Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

725-6BB-1199- Directional Boring Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Caltrans has approved a temporary encroachment permit for Zayo Group, LLC. to conduct directional boring along Interstate 10 at Post Mile 17.12 in Los Angeles, installing fiber optic cable within conduit beneath the state right-of-way. The project involves excavating 272 linear feet with a maximum depth of 54 inches and a width of 12 inches, with no relocation of public utilities or acquisition of new right-of-way. Work will include necessary traffic control measures to ensure public safety and minimize disruption during construction. The project is listed under Permit Number 725-6BB-1199 and was posted for forecasting on July 24, 2025, under Caltrans District 7 in Los Angeles. Primary coordination is handled by Susan Koo, Senior Environmental Scientist, and Michael Pogue, Zayo’s Project Manager, with contact information provided for direct inquiries.

General Info

Zayo to install fiber optic cable via directional boring under I-10 in Los Angeles, no right-of-way acquisition.

Agency

California → Caltrans, District 7 - Los Angeles

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 7 - Los Angeles
Contacts2 people available
OfficeN/A
Organization / Agency
California → Caltrans, District 7 - Los Angeles
Office AddressN/A
Contacts
Susan KooSenior Environmental Scientist
Michael PogueProject Manager

Full Description

Show more
Caltrans approves of the encroachment permit that Zayo Group, LLC. proposes to excavate 272 linear feet via directional boring to install fiber optic cable in conduit within Caltrans right-of-way along Interstate (I-)10 at Post Mile (PM) 17.12, in the City of Los Angeles, Los Angeles County. Zayo Group, LLC. is requesting a temporary encroachment permit to access Caltrans right-of-way to perform the above-mentioned work, as well as to perform any associated traffic control activities. Excavation will have a maximum depth of 54-inches, a maximum width of 12-inches and a maximum length of 272 linear feet. No public utilities will be relocated, and no new right-of-way will be acquired for the project.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Federal
Luke AFB AUX Airfield Modernization
Solicitation # FA488726R0011
The Department of the Air Force, through the 56 Contracting Squadron, is soliciting proposals under solicitation number FA488726R0011 for the modernization of the auxiliary airfield at Luke Air Force Base in Arizona, with the procurement strictly limited to SBA-certified Women-Owned Small Businesses (WOSB). The contract, classified under NAICS code 237130 for Heavy and Civil Engineering Construction, requires offerors to be actively registered in the System for Award Management (SAM) and certified as a WOSB prior to award. Proposals must be submitted electronically no later than 31 July 2026 at 0200 PM MST via email or the DoD Secure Access File Exchange (DoD SAFE) system, with all submissions structured into three distinct volumes: Technical, Past Performance, and Price, each adhering to strict formatting rules including 12-point font, 1-inch margins, 1-line spacing, and page limits of 15 pages for the Technical volume and 20 pages for Past Performance. The solicitation emphasizes compliance with Federal Acquisition Regulation (FAR) provisions, including clauses on anti-kickback procedures, contractor reporting obligations, cybersecurity safeguards, quality control, and suspension of work, with deviations in effect for multiple clauses related to SAM registration, reporting, and inspection standards. The scope of work involves the engineering, furnishing, installation, and testing of replacement channel banks and new fiber optic cable systems at the auxiliary airfield, with performance expected to span 180 calendar days after issuance of the Notice to Proceed. Contract administration is governed by the Wide Area WorkFlow (WAWF) system for invoicing and payment processing, with payment to be made to the designated DoDAAC F87700 at Luke AFB, Arizona. Evaluation will follow a trade-off approach between Technical (construction work plan), Past Performance, and Price, where superior technical and performance capabilities may justify higher pricing. Proposals rated Marginal or Unacceptable in Technical or Limited Confidence or lower in Past Performance are ineligible for award. Special requirements include the use of independent, third-party Special Inspectors and Quality Control Managers not affiliated with the contractor, compliance with OSHA and NFPA standards, submission of a Special Inspections Project Manual, validation of testing laboratories by the USACE Material Testing Center, and adherence to detailed packaging and marking standards under 49 CFR for any hazardous materials. Documentation deliverables include as
FA4887 56 Cons Cc

POSTED

1 day ago

DEADLINE

in 17 days
View Details
NAICS: 237130
New
Federal
Y--Stegall Substation Stage 07 Phase 01
Solicitation # 89503226BWA000075
The Stegall Substation Stage 07 Phase 01 Project involves the replacement of aging and obsolete equipment at the substation with modern, reliable alternatives to enhance system performance and safety. Key upgrades include removing the 1960s-era control building and installing a new one, replacing over 30 disconnect switches, eliminating problematic brown glass insulators, reconducting and uprating the main bus, replacing two 115kV oil circuit breakers, and swapping the outdated 1990s GE D20 RTU with three modern SEL RTACs for improved control and monitoring. Additionally, a transfer bus dead end structure will be added between the 230kV east and west interconnects to increase operational flexibility. All work is focused on extending the substation’s operational life and ensuring grid reliability. This solicitation, numbered 89503226BWA000075, is issued by the Department of Energy’s Western-Rocky Mountain Region office located in Loveland, Colorado, with a response deadline of August 10, 2026. The contract is a Total Small Business Set-Aside under FAR 19.5 and falls under NAICS code 237130 for Electric Power Construction. The point of contact for inquiries is John W. Pratt, reachable via email at jpratt@wapa.gov or phone at 720-962-7166. The project is intended for small business contractors, and all work must be performed in accordance with federal procurement guidelines for energy infrastructure modernization.
Western-Rocky Mountain Region

POSTED

1 day ago

DEADLINE

in 14 days
View Details