to the established schedule. Early and/or unscheduled deliveries will not be accepted. Rescheduling of shipments will be at manufacturer s and/or vendor s expense. Vendor installation team shall be present at time of each delivery to offload and stage all furniture and equipment in the VA designated location. The facility will not provide staff to assist with this task. 8.0 Installation The contractor will be required to install all products solicited under this RFQ and included in the IGCE. The installation team will always have a professional appearance and demeanor. Laborers will be uniformly dressed, displaying either a company logo or company name badge on his or her attire. In addition, each installer may be required to display a Visitor ID badge that will be assigned for the duration of the installation by the Seattle VA Medical Center Police Service. All labor is to be furnished by the contractor and must be appropriately estimated. The installation contractor is required to verify wall type & conditions to ensure proper installation hardware and tools/machinery are provided for installation. All work is to be completed with the highest level of craftsmanship and in a safe manner and in the allotted time frame. The contractor is to maintain a clean job site during work hours and properly store materials and supplies at the end of each work day. All dust and debris must be cleaned by the contractor- this includes vacuuming and damp mopping when necessary. Immediately after installation and adjustment, clean all surfaces to remove marks, soil, and foreign matter. At project completion, recheck all components and perform all required additional cleaning. Cleaning equipment and supplies will be the responsibility of the contractor and will not be provided by the Seattle VA Medical Center. All packaging and waste are to be recycled and/or legally disposed of. Contractor is required to provide own waste and cardboard dumpsters and shall not be permitted to use any waste disposal site on the Seattle VA Medical Center campus / Renton Veteran Community Housing Clinic Waste disposal in landfills shall be minimized to the greatest extent possible. Of the inevitable waste that is generated, as much as possible shall be salvaged, recycled, or reused. At a minimum, the following waste categories shall be diverted from landfills: clean dimensional wood, palette wood, cardboard, and paper packaging. Vendor shall provide the VA with a detailed report of recycled materials prior to final invoice. Vendor shall assign a specific area to facilitate separation of materials for reuse, salvage, recycling, and return. Such areas are to be kept neat and clean at all times. The contractor will be responsible for organizing, palletizing, and delivering any unused or excess furniture items to an offsite storage facility to be identified by the Seattle VA Medical Center s Interior Designer Contractor is responsible for repair of these areas for any damage caused by the Contractor. All packaging material and debris shall be removed from the site and properly disposed of by the contractor. Any defects in material from installation shall be repaired and damaged products that cannot be satisfactorily repaired shall be replaced. A punch list walk through shall be performed with the contractor s representative. Items on the punch list shall be noted and a response for completion time (expected date of completion) of each item shall be provided from the contractor. Coordinate delivery and installation of items with the Seattle Interior Designer/COR The installation shall occur Monday -Friday between the hours of 6:30-4:30PM. Installation: Ideal completion date: October 5th,2022 Product to be stored by manufacturer/dealer and be delivered to the VA jobsite when date approved by VA Interior Designer/COR. The vendor is to contact the interior designer/COR to schedule delivery to confirm a date, time, and the location. Protect doors, doorways, and corridor walls use for delivery. All services shall be delivered by certified technicians in accordance with manufacturer s recommended instructions. Design Efforts Required The VA Interior Design department has completed the programming and interior design selection for supplying and installing furniture, fixtures and equipment for the Renton Veterans Community Housing Clinic. The specification sheets indicate that a specific product or equal are required for this project. Floor Plans submitted Separately. Stored Product Conditions Product must be protected/maintained in the packaging that it arrived in from the manufacturer. Product must be stored in an area that is clear from aisleways. Product must be stored together as a group during the entire period of performance, until delivery. Product must be clearly labeled/identified as VA property. Vendor Responsibility Vendor is responsible for any damage to product/VA property until VA Interior Designer/COR has accepted complete installation of products Vendor to ensure protection of product/VA property by guaranteeing the replacement of any damages to said product/VA property. Warranty Warranty information provided needs to indicate the length, what is covered, and the usage that warranty covers and must meet or exceed the following criteria: Industry standard minimum of 10+ years. Includes all components and moving mechanisms. Warranty work performed on location at manufacture s expense. Warranties shall be signed by the authorized representative of the contractor. Warranties accompanied by document authenticating the signer as an authorized representative of the guarantor, shall be presented to the owner upon the completion of the project. The vendor shall guarantee that the products are free from any defects in workmanship from the date of delivery/installation 13.0 Final Inspection & Acceptance The CSR will be required to do a post-installation inspection upon project completion. Final Inspection of product is not permitted by the furniture installation team. The vendor s CSR is to be present to conduct the final inspection. The CSR will photograph and document all damaged, deficient, defective or mis-ordered/shipped products at the job site and submit them to the manufacturer for repair or replacement. Upon punch-list completion, CSR is to submit to the Interior Designers a remediation plan to correct deficiencies within two (2) working days Contractor will correct deficiencies and punch list items within ten (10) business days after identification, unless deficiency requires fabrication of replacement parts/pieces in which the time allowance will be increased to thirty (30) calendar days for non-readily available or stock items. CSR shall prepare and provide inventory spreadsheet outlining excess or unused line items during installation and deliver those items to an offsite storage facility to be identified by the Seattle VA Medical Center s Interior Designer. Upon completion of installation and all corrected deficiencies, a receiver will be completed, and the contractor s payment will be authorized. Pricing must be within the established IDIQ Pricing. 14.0 Evaluation Criteria Task order will be evaluated on: Bill of Materials with subtotals and tagged per CLIN / floorplan department and room etc. PDFs of detailed and dimensioned: Plan, 2-D and 3-D drawings of each workstation (and/or) products with multiple parts list to represent exactly what is being included in task order and to determine accuracy. Cut sheets with product detail for each line item. Labor/Services appropriate to the scope of work. (no pricing included) Project staffing plan appropriate to scope of work Project management plan appropriate to scope of work Sustainability Certification 15.0 General Product Requirements All finished surfaces shall be free of scratches, mars, dents, or blemishes, and withstand staining, and exhibit to flaking, cracking, or loss or adhesion. Furnishings shall have smooth finishes with no hazardous projections, sharp corners, or detail, which can be hazardous and cause personal injury or damage to clothing. All products and components will be new; refurbished products will not be accepted. Substitutions of the finishes shown/identified in the General Requirements section shall not be accepted. Pricing shall include these exact finishes and colors or as chosen by the VA Interior Designer/COR. See attachment for technical requirement of products. Basis of Design may be used, but are provided for layout and aesthetic purposes only and does not indicate a preferred manufacturer by the VA. All contracted personnel must always have identification on them while on site/VA property. It is the responsibility of the vendor confirm correct quantities prior to order. All finishes to be confirmed prior to manufacturing/delivery by interior designer/COR. Contractor must supply a detailed staffing and project schedule for this install. After award, vendor shall be able to field verify the install site. Any modification after award shall be approved by the VA Contracting Officer and POC/Interior Designer prior to order/implementation. Manufacturers or Equal To Minimum Technical Requirements (MTR), VA Healthcare Furniture IDIQ- See Attachment Minimum Technical Requirements for Healthcare Furniture and Modular Millwork Parts See attachment for technical requirement of products. Requirements of Space- Refer to attached drawings for any dimensions not included See attachment, Salient Characteristics , for specifications 16.0 Services Service required is detailed below: SV1 Design Contract Tasks/Requirements The contractor shall attend a minimum of three (3) in-person meetings at the Puget Sound Health Care System. Time and date will be determined by VA Point of Contact. Gayle Bart, Interior Designer to review final award with VA Interior Designer and End Users and to make necessary revisions. During first meeting the contractor shall provide the Interior Designer with the Auto-Cad drawings to 1/8 scale drawings showing layouts of awarded product. The contractor shall allow for three (3) revisions per line item included in design services including updating Auto-Cad Drawings and PDFs as request by VA Interior Designer. The contractor shall be responsible for taking and applying accurate field measurements to ordered product for verification of correct sizing. Auto-Cad drawings may not be accurate finished dimensions and may not be used in place of field measurements. The Vendor shall be liable for any incorrect field measurements leading to incorrect product order. The contractor shall be responsible for providing all sample materials for awarded product (2-4Day Delivery) as requested by VA Interior Designer. The product must not be placed into production without clearance from the VA COR. The contractor shall provide final, clean 1/8 scaled drawings of product layout for sign-off prior to scheduling manufacturing. The contractor shall track manufacturing schedule and notify VA Interior Designer with updates of estimated completion date by email. The contractor shall attend a post-installation meeting to assess, address, and document any punch-list items and shall submit to the VA Interior Designer a remediation plan within 5 business days. The contractor shall provide 30 days free storage. 17.0 Drawings: (Submitted separately) Protection of Property The Contractor shall perform an inspection of the buildings and grounds with the COR prior to commencing work. Contractor shall protect all items from damage. The Contractor shall take precaution against damage to the buildings, grounds and furnishings. The Contractor shall repair or replace any items related to buildings or grounds damaged accidentally, or on purpose due to actions by the Contractor, utilizing materials of the same quality, size, grade and color, to match existing work. To ensure that the contractor shall be able to repair or replace any items, components, on the buildings or grounds damaged due to negligence and/or actions taken by the Contractor. The Contractor shall communicate with the COR to resolve all repairs beyond simple surface cleaning. Concurrence of the COR is required before the Contractor may perform any significant repair work. In all cases, repairs shall utilize materials of the same quality, size, texture, grade, and color to match adjacent existing work. The Contractor shall be responsible for the security of the areas in which the work is always being performed prior to completion. The Contractor shall maintain accountability and control of any keys provided and shall return them to the COR upon completion of the work. Contractor shall provide floor protection while working in all VA facilities. All material handling equipment shall have rubber wheels. Delivery Contractor shall contact the COR at least 14 business days prior to the start of work/shipping to ensure that the building is ready for install. In the event there is a delay in delivery, Contractor must notify the assigned VA COR immediately in writing, preferably via email. Contractor shall provide the COR with scheduled date and time that the delivery truck will be arriving at least 24 hours minimum in advance. Contractor must ensure that the driver of the delivery vehicle has copies of the Bill of Materials/delivery orders and shall not attempt to deliver any items before the scheduled delivery date. Receive and Unload If the Contractor is unable to complete the assembly and placement of all unloaded items before the end of the workday, the Contractor will be responsible for moving these items to a secure location, until the next available workday. The Contractor will be responsible for moving the items from the overnight storage site to its designated position in the building. The Contractor shall verify and inspect all items. Any and all deficiencies (damage/overage/shortage) shall be brought to the attention of the assigned VA CO in writing, preferably via email, immediately upon identification. The Contractor shall store damaged items in the location designated by the COR. The Contractor shall maintain a complete file of all documents relating to each discrepancy and copies of all Discrepancy Reports shall be forwarded to the COR on a daily basis. Contractor shall repair or coordinate with the COR for replacement of damaged, defective, or missing items. Assembly and final acceptance Contractor shall be responsible for all safety and security guidelines within the area in which work is being performed, to include securing any contractor-owned tools or equipment, and any on-site storage being utilized. The contractor shall install all items in accordance with each requirement statement and basic component floorplan, panel plan and electrical plan, designed and provided by the contractor with each task order. Contractor shall uncrate all items received and perform all required assembly in accordance with the manufacturers instructions. Contractor shall prevent its personnel from entering any area other than the designated work area. The Contractor shall maintain a means of egress within all designated work areas to comply with fire codes. Contractor shall inspect to ensure that the furniture is free of surface dirt, clean and polished, free of defects, and that the installation is complete and ready for use. The Contractor shall do a final walkthrough with COR and provide a punch list before releasing crew for the day. Jobsite Cleanliness Contractor will be responsible for the removal and disposal of all trash/debris connected with uncrating and assembling all items installed under this contract. Final Acceptance by the Government will not occur until all installed items have been wiped cleaned and debris/dust connected with installation is removed from the VA site. Recyclable cardboard products shall be disposed of in accordance with applicable statutes, in respective containers. The contractor is responsible for providing trash containers at an offsite facility. Packing materials will not be stored in the buildings for any period exceeding 24 hours. The Contractor shall ensure its personnel eat, drink, or smoke only in designated areas. Personal trash (food wrappers, drink containers, etc.,) shall be removed from the site on a daily basis by the Contractor. Warranty Items The warranty of an item is to start on the date of acceptance of the products/services by the Government VA COR. The Contractor agrees to furnish, without cost to the Government, replacement of all parts and material which are found to be defective during the warranty period. The cost of installation and travel of replacement material and parts shall be borne by the Contractor. The Government maintains the option to modify the normal work week, days and hours, as necessary for the accomplishment of VHA mission.

Similar Contracts

Same NAICS industry code

NAICS: 337214
New
International
RFP NS27-20261092 Furniture Solicitation (Phone Booths and Pods)
Solicitation # NS27-20261092
The Natural Sciences and Engineering Research Council and the Social Sciences and Humanities Research Council of Canada are seeking a contractor for the supply, delivery, installation, and warranty services of a minimum of eight single-occupancy phone booths, with an option for additional units. These booths are intended to provide private spaces for employees to conduct calls and meetings. Technical requirements include acoustic panels with a minimum rating of 30db, integrated intake and outlet fans for air circulation, and dimmable, sensor-activated LED lighting. The procurement is issued under the Furniture for Workspaces Supply Arrangement E60PQ-140003/D and is designated as a General Stream Procurement. All deliverables must be received at 125 Zaida Eddy Private in Ottawa, Ontario, by February 26, 2027, with a standard lead time of 8 to 10 weeks for delivery and installation. The contractor must adhere to strict environmental standards, ensuring packaging is reusable, returnable, or recyclable, and must take back any non-recyclable materials at no cost to the government. Security requirements include maintaining a valid designated organization screening and ensuring personnel hold reliability status for site access. Final acceptance is contingent upon a joint walk-through and the resolution of any identified deficiencies within specified timeframes.
Natural Sciences and Engineering Research Council

POSTED

about 20 hours ago

DEADLINE

in 14 days
View Details
NAICS: 337214
New
Federal
Cubicle Installation
Solicitation # FA301627Q0011
The Department of Defense, specifically the 502nd Contracting Squadron, is conducting market research through a Request for Information (RFI) to identify qualified small business offerors for the installation of cubicle furniture at JBSA Randolph Building 399. This sources-sought effort is designated as a Total Small Business Set Aside, utilizing NAICS code 337214 and PSC 7110. The scope of work requires the contractor to provide all materials, labor, management, and tools necessary for the installation, leveraging existing LAN infrastructure where possible. The project includes a performance extension of 52 days and requires adherence to strict technical standards, including UFC 3-580-01 for telecommunications and electrical installations, UFC 2-600-01 for fire protection, and MIL-HDBK-419 for grounding and shielding. Key deliverables include a comprehensive milestone installation schedule, which serves as a technical evaluation factor, weekly soft-copy progress reports, and as-built engineering drawings. The contractor must coordinate storage and staging with 502 CS/SCXP 30 days prior to installation and conduct a final walk-through 72 hours before close-out. Security requirements include potential DoD Secret Security Clearances for personnel handling network equipment and a formal site visit request process for base access. All on-site testing must follow Original Equipment Manufacturer manuals and vendor procedures, with a formal test plan due 10 days before installation begins. Interested small businesses must submit their company identification and socioeconomic status to Darreus Hiers and Joseph Gyakari by 10:00 A.M. Central Time on October 3, 2026.
FA3016 502 Cons Cl

POSTED

1 day ago

DEADLINE

in 5 days
View Details
NAICS: 337214
New
Federal
Office Furniture - Site Visit Required - 100% Small Business Set-Aside
Solicitation # N6600127Q6018
Solicitation N66001-27-Q-6018 is a 100% Small Business Set-Aside for the Naval Information Warfare Center (NIWC) Pacific to acquire design services and Furniture, Fixtures, and Equipment (FF&E) for multiple rooms across Buildings A33, A35, and A40 in San Diego, California. The project involves creating furniture plans and providing FF&E for eight specific rooms, with a required period of performance of 8 to 12 weeks following the award. This is a Firm-Fixed-Price contract under NAICS code 337214, with a small business size standard of 1,100 employees. Interested offerors must be an Authorized Source and maintain active registration in the System for Award Management (SAM). The government will award the contract to the responsive vendor whose quote is most advantageous, utilizing a trade-off analysis where non-cost factors—specifically design quality and FF&E quality—are significantly more important than price. Design evaluations will focus on space utilization, traffic flow, and aesthetic appeal. Site visits are scheduled for November 2nd and 3rd, 2026, and must be coordinated with James Blake by October 30th, 2026. All questions are due by November 16th, 2026, and the final RFQ closing date is November 27th, 2026. Submissions must include design layouts, AutoCAD drawings, a Bill of Materials, and an estimated project schedule in PDF or Excel format.
Niwc Pacific

POSTED

3 days ago

DEADLINE

in 29 days
View Details
NAICS: 337214
New
International
Department of Justice Canada - CAT 1,2,3,5,6 Office Furniture
Solicitation # 1000037089
The Department of Justice Canada is soliciting offers for the purchase, delivery, and installation of office furniture to be delivered to 284 Wellington Street in Ottawa, Ontario, by January 25, 2027. This requirement is restricted to holders of the Workspaces Supply Arrangement (SA) series E60PQ-140003/D and covers Product Categories 1, 2, 3, 5, and 6, including workstation systems, work surface products, filing and storage, ancillary products, and collaborative products. The procurement follows the PSIB stream, and the contract will be awarded to the compliant offer with the lowest evaluated price, with evaluations conducted on a per-category basis. Under Amendment 001, the solicitation end date was extended to November 5, 2026, and the scope was modified to remove the Category 6 Collaborative Table and its associated installation table while updating task light specifications. Technical requirements mandate that furniture meet ANSI/BIFMA X5.5 and UL 962 standards, utilize SCS Global GreenGuard Gold certified low-emitting adhesives, and incorporate FSC-certified wood cores. Additionally, the contractor must adhere to strict green procurement policies, ensuring packaging is reusable, returnable, or recyclable. Delivery is required under DDP Incoterms 2020, and there are no security requirements associated with this contract.
Department of Justice

POSTED

3 days ago

DEADLINE

in 7 days
View Details

More opportunities from Department Of Veterans Affairs → 260-NETWORK Contract Office 20 (36C260)

Same awarding agency

NAICS: 238220
New
Federal
J041--White City B249 SE HVAC Repair
Solicitation # 36C26027Q0102
Solicitation 36C26027Q0102 is a total set-aside for certified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) issued by the Department of Veterans Affairs. The contract requires the repair of a Mitsubishi R-410A comfort-cooling system (Serial 07W0090) located on the southeast side of Building B249 at the VA Southern Oregon Rehabilitation Center and Clinics in White City, Oregon. The scope of work includes leak detection, brazing repairs with nitrogen purge, refrigerant recovery, evacuation to less than 500 microns, and recharging the system to nameplate requirements. The contractor must provide a detailed service report documenting the root cause, repair actions, and compliance with EPA Section 608 and VHA ICRA/PCRA controls for occupied healthcare facilities. The period of performance is 30 calendar days from the Notice to Proceed. Award will be granted to the responsible offeror whose proposal is most advantageous to the government, considering price and other specified factors. Key regulatory requirements include adherence to OSHA 29 CFR 1910.147 for lockout/tagout and 29 CFR 1910.333 for electrical safety. Payments will be processed via Electronic Funds Transfer, and invoices must be submitted electronically through the Tungsten Network. Offerors must provide their Unique Entity Identifier and maintain firm pricing for 60 calendar days from the response deadline of November 10, 2026.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

1 day ago

DEADLINE

in 12 days
View Details
NAICS: 334513
New
Federal
Boiler Plant O2 Sensor Replacement
Solicitation # 36C26027Q0101
The Department of Veterans Affairs, through the Network Contract Office 20, is conducting market research via a Sources Sought Notice for a firm-fixed price service contract to perform inspection, testing, maintenance, and repair of three model 6888 Rosemount flue gas analyzers. The work will be performed at the VA Southern Oregon Rehabilitation Center and Clinics in White City, Oregon. The primary scope involves replacing internal O2 analyzer components using original equipment manufacturer parts, specifically 18 inch standard cells, 18 inch heater strut assemblies, Hastelloy with Vee Deflectors for service up to 1300 degrees Fahrenheit, and new flange gaskets. The period of performance is six months, with on-site work required during core hours of 7:00 AM to 4:00 PM, Monday through Friday. This opportunity is designated as a total Small Business Set Aside under NAICS code 334513, with a size standard of no more than 750 employees. Qualified sources, including SDVOSB and VOSB entities, must provide company details, SAM.gov UEI numbers, and proof of manufacturer authorization if they are not the OEM. Contractors must employ qualified personnel, maintain general third-party liability insurance per FAR 52.228-5, and adhere to NEC, OSHA, and JCAHO standards. Deliverables include written daily reports to the Deputy Chief Facilities Management and testing documentation provided to the Contracting Officer's Representative. Interested parties are requested to provide a courtesy quote and capability statement to assist the government in evaluating price reasonableness and market availability.
Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables

POSTED

3 days ago

DEADLINE

in 5 days
View Details
NAICS: 325998
New
Federal
Microbiological media purchase order for Clinical Microbiology laboratory.
Solicitation # 36C26027Q0104
The Department of Veterans Affairs Network Contracting Office 20 is seeking sources for a microbiology testing media purchase order to support the Seattle Division of the VA Puget Sound Medical Center. This requirement covers a wide range of critical supplies for identifying pathogenic organisms in veteran patients, including long shelf-life products like Oxidase and Indole, perishable selective agar, biochemical test kits, and ATCC organisms mandated by the College of American Pathologists for quality control. The contract is structured with a base year running from February 1, 2027, to January 31, 2028, followed by four subsequent one-year option periods ending January 31, 2032. Deliveries are to be made to the Microbiology Lab in Seattle, with weekly shipments typically scheduled for Tuesdays and individual requests fulfilled as available. Due to the perishable nature of many items, the vendor must provide tracking information, and the cost of next-day delivery for all perishable goods must be included in the individual item price. All temperature-liable products require immediate refrigeration upon delivery. Invoicing is processed through the Austin Automated Payment System in Texas, and the vendor must provide SDS sheets for all media upon request. This sources-sought notice specifically looks for capable sources, including qualified SDVOSB/VOSB entities, with a response deadline of November 10, 2026.
All Other Miscellaneous Chemical Product and Preparation Manufacturing

POSTED

3 days ago

DEADLINE

in 12 days
View Details
NAICS: 238220
New
Federal
Z1DA--CON-NRM-668-22-106 Correct Domestic Water System
Solicitation # 36C26027R0014
Solicitation 36C26027R0014 is a negotiated request for proposals for the Department of Veterans Affairs to correct domestic water system deficiencies in Buildings 1 and 12 at the Mann-Grandstaff VA Medical Center in Spokane, Washington. The project is 100% set aside for Service-Disabled Veteran-Owned Small Businesses under NAICS 238220, with an estimated contract magnitude between $1 million and $2 million. The primary objective is to modify hot and cold potable water distribution systems to comply with VHA Directive 1061 for the prevention of scald injuries and Health Care-Associated Legionella Disease. The scope includes all labor, materials, and equipment, with a specific requirement to flush potable water dispensing fixtures twice weekly from installation until final acceptance. The period of performance is 275 calendar days from the Notice to Proceed. The government will utilize a Best Value tradeoff process for award, prioritizing technical experience and past performance over cost. Technical evaluations will favor offerors with demonstrated experience in phasing and Infection Control Risk Assessment (ICRA) within 24-hour operational emergency rooms. Proposals must be submitted in three separate volumes—Technical, Past Performance, and Price—by November 23, 2026. Awardees must provide performance and payment bonds, adhere to Davis-Bacon Act wage determinations, and comply with Buy American requirements. Additionally, the contractor must maintain strict confidentiality regarding sensitive information and provide a one-year warranty on all materials and installation.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

3 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS