This Solicitation opportunity from Ohio was posted on November 20, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for El Camino Real Conveyance Improvements Project - Addendum No. 1: Addendum No. 1 for the El Camino Real Conveyance System Improvements project (City Project No. 46S003-46S17-0553-46320), dated September 20, 2023. This amendment corrects a pipe diameter discrepancy in the contract plans and adds specific access and egress requirements for business deliveries and garbage collection to the contract book specifications. Bidders must acknowledge receipt of this addendum by signing and returning the attached acknowledgement sheet via email and with their bid documents. The bid opening is scheduled for October 5, 2023, at 2:00 pm.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for El Camino Real Conveyance Improvements Project - Addendum No. 2: Addendum No. 2 for the El Camino Real Conveyance System Improvements project (City Project No. 46S003-46S18-0553-46320) issued on September 21, 2023. This amendment updates the bid opening date to October 17, 2023, at 2:00 p.m. and adds a second mandatory prebid conference on September 28, 2023. Bidders must attend one of the prebid meetings to submit a bid. The addendum includes instructions for acknowledging receipt and submitting the acknowledgement with the bid documents.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for El Camino Real Conveyance Improvements Project - Addendum No. 3: Addendum No. 3 for the El Camino Real Conveyance System Improvements project (City Project No. 46S003-46S18-0553-46320), dated September 29, 2023, issued to update the advertisement for bid scheduled for October 17, 2023. Changes include modifications to contract plans regarding CIPP lining work as an additive/deductive bid item, updates to the Bid Form moving Bid Item 17 to additive/deductive items, and revisions to the Measurement and Payment section clarifying payment terms for the Flores St. Diversion Structure bid items. Bidders must acknowledge receipt of this addendum by signing and returning the attached acknowledgement sheet.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for El Camino Real Conveyance Improvements Project - Addendum No. 4: Addendum No. 4 for the El Camino Real Conveyance System Improvements project (City Project No. 46S003-46S18-0553-46320) issued on October 10, 2023. It updates the Bid Documents with changes to the Contract Book, specifically revising Specification Section 00 30 00 - Basis of Bids to add bid items 45, 46, and 47. It also adds paragraphs 1.46, 1.47, and 1.48 to Specification Section 01 13 00 - Measurement and Payment, detailing measurement and payment procedures for handling and disposal of contaminated spoil and groundwater. Bidders must acknowledge receipt of this addendum in their bid submissions.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for El Camino Real Conveyance Improvements Project - Addendum No. 5: Addendum No. 5 for the El Camino Real Conveyance System Improvements project (City Project No. 46S003-46S18-0553-46320), dated October 12, 2023, issued by the City of San Mateo Department of Public Works. This addendum updates the Bid Documents including revisions to Specification Sections 00 30 00 (Basis of Bids), 01 13 00 (Alternative Bid Item No. 41), 33 05 63 (Precast Concrete Diversion Structure), 01 01 00 (Summary of Work), and deletes Section 00 43 33 (List of Equipment Manufacturers). It also includes instructions for bidders regarding DBE outreach forms and acknowledgement of the addendum. The addendum modifies bid item classifications, payment terms, and clarifies bid submission requirements.
PDF
PDF, High priority: read this firstbid-form
HighAI Summary for El Camino Real Conveyance Improvements Project - Addendum No. 5 Revised Bid Form: This document is the Bid Form for the El Camino Real Conveyance System Improvements project, Contract No. 46S003-46S18-0553-46320, issued by the City of San Mateo. It includes instructions for bidders to complete the form using typewriter or ink, and outlines bidder acknowledgements, representations, and certifications. Key content covers bidder's acceptance of terms, site familiarity, compliance with laws and regulations, non-discrimination policies, prevailing wage requirements, and certification against fraudulent or collusive practices. The form is part of Addendum No. 5 and is essential for submitting a stipulated price bid for the project.
PDF
PDF, High priority: read this firstbid-form
HighAI Summary for El Camino Real Conveyance Improvements Project - Bid Form Addendum 3: This document is the Bid Form for the El Camino Real Conveyance System Improvements project, Contract No. 46S003-46S18-0553-46320, issued by the City of San Mateo. It includes instructions for bidders to complete the form, acknowledgements, representations, and certifications related to the bid submission. The form requires bidders to agree to terms, confirm site familiarity, compliance with laws, labor codes, non-discrimination policies, prevailing wage scales, and business license requirements. It also includes certifications against fraudulent or collusive practices. This version is identified as Addendum 3 and is critical for submitting a compliant bid.
PDF
PDF, High priority: read this firstifb
HighAI Summary for El Camino Real Conveyance Improvements Project - Notice Inviting Sealed Proposals: This document is the Notice Inviting Sealed Proposals for the El Camino Real Conveyance System Improvements project in San Mateo, California. It details the scope of work including installation and rehabilitation of various sewer lines and manholes, traffic control, paving, and other related tasks. The document specifies bidder requirements such as licensing, bid bond, and compliance with non-discrimination and prevailing wage laws. It provides instructions for obtaining contract documents, bid submission deadline (2:00 p.m., October 5th, 2023), and bid opening procedures. The estimated construction cost is $17,000,000. The notice also outlines the City's rights regarding bid acceptance and contract award procedures.
PDF
PDF, High priority: read this firstq-and-a
HighAI Summary for El Camino Real Conveyance Improvements Project - Q and A No. 1: This document dated September 21, 2023, is a Questions and Answers Notice for the El Camino Real Conveyance System Improvements Project under the Clean Water Program, City of San Mateo. It provides formal written responses to questions submitted by prospective bidders between September 14 and September 20, 2023. Key clarifications include confirmation that the pipe size between SSMH 557-15 to SSMH 304 is 8" PVC as per the plan view, and that trenchless work on Pacific Blvd is not included in the contract scope. Relevant boring information is available in Appendix A of the Geotechnical Sampling Data Report. This document aids bidders in understanding project specifications and scope.
PDF
PDF, High priority: read this firstq-and-a
HighAI Summary for El Camino Real Conveyance Improvements Project - Q and A No. 2: This document dated October 5, 2023, is a Questions and Answers Notice for the El Camino Real Conveyance System Improvements Project by the City of San Mateo Department of Public Works. It provides formal responses to bidder questions submitted between September 14 and October 3, 2023. Key topics addressed include pipe sizing clarifications, scope exclusions, bid schedule interpretations, DBE advertising requirements, bid date extension, pre-bid meeting details, contaminated soil disposal allowances, testing responsibilities, pipeline abandonment specifications, and location references for specific bid items. The document references related addenda and contract sections to guide bidders.
PDF
PDF, High priority: read this firstq-and-a
HighAI Summary for El Camino Real Conveyance Improvements Project - Q and A No. 3: This document is a Questions and Answers Notice dated October 6, 2023, for the El Camino Real Conveyance System Improvements Project by the City of San Mateo Department of Public Works. It provides formal responses to bidder questions submitted between September 14 and October 5, 2023. Key topics addressed include pipe sizing clarifications, scope exclusions, bid schedule interpretations, DBE advertising requirements, bid date extension, pre-bid meeting details, contaminated soil disposal allowances, testing responsibilities, pipeline abandonment methods, bid item clarifications, trench paving details, traffic control during construction, and field office requirements. The document references multiple addenda and contract sections to guide bidders.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Washington County Northern Environmental Center Bid Package No. 3: This Invitation for Bid (IFB) is for the Washington County Northern Environmental Center Project, Bid Package No. 3, covering pavement surfacing, roadway widening, turn lanes, signal system, and fiber optics. The bid opening is scheduled for 2:00 p.m. on August 6, 2024, at the Washington County North Maintenance Shop in Stillwater, Minnesota. Major quantities include pavement marking removal, wearing and non-wearing course mixtures, fiber optic trunk cable, and ground-in solid lines. Bidding documents are available digitally via QuestCDN for a fee, and bids must be submitted electronically. A bid bond of at least 5% of the total bid is required. Washington County reserves the right to reject any or all bids and does not discriminate in employment or service provision. The project is advertised from July 5 to August 6, 2024.
PDF
PDF, Low prioritybid-results
LowAI Summary for El Camino Real Conveyance Improvements Project - Bid Results: This document presents the bid results for the El Camino Real Conveyance Improvements Project. The bid opening occurred on October 17, 2023, at 2:00 PM in the City Clerk's office. The project is managed by the Public Works Department, with Tom Williams as the Acting Engineering Manager overseeing the bid opening. The document lists multiple bidders along with their total bid amounts and rankings. There were five addendums issued for this project. The bid results table includes bidders such as JMB Construction, K.J. Woods Const. Inc, Mountain Cascade, and others, showing their respective bid amounts and ranks.
PDF
PDF, Low prioritypresolicitation
LowAI Summary for El Camino Real Conveyance Improvements Project - City Project No. 46S003: This document is a presolicitation notice for the El Camino Real Conveyance Improvements Project, City Project No. 46S003, issued by the City of San Mateo, California, dated August 29, 2023. It provides information on where to access the contract book, plans, and proposal forms via the Barker Blue web link for interested parties to review and prepare for the upcoming procurement.
PDF
PDF, Low prioritydbe-outreach-form
LowAI Summary for El Camino Real Conveyance Improvements Project - DBE Outreach Form: This document is a Disadvantaged Business Enterprise (DBE) Outreach Form for the El Camino Real Conveyance Improvements Project. It requires contractors to document their outreach efforts to solicit participation from DBE firms, including types of outreach, providers, dates, and outcomes. The form references Section 00 10 01 for additional instructions and includes examples of outreach such as newspaper publications and website queries. Contractors must submit this form with their bid and provide a subcontractors list if contact or quotes are received from DBE firms.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for El Camino Real Conveyance Improvements Project - Notice of Intent to Award: This document is a Notice of Intent to Award for the El Camino Real Conveyance System Improvements project (City Project # 46S003-46S18-0553-46320) dated October 26, 2023. It announces that the City of San Mateo intends to award the construction contract to JMB Construction Inc., the lowest responsible bidder, for the amount of $11,847,106.00. The award is scheduled to be finalized at the November 20, 2023 City Council Meeting.
PDF
PDF, Low prioritysign-in-sheet
LowAI Summary for El Camino Real Conveyance Improvements Project Pre-Bid Meeting II Sign-in Sheet 9-28-23: This document is the sign-in sheet for the El Camino Real Conveyance System Improvements Project Pre-Bid Meeting II held on September 28, 2023, at 10:30 AM in San Mateo, CA. It lists attendees with their names, companies, phone numbers, and email addresses. The sheet is used to record participation in the pre-bid meeting for this project.
PDF
PDF, Low prioritysign-in-sheet
LowAI Summary for El Camino Real Conveyance Improvements Project Pre-Bid Meeting Sign-in Sheet 9-12-23: This document is a sign-in sheet for the Pre-Bid Meeting of the El Camino Real (ECR) Conveyance System Improvements project held on Tuesday, September 12, 2023, at 1:00 PM in San Mateo, CA. It lists attendees with their names, companies, phone numbers, and email addresses. The sheet serves as an attendance record for the meeting related to the project.
Response deadline changed from Oct 17, 2023 to Apr 16, 2024. The notice title changed. NAICS code added: 339950. The notice description changed.
Notice updated
Response deadline changed from Apr 16, 2024 to Jun 4, 2024. The notice title changed. NAICS code changed from 339950 to 541611. The notice description changed.
Notice updated
Response deadline changed from Jun 4, 2024 to Aug 6, 2024. The notice title changed. NAICS code changed from 541611 to 237990. The notice description changed.
Notice updated
Response deadline changed from Aug 6, 2024 to Dec 24, 2024. The notice title changed. NAICS code changed from 237990 to 541519. The notice description changed.
Notice updated
Response deadline changed from Dec 24, 2024 to Nov 27, 2024. The notice title changed. NAICS code changed from 541519 to 611430. The notice description changed.
Response Deadline
Deadline has passed
Submission Closed